Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Reducing Construction Interference when Implementing Geotechnical Instrumentation and Monitoring in Urban Excavation Projects

    By Martin B. Hudson, Daniel Brescia, Zhangwei Ning

    Due to the complexity and sensitivity of surrounding environments, instrumentation and monitoring (I&M) is critical for many urban deep excavations. The objects to be monitored include shoring bulkhea

    Jan 1, 2018

  • DFI
    Micropile-Supported Wall To Resist Lateral Deflection Of Existing Railroad Bridge Abutment

    By Samer R. Rabab?ah

    As part of the PHX Sky TrainTM project at Phoenix Sky Harbor International Airport in Phoenix, Arizona, the existing traffic lanes at the 44th Street underpass below the Union Pacific Railroad (UPRR)

    Jan 1, 2011

  • DFI
    Classical And Finite Difference Method To Estimate Pile Capacity Compared With Pile Load Testing Results

    By Yogesh Prashar

    Three conventional uplift tests and 12 Rapid Pile Load Tests (RLT) were performed on total of fifteen 16-inch square pre-cast concrete driven piles at a test site in Emeryville California in December

    Jan 1, 2002

  • DFI
    Tunnel Headwall Softeyes: Fiberglass Design Applications and Constructability Challenges

    By Shawna Munn, Jakub Hudler

    This paper outlines the use of tunneling headwall softeyes for transit construction projects in the Greater Toronto Area (GTA) over the past decade. Due to spatial constraints, tunnel boring machines

    Jan 1, 2018

  • DFI
    Piled Raft On Layered Soils

    By Luca de Sanctis

    The analysis of piled raft foundations in layered soils may be performed by 3D finite elements or by approximate procedures. Among the latter, the code NAPRA (Russo, 1998) is based on the method of th

    Jan 1, 2002

  • DFI
    St Clair River Rail Tunnel, Sarnia Evolution Of The Design And Construction Methods For The TBM Cutterhead Retrieval

    By Peter McDonald

    In 1994 the world's largest underwater tunnel was constructed to link Canada and the U.S.A. This new tunnel was large enough to accommodate double-decker railway cars. The construction of an unpl

    Jan 1, 1997

  • DFI
    The Driven Grout Pile - An Economical Alternative In Pile Foundations ? Scope

    By Brian Langdon

    The DRIVEN GROUT PILE was developed in 1989 by DeWitt Construction, Incorporated. This piling essentially consists of a cost-in-place concrete piling that reacts on a steel boot that is driven to bear

    Jan 1, 1990

  • DFI
    Minipiles In Soft Marine Deposits Rescue Sinking Warehouse

    By Bruno Gemmi

    A new warehouse built with prefabricated components over an area underlined by soft marine soil deposits started showing differential settlements well before its completion. Its 103 spread footings c

    Jan 1, 2011

  • DFI
    Gordie Howe International Bridge Foundations - Drilled Shaft Construction in Challenging Detroit Limestone

    By Jim Glider, Noah Miner

    The Gordie Howe International Bridge is a project to build a cable-stayed bridge and border crossing across the Detroit River. With a span length of 2,800-ft (853.4 meters), the Gordie Howe Internatio

    Sep 8, 2021

  • DFI
    An Experimental Investigation On The Benefits Of A Hybrid Pile/footing System On Sand

    By Nick Hytiris, Mohammed Al Maadheedi, Slobodan B. Mickovski

    This paper explores the capacity effects of a square steel plate welded at the ground surface on a driven open-ended steel pile (i.e. the plate would touch the ground surface after the pile achieves t

  • DFI
    AN EXPERIMENTAL INVESTIGATION ON THE BENEFITS OF A HYBRID PILE/FOOTING SYSTEM ON SAND

    By Mohammed Al Maadheedi

    This paper explores the capacity effects of a square steel plate welded at the ground surface on a driven open-ended steel pile (i.e. the plate would touch the ground surface after the pile achieves t

  • DFI
    Large Diameter CIDH Construction In Cohesionless Soils By The Use Of Rotator/Ocsillator Techniques: A Case Study - 116th Avenue Bridge Over The Gila River Phoenix, Az.

    By M. Cornelius

    Drilled shaft construction through caving soils has historically been an uncertain, risky and costly operation. Uncertain, because the zone of caving may or may not be known, risky because the loss of

    Jan 1, 1999

  • DFI
    Mission Valley Viaduct Piledriving - 1998 DFI Conference Seattle, Washington October 8, 1998

    By David A. Jack

    The Mission Valley Viaduct is located in San Diego, California. This structure is the intersection of Interstate 8 and 805. The project consists of the main viaduct, 8 connecting ramps, and one highwa

    Jan 1, 1998

  • DFI
    A Brand New Barrier Wall Installed at Wolf Creek Dam

    By Maurizio Siepi, Fabio Santillan, Lyndon Bedford, Carlo Crippa

    "Abstract: Wolf Creek dam, on the Cumberland River in Kentucky, US, operated and maintained by the Nashville District of the USACE, is the Corps' largest reservoir east of the Mississippi river. The 1

    Jan 1, 2014

  • DFI
    Design And Preliminary Investigations For Deep Foundations Of The Charleroi Locks River Wall Project, Monessen, Pennsylvania

    By Brian H. Greene

    The U.S. Army Corps of Engineers, Pittsburgh District, is in the final phases of modernizing the locks and dams on the Monongahela River. One facet of this modernization is to replace the existing Lo

    Jan 1, 2006

  • DFI
    Insight to Foundation Construction of Extradosed - 3rd Narmada Bridge over River Narmada, Bharuch, Gujarat

    By Ekhlaq A. Khan

    "The new third Bridge over Narmada River at Bharuch which was recently completed is characterized by some aesthetically appealing elevations of the pylon and large size of the deck. This paper gives a

    Jan 1, 2017

  • DFI
    Challenge From Foundation Engineering To China ? Synopsis

    By R. L. Xu

    In this paper, the author would like to point out with figures that the building industry is one of the key industrial sectors of the national economy in China. And in the coming 15 years, the output

    Jan 1, 2010

  • DFI
    Numerical Analyses Of Pile Load Testing And Pile Base Grouting

    By Wen-Chieh Cheng

    Two bored piles with base grouting are loaded axially and the results are used to compare with numerical analyses. One compressive pile with a diameter of 2 meters is drilled through clay deposit and

    Jan 1, 2006

  • DFI
    Effectiveness of Head-Enlarged CDM Columns in Evaluating Settlement of Improved Grounds

    By Y. M. Ha, T. D. Nguyen, D. T. Nguyen, H. K. Choi

    Conventionally, cement deep mixing (CDM) columns are designed to have constant diameters over the improved depth as this facilitates the construction procedures. However, this design pattern may be in

    Jan 1, 2019

  • DFI
    Innovative Deep Foundation Support Using Ductile Iron Piles

    By Thomas Billups, Brendan FitzPatrick, Doug LeDo, David Carchedi

    "Working in urban environments presents unique logistical challenges beyond those typically associated with traditional geotechnical analysis and design. These challenges often include working on site

    Jan 1, 2016