Compendium Of Searles Lake OperationsBy Jr. Moulton
Extractions of minerals from Searles Lake brines have taken place since 1873. Early operations were for borax and raw trona found on the surface, expanded after 1914 to include potash, salt cake, and
Jan 1, 1980
-
Application of Weldment Fatigue Methods to Conveyor Pulley DesignBy Tim Wolf
The paper "Weld Notch Affects on Pulley and Belt Conveyor Reliability" has done an excellent job of describing theoretical fatigue and fracture mechanics methods used in modern weld design. From this
Jan 1, 1998
-
Geotechnical Design Of Large Openings At DepthBy Evert Hoek
Two types of failure have to be considered in designing large openings: (a) Structurally controlled failure caused by discontinuity intersections, (b) Stress induced instability which occurs whe
Jan 1, 1981
-
Some Geologic Factors In The Location Design And Construction Of Large Underground Chambers In RockBy Alberto S. Nieto
The general role of geology in the location of different types of large underground chambers is discussed. Aspects of structure, rock type and state of stress are discussed at some length. Some practi
Jan 1, 1983
-
Structural Stability of Coal Mine Entry Intersections-Case StudiesBy R. Kneisley, D. Conover, K. Haramy, K. Hanna
INTRODUCTION Coal mine entry intersections are high-risk areas for roof falls due to inherently wide roof spans, excessive stress, and variable intersection shapes resulting from breakthrough misa
Jan 1, 1986
-
Microscopic Digital Image Analysis Of Gold Ores: A Critical Test Of Methodology, Comparing Reflected Light And Electron MicroscopyBy E. Berrezueta
Automatic digital phase imaging should yield unbiased and representative characterizations of gold ores. However, this is not a simple tusk due to low gold grade, fine grain size, possible complex min
Jan 1, 2003
-
Analysis And Modeling Of Longwall Face-To-Face TransfersBy C. Patrick
Longwall face-to-face transfers can cost over $100 per minute in lost production potential and $100,000 for personnel and supplies. Such high cost makes extensive planning and control of the transfer
Jan 1, 1993
-
Improving Grinding Efficiency By Rationed Ball Charging At Amax's Climax Molybdenum MineBy Robert R. Dorfler
AMPS[. has completed a rationed grinding ball test in a 2.93 m x 2.93 m ball mill at Climax Molybdenum Company. The test consisted of purging the ball distribution formed by charging 100%, 76 mm carbo
Jan 1, 1981
-
Recent Expansion of Morenci's In-Pit Crushing and Conveying SystemBy Terry B. Linde, William M. Dowall
The recently completed In-Pit Crushing and Conveying Project at Phelps Dodge's Morenci Mine is rated among the world's leading materials handling projects. The operation involves the crushin
Jan 1, 1993
-
Modern Visualization to Aid in Communication of Mine Planning UncertaintyBy Chris Roos
The mining industry has made strides in planning for operations to be safe for the workforce and public, to protect the natural environment, and to maximize value for shareholders. However, many of th
Jun 25, 2023
-
Automating A Sand And Gravel Plant ? HistoryBy Paul G. Mahoney
The original Radum aggregate plant, built by Henry Kaiser in 1931, is the oldest of the nearly 200 individual operations established by the Kaiser companies. Since that time it has been producing aggr
Jan 1, 1970
-
High Temperature Testing of Burden Materials ? IntroductionBy R. Wild
[When a blast furnace has a certain defined burden and is operated under fixed conditions of blast temperature, etc., the fuel efficiency is determined by the extent to which the reducing gases can re
Jan 1, 1964
-
Reverse Performance Characteristics Of Main Fans In An Oil Shale Mine (6abed845-6a21-4d68-a894-f0f3fd923fa3)By V. Rajaram
A mine fire or roof collapse may necessitate the reversal of main fans to isolate the fire or provide an escapeway. Hence, to assist the mine operator in estimating the flow and pressure during revers
Jan 1, 1985
-
Comparison Of Volumetric And Section Area Particle Compositions Using The Gaudin Random Mineral Liberation ModelBy R. L. Wiegel
A well-defined geometric model for a mineral system and its liberation by size reduction is used to show the relationship between true volumetric particle composition and the composition estimates obt
Jan 1, 2010
-
Sizing And Operating Continuous Thickeners ? IntroductionBy J. H. Wilhelm
Continuous thickeners can be sized either from previous experience, continuous pilot-scale test results, or from batch settling tests. Although it is a relatively simple process to size full-scale thi
Jan 1, 1979
-
The Dissolution Behavior Of Silver In Ammoniacal Solutions With Cupric AmmineBy Y. Guan
The dissolution behavior of silver in ammoniacal solutions with cupric ammine as an oxidant has been investigated using a rotating disc electrode. The rates of dissolution of silver were determined by
Jan 1, 1994
-
Matching Longwall And Continuous Miner Productivity Requirements (d66c0f4b-81e9-4fa7-8594-9a8230ea387f)By M. P. Miano
Matching the productivity gains of continuous mining machines with the ever increasing performance levels achieved by longwall units has required creative thinking to assure that development is comple
Jan 1, 1993
-
Innovations In Geoscience Modelling: Practical Solutions For Environmental ProblemsBy E. A. Rychkun
Mining and environmental objectives have traditionally been in conflict. This conflict reflects a delicate balance between the need to spend money to protect the environment, and the need to save mone
Jan 1, 1993
-
The Development Of A Pc Image-Based On-Line Particle Size Analyzer (481780a2-1087-47c7-9def-7030cfb48bc0)By C. L. Lin
A PC image-based, on-line instrument for the measurement of coarse particle size on a conveyor belt is under development. Both the hardware and software required to implement such a system are discuss
Jan 1, 1992
-
Coal Preparation Plant Facilities Old Ben Mine No. 21 Sesser, Franklin County, IllinoisBy J. W. MacDonald
PROPERTY AND PRODUCTION: Around 100 Million Tons of Recoverable Coal are available from the approximate 10,000 acres allocated to the mine. Over 1300 acres of surface land holdings extend well beyond
Jan 1, 1961