Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Fortrac® Geogrids For Mine Roof ControlBy Ray Brandon
The recent introduction of polymer geogrids for ground control purposes in underground mines allows mine operators more flexibility in choosing improved products for several applications. This is evid
Jan 1, 1996
-
Forty Year History of Testing at NIOSH’s Mine Roof Simulator. What have we learned?By Timothy J. Matthews, Timothy J. Batchler, Daniel J. McElhinney
The National Institute for Occupational Safety and Health’s (NIOSH) Mine Roof Simulator (MRS) at the Pittsburgh Mining Research Division was commissioned for operation in 1981. The MRS was originally
-
Forum on "Ball Mills Using Steel Vs. Pebble MillsBy J. M. Hemstock, H. L. Ames
THESE forums have been held annually since they were introduced by Mr. L. E. Djingheuzian in 1957. The response of millmen to questionnaires such as the one this year is ample evidence of the interest
Jan 1, 1961
-
Forum on Ball and Rod Mill LinersBy W. H. Zieman
"THIS IS THE THIRD of the consecutive Annual Forums on Grinding that were instituted by Mr. L. E. Djingheuzian in 1957. The first was on the subject of Ball Milling (Transactions, Volume LX, 1957) and
Jan 1, 1959
-
Forum on Ball MillingMR. J. F. MYERS, Consulting J3eneficiation Engineer, Greenwich, Conn.: In the written discussion contributed by Mr. F. C. Bond in item ( 2) (page 515), speaiking about the significance of the ratio of
Jan 1, 1957
-
Forum On Open Pit Mining - Tungsten Carbide Bits for Blockholing at AjoBy ALFRED T. BARR
In certain areas of the New Cornelia pit, considerable secondary blasting is necessary to reduce oversized boulders, formed from primary blasting, to pieces which will pass the 41/2-cu yd dippers on t
Jan 1, 1949
-
Forum on Rod and Ball Mill LinersBy W. H. Zieman
NORMAN WEISS, Milling Engineer, American Smelting• and Refining Company: The subject of the Forum on Rod and Ball Mill Liners is very fascinating, and there is no end of discussion when operators get
Jan 1, 1959
-
Forum on the Non-Cataracting Ball MillBy L. E. Djingheuzian
ANON-CATARACTING (N-C) ball mill is so operated that the balls are not thrown in-ward at the top of their paths. The result is to maintain, in the mill, a quiescent pool in which classification will o
Jan 1, 1958
-
Forum: The Role of Government Departments in the Minerals IndustryI am wearing two hats today. When the invitations went out to participate in this forum, two were received in the head office of the Department of Lands and Survey - one addressed to the Director-Gene
Jan 1, 1976
-
Forward and reverse numerical modeling of the nanoindentation of coatingsBy W. Beres, Li. J.
The finite element method (FEM) has been applied to investigate the stress fields and deformation of a TiN/Ti-6A1-4V coating/substrate system subjected to nanoindentation. MSC Patran and MSC Marc were
Jan 1, 2004
-
Forward Osmosis for Industrial Process Water Recovery: The Case of TMA-CO2-H2O as Draw SolutionBy V. G. Papangelakis, T. Clark, G. Kolliopoulos
Sustainability of the hydrometallurgical industry requires the development of processes for effective water recovery; if process water is recovered and recycled, fresh water intakes will be reduced. F
Jan 1, 2015
-
Fosterville Gold Mine Heated Leach ProcessBy M Binks
The Fosterville Gold mine is located approximately 20km to the East of Bendigo in central Victoria. The gold at Fosterville occurs as solid solution within disseminated arsenopyrite and pyrite. The Fo
Aug 8, 2011
-
Fosterville gold mine – breaking the mould for Victorian goldBy N Phillips
Fosterville gold mine recently celebrated production of its one millionth ounce of gold based firmly within a history of refractory sulfide gold mining. Compared with other Victorian gold mines, the d
Sep 20, 2017
-
Foundation Base Material Strength Assessment for Drilled Pipe Piles using Force and Displacement DataBy Patrick J. Hannigan, Geir Veslegard, Frank Rausche, Rozbeh B. Moghaddam
A common type of deep foundation used in Norway to support bridge structures is the drilled pipe piles (piles) filled with concrete reinforcement after installation. The standard installation practice
Jan 1, 2018
-
Foundation Behaviour Of A Large HS-Train Viaduct After 4 Years' OperationBy Michel Bustamante
The Arbre viaduct, 200 metres long, is the most important structure on the Belgian portion of the High Speed Train line between Paris and Brussels. The particular geotechnical conditions of the soil w
Jan 1, 2002
-
Foundation Challenges And Innovative Solutions: The Wharf Phase 2, Washington, DcBy Aaron L. Sacks, David R. Good, Srinivas Yennamanda, Joseph K. Carey
Construction of Parcels 6 and 7, the second phase of The Wharf, began in 2019 and geotechnical construction was completed by December 2020. The overall project consisted of horizontal site, parks, and
Oct 1, 2022
-
Foundation Conditions, Cart Creek Bridge Daggett County, UtahBy Wilbur J. Morin
Construction of Flaming Gorge Dam in northeastern Utah necessitated the construction of a new state highway, Utah-260, to provide access to the dam and the town of Dutch John. A 550-foot arch structur
Jan 1, 1963
-
Foundation Construction Challenges At 100 11th Avenue In Manhattan - Osterberg Cell Load Test In Mica SchistBy Cem Altuntas
This paper is the second in a series of two describing the design and construction of a foundation for a major high-rise real estate development on the west side of Manhattan, N.Y. The foundation memb
Jan 1, 2008
-
Foundation Design And Construction Challenges For The Phoenix Sky Train ProjectBy John C. Niedzielski
The PHX Sky Train is a five mile long automated people mover system located at Phoenix Sky Harbor International Airport. Phase I of the PHX Sky Train includes the design and construction of 227 drill
Jan 1, 2010
-
Foundation Design and Construction Challenges with Marsh Deposits in a High Seismic Risk ZoneBy M. Reza Saberi, T. Ted Miyake
Driven piles are a common tool in any engineer’s toolbox for supporting large structures over very soft ground, especially in high seismic risk zones. Challenges include achieving sufficient vertical
Jan 1, 2018