Foundation Rehabilitation of the Henry Hudson BridgeBy Dharmil S. Patel, Zoyav S. Benyaminov, Cassandra A. Wetzel
Rehabilitation of the Henry Hudson Bridge is nearing completion, connecting Spuyten Duyvil in the Bronx to Inwood Hill in Manhattan, New York. Constructed in 1936, the Henry Hudson Bridge spans 840 fe
Sep 8, 2021
-
Formation Of Interlocking Jet Grout Columns At Large DepthBy Chu E. Ho
Jet grout column formation at large depths are prone to several uncertainties, such as inaccuracy in setting out boreholes, drilling deviation, soil variability and reduced jetting energy at the nozzl
Jan 1, 2008
-
Case Study: The Use Of Post Tensioned Piles For Wind Turbine FoundationsBy Amr Sallam, Ahmad Mohamed, Mohamed Alrowaimi
Renewable energy, in the form of wind and solar, has emerged as main source of energy in the modern society. The wind industry has substantially grown over the last two decades to become a key player
-
Deep, Large Diameter Bored Piles In Hong Kong, Two Selected Cases - SynopsisBy Yvone Franco Crosato
The dense population of Hong Kong requires the construction of tall buildings in reclaimed areas or perched on the slopes of the many hills. The large loads to be supported are carried by deep foundat
Jan 1, 2000
-
Construction Of Deep Open Foundations For Airoli Road Bridge On Thane Creek In New Bombay - SynopsisBy A. R. Jambekar
City of Bombay has been developed out of former 7 islands. Landmass of 434 sq.km. of Bombay, started looking inadequate for further growth and expansion of Bombay City. In order to develope twin city
Jan 1, 1996
-
Levee Rehabilitation, Lower Wood River Phase II– East Alton IL. Deep Cutoff WallBy Gene Bryant, Wesley Schmutzler, Matteo Bertoni
The levees where the Mississippi River and the Lower Wood River meet near East Alton Illinois have been a problem area for years due to underseepage. The first phase of the deep cutoff wall was a 2,00
Jan 1, 2019
-
Construction Of Large Underground Openings And Use Of Grouts ? SynopsisBy E. Mongilardi
The construction of large underground openings through cohesionless or weak cohesive soils and under the water table in particular, often requires a ground improvement to be done from the surface or a
Jan 1, 2010
-
2 Recent Technological Developments In Deep Foundations Without Soil Excavation - Recent Technological Developments In Deep Foundations Without Soil Excavation - Brief Review Of Papers To Session 2By Bengt H. Fellenius
Session 2, Deep Foundation without Soil Excavation, has attracted no fewer than 22 papers dealing with subjects from soil improvement by grouting, injection, and deep mixing techniques through vibrofl
Jan 1, 1994
-
Geotextile Encased Columns (GEC) as Pile-Similar Foundation Elements: Basics, Specifics, Case StudiesBy Marc Raithel, Sven Schröer, Lilma Schimmel, Dimiter Alexiew
"The Geotextile Encased Columns (GEC) deep foundation system for embankments and dikes on soft soils was introduced some 20 years ago and is now considered State-of-the-art in Germany, Europe and, ste
Jan 1, 2017
-
Business Benefits Of An Integrated CFA Rig Instrumentation SystemBy Jason N. Scott
CFA piling is a ?blind? construction process that relies heavily on the rig instrumentation to produce sound piles. If the data measured and recorded during construction can be made available to engi
Jan 1, 2006
-
A Case Study Of Passive Piles Failure In Open ExcavationBy S. T. Kok
This paper presents a case study in West Malaysia for passive piles failure in very soft marine clay in open excavation. In this particular case, the thickness of the very soft marine clay ranges from
Jan 1, 2009
-
Diaphragm Walls Acting As Anchor Curtains Of Laterally Loaded Structures - SynopsisBy J. Matos e Silva
The paper refers two examples of structures located in seismic areas (Cases 1 and 2). The first one (Case 1) is the Torroal Bridge, located about 100 Km South of Lisbon, in the road Troia-Grandola
Jan 1, 1996
-
Peribonka Dam In Canada A Showcase Of Advanced Ground Engineering TechniquesBy Mazin Adnan
The 80m high dam at the Peribonka river in the Canadian province of Quebec was designed for the generation of 385 MW of hydro electrical power (Fig.1). The complex ground conditions required the e
Jan 1, 2008
-
Soil-Cement Pile Foundations For A Large Storage Tank And Retaining Wall - Case History - SummaryBy Roy A. Bell
A 200-foot diameter, 72-foot high petroleum storage tank was built in a hillside ravine where a portion of the site contained soft clay fill. Soil-cement piles, 40 inches in diameter and up to 38 feet
Jan 1, 1997
-
-
Mt. Baker Ridge Access Pits And Seattle Bus Tunnel Jet Grouted PilesBy John F. MacDonald
From 19BS thru the present, Guy F. Atkinson Construction Company has been involved in several transportation construction projects in the Seattle area. Two of these contracts, the Mt. Baker Ridge Tunn
Jan 1, 1990
-
Design Of Augered Cast In Place (ACIP) Piles - IntroductionBy Michael McVay
The use of augered cast-in-place piles has seen tremendous growth under commerical structures in the past twenty years. Problems with vibration, soil densification and/or heave associated with driven
Jan 1, 1997
-
Field Test of Braced Excavation Supported with Rows of Dry Deep Mixing ColumnsBy Stefan Larsson, Sadek Baker, Razvan Ignat
"This paper describes the execution of two full-scale field tests where a braced steel sheet pile wall interacting with rows of overlapping dry deep mixing columns was first excavated and then loaded
Jan 1, 2015
-
Cement-Bentonite Slurry Cut Off Wall Maxent Lagoon Levee Rehabilitation Orleans Parish, Louisiana - SummaryBy Edmund J. Cardoza
The paper describes the design, construction and quality control aspects of the installation of a cement-bentonite (CB) cut off wall to impede seepage through a flood control dike. Special emphasis is
Jan 1, 1992
-
Operator Independent Installation Of Lime Cement (L/C) ColumnsBy Tobias Hansson
The quality of Lime Cement (L/C) columns is to a great extent dependent on the installation procedure. At a site in the south of Sweden, the client reported problems with the installed columns. To eva
Jan 1, 2000