Search Documents

  • CIM
    Feasibility of Gamma Activation Analysis for Bulk Gold Ore Sorting

    By C. Tissot, R. Palmer

    "Due to the low concentrations of gold, direct measurement of gold concentration in ore on belt has not been seriously considered to now. Pre-concentration or sorting strategies have largely consisted

    Jan 1, 2017

  • SME
    Feasibility Of In Situ Leaching Of Metallic Ores Other Than Copper And Uranium

    By George M. Potter

    Under contractural arrangements with the Bureau of Mines, Mountain States Research and Development, Inc. (MSRD) completed a technological investigation to determine the feasibility of in situ mining o

    Jan 1, 1981

  • CIM
    Feasibility of iron recovery from Mount Wright tailing material

    By John A. Meech

    "Oleic acid flotation of Mount Wright thickener underflow tailing material has been shown to be capable of increasing plant recovery by 3%. High levels of oleic acid addition (1.5 kg/t) are required,

    Jan 1, 1981

  • CIM
    Feasibility of long-term ground control with stainless steel friction rock bolts

    By P. K. Kaiser, S. M. Maloney, S. P. Singh

    "Corrosion of underground support measures constitutes a concern to industry in both safety and economic terms. It also represents a potential market for corrosion resistant materials such as stainles

    Jan 1, 1990

  • AUSIMM
    Feasibility of Narrow Vein Mining Using a Mechanical Rock Splitter

    By S Planeta

    The use of explosives in underground mining has its drawbacks, particularly in the case of thin or narrow vein type deposits. Due to that, there is a need to develop more discriminative and safe rock-

    Jan 1, 2003

  • SAIMM
    Feasibility of recovering metals from associated slags

    By M. Wang, Z. Sui, T. Lou

    After smelting, the associated mineral ore accompanying Valuable Metal Compounds (VMC),such as titania and borate in BF., most of the VMC were separated from the metal into the molten slag that is an

    Jan 1, 2004

  • SME
    Feasibility Of Solution Mining For Sodium Carbonate At Searles Lake, California ? Introduction

    By James Giulianelli

    Personnel at the Jet Propulsion Laboratory (JPL) are studying the technology and applications of salt-gradient solar ponds (see below) for both electrical and thermal energy generation. The brine extr

    Jan 1, 1981

  • CIM
    Feasibility of Tailings Reclamation for Underground Paste and Hydraulic Backfill Applications

    By K. Tarr

    Acid-producing mine tailings are present at many active and inactive mine sites and pose an environmental liability due to the potential for acid rock drainage. Acid rock drainage originating from a t

    Aug 1, 2013

  • SAIMM
    Feasibility of tailings retreatment to unlock value and create environmental sustainability of the Louis Moore tailings dump near Giyani, South Africa

    By N. K. Singo, J. D. Kramers

    The reprocessing of tailings resources to extract gold on an industrial scale has become common practice. While these projects are common in the Witwatersrand basin, similar low-technology processes a

    Jul 1, 2021

  • NIOSH
    Feasibility Of Using Laser-Based Vibration Measurements To Detect Roof Fall Hazards In Underground Mines

    By Peter Swanson

    One of the primary methods for analyzing roof stability in underground mines is the age-old method of “roof sounding” where a miner taps on the roof and listens for the hollow sound of loose blocks of

  • AUSIMM
    Feasibility Studies, EPCM and the Environment ù Case Studies in Integrated Mine Development

    By R Aseervatham

    The fast tracked mine development strategy attempts to blend feasibility studies and engineering/commissioning functions into a streamlined process. In this compressed process, environmental issues ar

    Jan 1, 1999

  • SME
    Feasibility Study And Design Of A New Underground Coal Mine Developed From Open Cut Highwall In Indonesia

    By Takashi Sasaoka

    About 200 M tons of coal were imported into Japan in 2007 and Indonesia was its second largest exporter, accounting for about 30 M tons (12% of the total imported coal). Indonesia produced about 200 M

    Jan 1, 2009

  • SME-ICGCM
    Feasibility Study And Design Of A New Underground Coal Mine Developed From Open Cut Highwall In Indonesia (25d3d094-fa9d-4970-a166-6a4fe20badce)

    By Takashi Sasaoka

    About 200 M tons of coal were imported into Japan in 2007 and Indonesia was its second largest exporter, accounting for about 30 M tons (12% of the total imported coal). Indonesia produced about 200 M

    Jan 1, 2009

  • AUSIMM
    Feasibility Study and Economic Evaluation for Deposit No 3 of Gol-e-Gohar Iron Ore Deposit

    By H Dehghan Jan Abadi, K Shahriar

    The iron ore district of Gol-e-Gohar (GEG) is located 60 km south-west of the city of Sirjan, in the Kerman Province of the Islamic Republic of Iran. Six exploration targets have been identified and i

    Jan 1, 2007

  • CIM
    Feasibility Study and Optimization of Dissolution of Vanadium from Mining Residue via Biological Approach

    By H. Gharahbagheri, S. Shafiei Zadeh, H. Hassan Nejad, Reza Roostaazad

    In this paper, dissolution of vanadium from mining residue, in which vanadium is associated intimately with magnetite ore, was investigated via both bacterial ( aerobic and anaerobic) and fungal activ

    Jan 1, 2014

  • SAIMM
    Feasibility Study Of A 180 Km Nickel Ore Pipeline - Rheological Factors Influencing Slurry Pipeline Design

    By L. J. Park, A. D. Thomas

    Gladstone Pacific Nickel Limited (GPNL) is proposing to develop the Marlborough nickel deposit in central Queensland and the Yarwun Refinery in Gladstone, Australia. The project proposes to connect th

    Jan 1, 2007

  • SME
    Feasibility Study Of Applying Geostatistics To Coal Washability Data ? Introduction

    By Young C. Kim

    Use of geostatistics to solve mining problems is gaining importance as the cost of developing new mines is increasing and there is a need to mine more marginal deposits. But, until recently, coal comp

    Jan 1, 1982

  • SAIMM
    Feasibility study of electricity generation from discard coal

    By A. Engelbrecht, B. North, B. Oboirien

    "There is large electricity generation potential in discard coal, both in stockpiles and current arisings. Power stations with a combined capacity of up to 18 GW electrical (GWe) could be fuelled by d

    Jan 1, 2015

  • SAIMM
    Feasibility Study Of Replacing Bottom Dump Trucks With Rear Dump Trucks At Kleinkopje Colliery

    By T. Tamenti

    The purpose of the project was to conduct a feasibility study to determine if the current operating bottom dump trucks that haul coal should be replaced with rear dump trucks. The engineering availabi

    Jan 1, 2007

  • SAIMM
    Feasibility study of replacing bottom dump trucks with rear dump trucks at Kleinkopje colliery - Synopsis

    By T. Tamenti

    The purpose of the project was to conduct a feasibility study to determine if the current operating bottom dump trucks that haul coal should be replaced with rear dump trucks. The engineering availabi

    Jan 1, 2007