Errata - Performance Of A Large Diameter Drilled PierBy A. J. Partos
Table 4, Page 311 Table 4 Experimental Parameters from Straight Line Interpretation of Mohr Failure Envelope [ ]
Jan 1, 1991
-
Foundation Behaviour Of A Large HS-Train Viaduct After 4 Years' OperationBy Michel Bustamante
The Arbre viaduct, 200 metres long, is the most important structure on the Belgian portion of the High Speed Train line between Paris and Brussels. The particular geotechnical conditions of the soil w
Jan 1, 2002
-
Session 19 "Compensation Grouting"By Douglas Heenan
The fracture orientations were inferred based on theory and previous experience. The fracture pattern was not monitored during the project. Grout volume was recorded at each sleeve port and real time
Feb 10, 2003
-
Construction of Cooling Water Intake Shafts for the Oak Creek Expansion Project, Oak Creek, WisconsinBy Edward Jacobsen
The Oak Creek Power Plant in Oak Creek, Wisconsin is currently undertaking an expansion project. In order to supply cooling water to this facility, a 27' (8.2m) diameter tunnel will be bored, in
May 11, 2007
-
No. 1 Queens Road - Melbourne, AustraliaBy Tom George
"INTRODUCTIONNo. 1 Queens Rd was an existing 10-storey office building founded on large pad footings. This project involved the construction of a 6-level, 15m (50-ft.) deep basement excavated immediat
Jan 1, 2005
-
Construction Of A Pre-Founded Anchored Wall, Monitoring Of Execution Based On The Eurocode 7 Observation Method, And Taking Account Of The Transmission Of Seismic Forces In The Retaining Structures Towards The Buildings StructureBy Denis Huber
The technical assessment of the final works on the "Stéphany Palace" project at Menton in France's Alpes-Maritimes region shows the importance of daily project monitoring based on the observation
Jan 1, 2002
-
Resonance Pile Driving with Zero Ground VibrationBy Mark Johnson, Mathew Janes
"The Resonator RD 260 Resonant Pile Driver delivers ground disturbance free, high production pile driving. The Resonator has recently been used on numerous production pile driving sites in the Netherl
Jan 1, 1900
-
R C Harris Water Filtration Plant Expansion - Excavation Support Design, Installation and PerformanceBy Michael Cianchetti, Nadir Ansari, Matthew Janes
"PROJECT DESCRIPTIONThe R C Harris Filtration Plant underwent an expansion to install an underground sludge treatment capability consisting of a series of underground tanks within stepped excavations
Jan 1, 2007
-
Soil Mixing Treatment of Marginal Soil for Railway Construction and MaintenanceBy Charles M. Wilk
"Mass stabilization involves mixing binding agents into marginal or contaminated soil to improve the subject material’s physical and/or chemical properties. This paper concentrates on the principles o
Jan 1, 2017
-
Meadowlands Megaproject: 9,000 Piles and CountingBy Ronald D. Boyer
"Early in the design stage of Meadowlands Xanadu, the client’s project director informed me that “after construction, nobody is going to come to Xanadu to see the foundations.” My response was, “Well,
Jan 1, 2009
-
Soil Mixing Treatment of Marginal Soil for Railway Construction and Maintenance (8f2b4a54-c8f3-43f2-a476-24a3cd46424e)By Charles M. Wilk
"Mass stabilization involves mixing binding agents into marginal or contaminated soil to improve the subject material’s physical and/or chemical properties. This paper concentrates on the principles o
Jan 1, 2015
-
Slurry Trench Design and Construction in Difficult Conditions (5812dfc0-6c6e-4d3d-988d-069d8f606655)By Peter Deming
"PART 1 OF 2INTRODUCTIONSlurry trenches are the least cost hydraulic barrier available, if the excavated spoils can be recycled into backfill. As such, slurry trenches are constructed where possible,
Jan 1, 2006
-
Effect of Sand Density on Load Sharing Mechanism of Piled Raft FoundationBy Rouzbeh Vakili, Adel M. Hanna
"The application of piled raft foundations has significantly increased during the last few years. In this system, the raft and the pile group collectively transfer the applied building load to the und
Jan 1, 2017
-
High Capacity Grouted Helical PilesBy Mohamed A. Mansour, Ahmed M. Soliman, M. H. El-Naggar
"Grouted helical piles allow significant increase in pile capacity with low additional cost over that of conventional helical piles. They can be particularly advantageous in sites where installation d
Jan 1, 2016
-
Innovative SSP Design and Construction for a Complex Soil Remediation ProjectBy Matthew C. Janes, Mark C. Spence
"A former coal gasification site next to Rock Bay in Victoria, BC, Canada required a barrier to permit dewatering and excavation of the bay and surrounding property. The adjacent property owners had s
Jan 1, 2016
-
Caveat Emptor Or A Buyer's Guide To Pile Integrity Testing - IntroductionBy Joram M. Amir
During recent years, the integrity testing of piles has made considerable progress. With the availability of portable and powerful computers, practically all integrity testing equipment is now digital
Jan 1, 1999
-
Wick Drain Guide Specification (Method)"1.0 DESCRIPTIONThis work consists of furnishing all necessary labor, equipment, and materials to install prefabricated vertical (wick) drains in the ground in accordance with the Plans and as specifi
Jan 1, 2014
-
Author indexAbouleid,A.F.327 Ajdic, I.451 Albert, L.F. 221,307 Alem, A. 525 Asama, T. 431 Avgherinos, P. J. 373 Baker Jr, C.N. 331 Balossi Restelli, A. 171 Beckwith,G.H.33 Bellini, A. 469 Ber
Jan 1, 1994
-
Corroboration and Remediation Options"After the non-destructive testing is completed, the data must be compiled, evaluated, and interpreted. During this process, the data may indicate that there is an anomaly warranting further investiga
Jan 1, 2004
-
Session 22 "Compaction Grouting and Limited Mobility Grouting"By Allen Cadden
The type of soil we had was a silty fine sand. It had been placed by hydraulic methods in 1904 so it was quite clean I would say less than 10% silt the rest of it was very loose sand. That I'm n
Feb 10, 2003