Case History: Use Of Rock-Socketed Augered Cast-In-Place PilesBy Tracy Brettmann
The use of rock-socketed Augered Cast-In-Place (ACIP) piles is new to the Austin and central Texas region. This case history describes the design methodology, load test results, quality control proced
Jan 1, 1998
-
Geophysical Subsurface Characterization to Estimate Top-Of-Rock Elevation for Deep Foundations in Challenging Geologic Settings: Numerical Investigation of Full Waveform TomographyBy Siavash Mahvelati, Alireza Kordjazi, Joseph Thomas Coe
Deep foundations are often constructed as end bearing members with a significant amount of their capacity derived from bedrock. Sites with highly variable bedrock conditions therefore present a uniq
Sep 8, 2021
-
Geophysical Subsurface Characterization To Estimate Top-Ofrock Elevation For Deep Foundations In Challenging Geologic Settings: Numerical Investigation Of Full Waveform TomographyBy Siavash Mahvelati, Alireza Kordjazi, Joseph Thomas Coe
Deep foundations are often constructed as end bearing members with a significant amount of their capacity derived from bedrock. Sites with highly variable bedrock conditions therefore present a unique
Oct 1, 2021
-
Case Study: Innovative Soil Nail Stabilization Of A 100 Foot High Urban SlopeBy Mike Fabius
The Lakehead Region Conservation Authority is responsible for slopes along the Kaministiquia River, one of the largest tributaries to Lake Superior in Canada. After arresting toe erosion for a mile o
Jan 1, 2006
-
Deep Open Excavation In Chicago Downtown Area For Red Line And Blue Line Subway Connection At Block 37By Gordon Chen
The Block 37 Chicago Transit Authority (CTA) Tunnel Construction Project was originally designed by STV to connect Blue Line subway in North Dearborn Street and Red Line subway in State Street in the
Jan 1, 2009
-
Design And Construction Of An Earth Retaining Structure - Using A Pile In Self-Hardening Grout (PSHG) WallBy Allan Sylvester
Construction of the Shot Tower Metro Station in Baltimore, Maryland was performed in two phases. In the first phase, a contractor was retained to excavate the station in order to construct twin tunnel
Jan 1, 1997
-
Augered Cast-in-Place Pile Manual, Second Edition, 2003The development of Augered Cast-In-Place (ACIP) piles started in the late 1940's when several projects were performed by Intrusion-Prepakt, Inc. utilizing various techniques to place the piling.
Jan 1, 2003
-
Use Of Controlled Modulus Columns In Retail & Industrial Development ProjectsBy Frederic Masse
With widespread acceptance in the market place, many engineers are choosing ground improvement techniques to provide suitable foundation subgrade at sites that would have traditionally required deep f
Jan 1, 2011
-
Discussion On Base Grouted PilesBy V. M. Troughton
Further pile load testing has been carried out at Canary Wharf to compare the performance of base grouted and ungrouted bored piles founded in the Thanet Sand. The testing regime included three prelim
Jan 1, 1991
-
List Of ExhibitorsA technical exhibition was held in conjunction with the 4th DFI International Conference on Piling and Deep Foundations, Stresa. The exhibition was located in the ground floor of the Conference Hall.
Jan 1, 1994
-
Reinforcement of Existing Deep Foundations with MicropilesBy Mauricio Terceros, Martin Achmus, Freddy Lopez
The massive use of deep foundations had a remarkable influence in the building industry in the 20th century. Piles and micropiles made possible to erect thousands of civil structures around the world,
Jan 1, 2018
-
Reflections On Our Industry - Foundation Vs GeotechnicalBy Arturo Ressi di Cervia
From the times when men in lacustrine environments drove wooden piles into the mud to elevate their dwellings, until the beginning of the twentieth century builders reacted to the conditions found in
Jan 1, 2000
-
A Critical Appraisal Of Is-Code Provisions For Pile Design ? SynopsisBy N. Som
The pile capacity in cohesive and granular soils depends on a number of parameters. The values of these parameters as recommended by Indian Standard Code of Practice vary over wide ranges. A designer
Jan 1, 1996
-
Application Of Bu-Type Steel Sheet Pile On Construction Of Ports ? PrefaceBy Zhou Lu-Jian
The Port of Shekou is situated at Shenzhen Bay on the east bank of Lingding Ocean. Its coastline is about 6 km long and the water depth near the shore is Favourable. Across the bay is the ' New T
Jan 1, 1991
-
Field Trials for Deep Mixing in Land Remediation: Execution and Early Age Monitoring, QC and Lessons LearntBy Ziyad Abunada, David O’Connor, Abir Al-Tabbaa
"Abstract Contaminated land remediation using soil mix technology (SMT) is a relatively recent development which has been shown to be a cost effective and versatile system with numerous environmental
Jan 1, 2014
-
Settlement & Vibration Monitoring For Transmission Line Foundation Installation: A Case HistoryBy R. Heath Forbes
The route of a new, 4-mile long, electrical transmission line passed through residential neighborhoods and commercial areas of a small town in the South Carolina Coastal Plain. The new line consisted
Jan 1, 2011
-
Carbon Footprint Of Common Quay StructuresBy Dr Karsten Galipp, Kai-Julian I. Hendler, Prof. Manuel G. Pinheiro, Dr Peter J. Bourne-Webb
With a share of approximately 11% of global greenhouse gas emissions, the construction industry contributes significantly towards climate change. This is why construction projects should not only be a
May 1, 2022
-
Caisson Design And Construction Challenges On The New Tiger Stadium Project - SummaryBy Fritz J. Klingler
From site demolition, to design, to construction, Detroit's new Tiger Stadium project is required to be completed within a short 2 ½ years from award of the design-build contract. Such extreme sc
Jan 1, 1999
-
Installation Of Augered Cast-In-Place Piles (3e8ab035-87ca-4b14-9759-c57d4f787aa0)By Tracy Brettmann
Equipment ? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane
Jan 1, 2004
-
Site Solutions For The Pisa Tower Remediation - 1 - IntroductionBy Paolo Heiniger
The aim of this paper is to present the operative solutions devised and then adopted to implement the underexcavation (soil extraction) of the Tower of Pisa, by means of soil extraction. The inter
Jan 1, 2000