Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Hoisting Systems At Ozark Lead Co.By M. C. Young
The Ozark Lead Company operating facilities are located in Reynolds County at the south end of the "New Lead Belt" of southeast Missouri. Development of this wholly owned subsidiary of Kennecott Coppe
Jan 1, 1975
-
Hoisting Technology ù Going to New Capacities and DepthsDrum winders have now been built to attain depths of 3000 m and more in a single lift in accordance with the South African Code of Practice SABS 0294, which was introduced at the time of the last hois
Jan 1, 2005
-
Holden Mine — Application of Jet Grouting to Improve Stability of a Tailings Embankment in a Narrow Mountain ValleyBy P. Crouse, J. Obermeyer
"INTRODUCTION Site location and history The Holden Mine is a former underground copper mine that was developed and operated by the Howe Sound Mining Company (Howe Sound) from 1938 to 1957. The mine is
Jan 1, 2017
-
Holding Back the Bay: Performance of Jet Grout in Hydraulically Placed Fills - NAT2024By Roger Escoda Estelrich, Joan Carles Casado Ortega, Mitchell Gerdau, Jose Raul Martinez, Jeb Pittsinger, Frank Perrone
The existing Chesapeake Bay Bridge-Tunnel complex is being expanded to include the Parallel Thimble Shoal Tunnel. This will be a subaqueous bored crossing between two islands constructed for the origi
Jun 23, 2024
-
Holding Back The Watchung MountainsBy Ryan C. Linthicum
A system of steel sheeting and multiple levels of high capacity double corrosion protected soil anchors were used to restrain a major slope failure that occurred at the base of the Watchung Mountains
Jan 1, 2003
-
Hole Deviations in Mining Operations: Types, Sources and EffectsBy Sam Kangwa, Thomson Sinkala
Th e re are three basic types of hole deviations in long hole d ri l l i n g , n a m e l y collar i n g , alignment and tr a j e c t o r y dev i a t i o n s . In mining, the accur a cy in drilling has
Jan 1, 2004
-
Hole Diameter: Does it Affect Vibration Attenuation?By Tyler Acorn, Paul Worsey, Nathan Rouse
The effect of the hole diameter on vibration attenuation has not been incorporated in most vibration models in the blasting industry. In current vibration models, the charge weight and the distance fr
Jan 1, 2013
-
Holistic Approach On ?Sustainable Growth? Of Mineral Processing IndustriesBy T. C. Rao
This presentation identifies how mineral (coal included) processing profession should look at the challenges (threats) being faced by mineral industry. Presently, the focus is more on supply and deman
Sep 1, 2012
-
Holistic Approach to Study Gravity Flow at the Kiruna Sublevel Caving MineBy M Wimmer
LKAB operates two underground iron ore mines located in the northern part of Sweden, both using sublevel caving (SLC) as the mining method. Knowledge of the mechanisms of gravity flow is important sin
May 9, 2016
-
Holistic Management of Sulfides at Rio Tinto Iron Ore's Pilbara Mine SitesRio Tinto Iron Ore (RTIO) manages eleven mines in the Pilbara region, Western Australia. Three of these mines have previously or are currently mining black shale that contains varying amounts of pyrit
Jan 1, 2009
-
Holistic planning and approval of sustainable lignite mining and utilizationBy L. Kulik, J. den Drijver
Rhenish lignite will continue to play an indispensible role in the energy mix of the German Federal Republic for a long time to come. The use of lignite for electricity generation, upgrading and, if n
Jan 1, 2011
-
Holistic scientific approach to address wall damage and berm loss from blasting in large open cut metal minesBy Tapan Goswami, Stephen Jeric, Geoff Brent
Highwall failures in large deep open cut mines have very significant safety and commercial implications. There are many factors influencing the stability of highwalls. The major influence is the inter
Jan 1, 2011
-
Holistic Thermal Assessment And Control Of Ground Freezing For A New Underground StationBy Christian Leble, Dr. -Ing. Jakob Vogelsang, Dr. -Ing. Oksana Solt, Dipl. -Ing. Joachim Meier, Dr. -Ing. Wolfgang Orth
In the course of closing the gap between the Brandenburg Gate and Alexanderplatz, the Museum Island station was built by Implenia Construction GmbH. The tunneling for the platform hall took place on a
May 1, 2022
-
Hollinger Shaft PracticeBy V. J. Southey
HOLLINGER mining operations have required development by 24 vertical shafts having a total length of 28,160 feet. Seventeen of these are sunk from surface and seven are interior shafts. Four surface s
Jan 1, 1939
-
Hollow Core Bar Micropiles - Design Parameters Interpreted From 404 Load TestsBy Jesús E. Gómez
This work is a continuation of a paper presented in the 32nd DFI Annual Conference, Colorado 2007, titled ?Hollow Core Bar Micropiles - Design parameters interpreted from 260 load tests.? The first pa
Jan 1, 2008
-
Holographic Testing Method of RockBy Duk-Wom Park
INTRODUCTION he most important information required for the engineering design of structures in rock is its inherent rock properties. Without providing adequate parameters on the rock property, hi
Jan 1, 1986
-
Holt-McDermott Milling OperationBy R. H. Colquhoun
"INTRODUCTION The Holt-McDermott Mine is wholly-owned gold mining operation of American Barrick Resources Corp. that begun operations in June 1988.The property is located 0.5 km. south of Highway 101
Jan 1, 1989
-
Homestake Mining Company's Carrier-Current Shaft Signaling SystemBy John F. Wiggert
DURING the early years of Homestake operations, shaft signaling from the cage tenders to the hoisting engineers was done by mechanical means. Small steel cables or jointed steel rods were suspended in
Jan 1, 1941
-
Homestake Mining Company, Ruby Hill Mine: A Case Study On How To Streamline The NEPA Process During Mine Permitting Using Properly Designed And Executed Natural Resource Baseline StudiesBy C. L. Wilsey, K. M. Oakes, W. J. Reich, M. J. Protani
The time frame required to complete the National Environmental Policy Act (NEPA) process for a new mine, or for the expansion of an existing mine, can range between 9 months to 24 months, or more. Th
Jan 1, 2001
-
Homestake's Bulldog Mountain Carbon-In-Pulp Silver PlantBy Steven Mitchell
BACKGROUND Homestake Mining Company began milling operations at the Bulldog Mountain Mine near Creede, Colorado in 1969. The Bulldog Mill, rated at 350 tpd, produces a bulk flotation condentrate a
Jan 1, 1983