Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SAIMM
    Critical investigation into the problems surrounding pillar holing operations

    By L. Mpolokeng, J. P. Labuschagne, H. Yilmaz

    "An investigation into pillar cutting was carried out at a platinum mine on the western limb of the Bushveld Complex. The focus was on crush pillar design and implementation in order to ultimately imp

    Jan 1, 2015

  • SAIMM
    Optimization of geological lead-time in a feasibility study drill out—Two Rivers Platinum, Mpumalanga, South Africa

    By Hornsey R., P. van der Merwe

    The Two Rivers Project is a feasibility study to evaluate the UG2 chromitite layer on Dwarsrivier372KT, Mpumalanga Province, South Africa. The project, which commenced in August 2001, is expected to r

    Jan 1, 2003

  • SAIMM
    Modelling Explosive/Rock Interaction During Presplitting Using ALE Computational Methods

    By R. P. Jensen

    This is a sampling of the papers presented at the conference, the proceedings can be bought from the SAIMM Arbitrary Lagrangian Eulerian (ALE) computational techniques allow treatment of gases, liq

    Jan 1, 2000

  • SAIMM
    Profiles Of Noise Exposure Levels In South African Mining ? Synopsis ? Objectives

    By A. L. Edwards

    A two-year study focused on current noise exposure levels in the South African mining industry, aimed at helping the Mine Health and Safety Council of South Africa meet its milestones for eliminating

    Jan 1, 2011

  • SAIMM
    The application of pumpable emulsions in narrow-reef stoping (c3a49f1e-796f-497e-8d58-8a582c0eb90b)

    By S. P. Pearton

    "Pumpable emulsion explosives have been available to surface and underground massive mining operations for decades, and their unique properties offer significant advantages in terms of improved safety

    Jan 1, 2015

  • SAIMM
    Improving The Trough Opening Process At Premier Mine Utilizing Electronic Delay Detonators

    By H. Möhle

    Premier Mine is a large underground diamond mine, situated at Cullinan in the Gauteng Province of South Africa. The mine hoists over 3 millions tons of diamond bearing kimberlite per year, from a mode

    Jan 1, 2000

  • SAIMM
    Strain-softening behaviour of a schistose rock under triaxial loading

    By A. Varadarajan, M. Hashemi, K. G. Sharma

    Quartz mica schist collected from Nathpa-Jhakri Hydropower Project, Himachal Pradesh, North India is tested under triaxial loading using a servo-controlled loading system. Complete stress-strain-volu

    Jan 1, 2003

  • SAIMM
    High Pressure Grinding Rolls - Applications For The Platinum Industry

    High pressure grinding technology has gained further interest in various industries. So far in the mining industry, machines are in operation in diamond mines and iron ore applications. In gold and

    Jan 1, 2004

  • SAIMM
    A Case Study Of Risk Evaluation At Cerrejon Mine

    By Luis-Fernando Contreras, Juliano Maran, Richard LeSueur

    A risk study was carried out at the Cerrejon coal mine in order to assess the impacts of pit slope failure in terms of safety of personnel and destruction of equipment with economic consequences. Res

    Jan 1, 2006

  • SAIMM
    Overview of mine rescue approaches for underground coal fires: A South African perspective

    By M. Onifade, B. Genc, P. O. Akinseye, M. Fourie, K. O. Said

    Coal is mined by both surface and underground methods and its extraction is normally characterized by numerous hazards that can lead to catastrophic accidents, which result in devastating effects such

    May 2, 2022

  • SAIMM
    Shear-bond strength testing of thin spray-on liners - Synopsis

    By H. Yilmaz

    A testing method for assessing the shear-bond strength of thin spray-on liner (TSL) on rock substrate was developed at Wits University Rock Mechanics Laboratories. The gap between a 20 mm thick steel

    Jan 1, 2007

  • SAIMM
    Rapid Installation Of Support In A Partially Raise Bored Shaft Using Sky Jacks. ? Synopsis (80e0c6d7-bb8a-4f50-8633-f573ee75745a)

    By D. Strachan

    Installation of support in known poor ground intersections during reaming operations requires rapid access to stabilize the shaft wall and thus to prevent the loss of the shaft through scaling. This i

    Jan 1, 2009

  • SAIMM
    Design Considerations For The Damang Open Pit Expansion

    By A. Haines, O. Varaud, I. Baidoo

    Abosso Goldfields Limited (AGL) is in the process of developing an expansion of their Damang Open Pit gold mine in Ghana. AGL acquired the Damang mine in January 2002, with SRK participating in the ge

    Jan 1, 2006

  • SAIMM
    Current South African Coal Pillar Research

    By B. J. Madden

    Over 206 million tons of hard coal were mined in South African collieries in 1996. Some 132.5 millions tons came from underground operations and approximately 120 million tons came from bord-and-pilla

    Jan 1, 1998

  • SAIMM
    Investigating continuous time open pit dynamics - Synopsis

    Current mine production planning, scheduling, and allocation of resources are based on mathematical programming models. In practice, the optimized solution cannot be attained without examining all pos

    Jan 1, 2008

  • SAIMM
    The West Driefontein Reclamation Carbon-In-Pulp Plant; Pilot Plant Testwork, Design, Commissioning And Optimization

    By G. D. Buson

    Driefontein Consolidated Limited has a proud history in the South African gold mining industry dating back to March 1945 with the formation of the West Driefontein Gold Mining Company. The reclamation

    Jan 1, 1999

  • SAIMM
    Potential Metallurgical Treatment Of Copper Concentrates With High Arsenic Contents - Synopsis

    By I. Mihajlovic

    This paper investigates a potential method for arsenic removal from copper concentrates using hypochlorite leaching. The problems concerning pyrometallurgical processing of copper concentrates with hi

    Jan 1, 2011

  • SAIMM
    A study of internal overburden dump design and stability analysis for Hazelwood Power Mine, Latrobe Valley, Victoria, Australia

    By D. Nag, J. Fernando

    Hazelwood Power Mine is one of the largest open pit brown coal mines in Australia. The removal of overburden is the first step in coal winning operation. The primary aim of construction of overburden

    Jan 1, 2003

  • SAIMM
    Rock and Ventilation Control

    "Chairman: Dr W. S. RAPSON Rapporteur: Mr J. W. WILSONPapers:Computer applications in rock mechanics by F. H. Deist, E. Georgiadis and J. P. E. Moris Rock mechanics in the design of mine layouts by K.

    Jan 1, 2014

  • SAIMM
    A new automated, safe, environmentally sustainable, and high extraction softrock underground mining method

    By J. Zhang, A. J. S. Spearing, L. Ma

    Ore deposits are becoming more complex to mine as a result of the exhaustion of surface and other easily mined deposits. There is also increasing socio-political pressure to design more environmentall

    Feb 2, 2021