Cryogenic Refuge Alternative Supply System (Cryorass) Tested in a Built-In-Place RABy D. F. Doerr, E. Blalock, D. R. Bush, K. D. Cohen
"BACKGROUND The design, development, fabrication, and test of a cryogenic supply for a refuge alternative is part of a larger effort funded by the National Institute for Occupational Safety and Health
Jan 1, 2016
-
Up-to-date Excavation, Support, and Lining Solutions Meet Timing Requirements for the First Two Tunnels of the 2006 Winter Olympic GamesBy Georgios Kalamaras, Chiaia Dinu, Platania Paolo, Alessio Carlo, Giampiero Cirvegna, Claudio Santucci
The Project alignment initiates north of Pinerolo, along the State Road 23[S.S. 23] that is one of the principal arteries to the northwestern Alps where a number of Olympic events for the 2006 Winter
Jan 1, 2005
-
Geologic Factors In Longwall DesignBy L. P. Johnson
Longwall mining has gained acceptance as a safe method of maintaining coal production where conventional systems were unsuccessful or uneconomic due to bad roof conditions (Kuti8). One of the major pr
Jan 1, 1977
-
Behavior of Full-Scale Welded-Wire Screen for Large Mine Roof Skin FallsBy T. M. Klemetti, T. J. Batchler, T. Matthews
From 2013–2017, there were over 1,120 documented injuries, including fourteen fatalities, from ground falls in underground mines in the United States (MSHA 2017). The majority of these ground-fall inj
Jan 1, 2019
-
Initial Filling of 15 km Long, 10.50 m Diameter Voluminous Water Conductor System Constructed in Fragile Himalayan Geology - With Specific Reference to SJVN’s Rampur Hydro Electric Project (412 MW) - IndiaBy Rakesh Sehgal, Pushkar Verma, Mohit Sharma
"SJVN Limited successfully commissioned its Rampur HEP (412 MW) in 2014. The project has been planned to operate in tandem by directly utilizing the Tail Water of SJVN’s prestigious Nathpa Jhakri Hydr
Jan 1, 2016
-
Construction Uses - Lightweight AggregatesBy Bruce H. Mason
Lightweight aggregates are classified as those minerals, natural rock materials, rock-like products, and byproducts of manufacturing processes that are used as bulk fillers in lightweight structural c
Jan 1, 1994
-
High Performing HMA Design OptimizationBy O. F. Brown
The use of quality materials (aggregates and asphalt binder) in optimal proportions is the key to producing optimally performing hot mix asphalt (HMA). The Superpave mix design standard in the US intr
Jan 1, 2012
-
Mystery Of The Missing Grade And RecoveryBy S. Ripke
Between 2002 and 2004, the performance of a six million ton per year iron ore beneficiation plant dropped significantly. In a classic case of “who done it,” was it the mine, the concentrator, an ore c
Jan 1, 2007
-
Design and Engineering during the Construction of Los Leones Station (Line 6, Santiago Subway, Chile)By Jaime Adasme, Héctor González, Benjamín Celada
"INTRODUCTION Santiago de Chile is a 7 million inhabitant city which has a 103 Km long subway network operated since 1975 by Metro S.A. This network is used on a daily basis by 2.3 million people. In
Jan 1, 2016
-
A New Model For Blast Fragmentation Prediction Based On Multivariate Analysis - IntroductionBy T. Hudaverdi
Several studies have been conducted on blastability and prediction of fragmentation. The term blastability is used to refer the susceptibility of the rock to blasting and is closely related to fragmen
Jan 1, 2011
-
Accurate monitoring and control of flotation cellsBy Carl Pinches
Underground or surface mining is only the first stage in the ore mining process. Once the ore is mined, it is transported to the surface for further processing. Generally, this is done to extract the
Jan 1, 2010
-
Ghana: Gold, Diamonds And MoreBy K. Grubaugh
Ghana’s physiographic and geologic features are the basis for its long mining history. The Gold Coast colony has been a significant producer of gold. The gold of the Akan forest (Ghana) was a terminus
Jan 1, 2001
-
Liebherr?s T282 B trucks operating in BrazilIn September, a fleet of 363-t (400-st) Liebherr trucks became operational in Brazil and have already begun moving iron ore in Para state. Prior to the arrival of the the trucks the Brazilian fleet
Jan 1, 2010
-
An Evaluation Of The Strength Of Slender PillarsPillars with width to height ratios of less than 1.0 are frequently created in underground hard rock mines. The strength of slender pillars can be estimated using empirically developed equations. Ho
Jan 1, 2006
-
Impact of air velocity and support advance on shield-generated dustSteady increases in longwall production have required operators to apply greater quantities of ventilating air in an effort to control and dilute respirable dust. Significant increases in shearer spee
Jan 4, 2010
-
The Hallandsås Dual Mode TBMBy Werner Burger
The Hallandsås project with a long history, first started in 1991, is well known in the tunneling community. In the past it has been stopped twice for technical and environmental reasons. The third at
-
Energy Conversion Processes With Intrinsic Co2 SeparationBy R. Leithner
The need/wish to sequestrate CO2is based on the assumption of the International Panel of Climate Change (IPCC), that CO2 maybe the major driver in climatic changes, i.e. especially the anthropogenic C
Jan 1, 2004
-
Back Injury Control Measures For Manual Lifting And Seat Design (713e5a18-b501-4cad-ba17-ce99f61f5c68)By S. Gallagher, A. Mayton
Introduction The mining industry has long been associated with a high incidence of low back disorders and pain (Klein et al. 1984, Leigh and Sheetz 1989, Brinckmann et al. 1998). It is believed th
Jan 1, 2007
-
Large Scale Three-Dimensional Numerical Simulation Of Longwall MiningBy D. Park, V. Gall
The three-dimensional finite element technique combined with a progressive failure approach were used to simulate stress distributions in a complete mine section that occur in response to a longwall m
Jan 1, 1992
-
Reaction Kinetics Of Ferrous Regeneration For Alternate Anode Reaction TechnologyBy E. A. Sarver
The Fe(II) regeneration process is an important aspect of Alternate Anode Reaction Technology (AART) for copper electrowinning (EW). In AART, Fe(II) is oxidized to Fe(III) at the anode during EW, and
Jan 1, 2007