Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The Bsnmod Program and Preliminary Application to Paleo-Fluid Flow Modeling in the Anticosti Basin

    By Guoxiang Chi

    This paper consists of two parts: the first part describes the principles and functionality of the BsnMod program, and the second part presents preliminary application of this program to paleo-fluid f

    May 1, 2001

  • CIM
    Strength and Mechanism of Portland Cement Prepared from Stone Coal Vanadium Slag

    By P. Zhang, K. Liu, L. Ou

    "The strength and mechanism of Portland cement prepared from stone coal vanadium slag were studied in this paper. Initially, the slag was used as silicon raw materials to prepare clinker. By blending

    Jan 1, 2016

  • CIM
    Correlating Economic and Social Data for a Globalized Mineral Investment

    By Zetti Gavelán

    Globalization and the search for new ore deposits inevitably lead to investment in foreign markets. Investors need to be aware of the effect of their venture on regional, social and economic issues wh

    May 1, 2003

  • CIM
    Effect of Superheat and Section Thickness on Flow Characteristics for Thin Section LFC of Hypereutectic Al-Si Alloys

    By A. Haldar

    This study focuses on the flow characteristics of hypereutectic Al-Si alloys in thin sections. The pattern assembly consisted of spiral horizontal patterns, 6.25 mm (0.25 inch) and 12.50 mm (0.50 inch

    Jan 1, 2007

  • CIM
    Application of Ultra-Wide Band (UWB) Radar in Detecting Unexpected Utility Lines in Open Cut Operations

    By J. Zou

    Open-cut method is most widely used for shallow utility lines installation. In urban areas, unexpected utility lines buried underground potentially turn open-cut construction into a highly risky opera

    Aug 1, 2013

  • CIM
    TSP-Based Model for on-Site Material Handling Operations with Tower Cranes

    By Amir Zavichi

    Today, with the necessity of timely, on-budget and high quality completion of projects, proper use of construction equipment is essential to ensure project success. Construction equipment places a lar

    Aug 1, 2013

  • CIM
    High-Arsenic Bearing Concentrates Processed in the Teniente Converter at Codelco Norte Smelter

    By C. Caballero, K. Itagaki, P. Morales, A. Moyano, J. Font

    Codelco-Chile is considering different processing options for the new projected concentrate from the Alejandro Hales mine. This concentrate is featured by its high arsenic content of up to 6%. Thus, i

    Jan 1, 2007

  • CIM
    The Exshaw Formation, Alberta

    By E. W. Mountjoy

    THE Exshaw formation is a thin but very persistent black shale unit generally well exposed along the easterly scarp faces of the fault blocks comprising tl1e front ranges of the Rocky mountains. It is

    Jan 1, 1956

  • CIM
    Supervisory Control Project Of A Copper Solvent Extraction Pilot Plant

    By L. G. Bergh

    The experience developing a supervisory control and information systems in a SX pilot plant is presented. The plant is located at the Process Control Laboratory, Santa Maria University, in Chile. In t

    Jan 1, 2007

  • CIM
    Along-channel water and thermal management for PEMFCs

    Proper water and thermal management is essential for obtaining high performance of Proton Exchange Membrane Fuel Cells (PEMFCs). A steady, two-dimensional water and thermal management model was develo

    Jan 1, 2005

  • CIM
    Stratigraphic and structural setting of stratabound lead-zinc deposits in southeastern B.C.

    By Trygve Høy

    "Important stratabound lead-zinc deposits in southeastern B. C. occur in rocks that range in age from Proterozoic Helikian to Middle Cambrian. The Sullivan deposit, and similar but smaller deposits in

    Jan 1, 1982

  • CIM
    Micromixing in the gibbsite caustic aluminate precipitation system

    By T. S. Li, D. Ilievski, I. Livk

    Micromixing of the fluid and the particulate phases in a continuous gibbsite precipitator was investigated for three different micromixing states, namely maximum mixedness (MM), complete segregation (

    Jan 1, 2005

  • CIM
    Valuation of exploration properties

    By Hrayr Agnerian

    The fair market value of an exploration property is determined by its potential to host a mineral deposit. This potential is gauged by the results of previous exploration, exploration stage, meaningfu

    Jan 1, 1996

  • CIM
    Red Lake Mine Seismic System - World Mining Congress August 2013 Montreal, Canada

    Outline ?Red Lake Gold Mines ?Red Lake Seismic System ?Applications of Seismic System at Red Lake Mine ?Seismic System Analysis and Customization ?Seismic Software ?Array Design ?Calibra

    Aug 1, 2013

  • CIM
    Factors influencing the selection of mine hoist electrical drives

    By B. C. Legg, G. L. Tiley

    "Many of the ore bodies presently being developed are in remote locations and are, or will be, served by electrical power supply systems of limited capacity.The largest single components of the electr

    Jan 1, 1993

  • CIM
    Open Pit Mining of Golden Band Resources? EP Gold Deposit - Open Pit Mining of Golden Band Resources? EP Deposit Waddy Lake Saskatchewan Open Lake Saskatchewan

    By Charlie Harper

    Open Pit Mining of Golden Band Resources? EP Gold Deposit Golden Band Resources Inc. (GBN:TSX-V) is Saskatchewan's newest Gold Producer. Located in the La Ronge Gold Belt of northern Saskatch

    Nov 1, 2011

  • CIM
    Geochemistry and Genesis of the Murray Brook Precious Metal Gossan Deposit, Bathurst Mining Camp, New Brunswick (dbd5d18e-f1e7-49a5-a65b-afddc38f108d)

    By D. R. Boyle

    "The Murray Brook precious metal (Au, Ag) gossan deposit is one of nine supergene mineral deposits that have developed over polymetallic massive sulfide deposits in the Bathurst Camp of New Brunswick.

    Jan 1, 1995

  • CIM
    Geochemistry and Genesis of the Murray Brook Precious Metal Gossan Deposit, Bathurst Mining Camp, New Brunswick

    By D. R. Boyle

    "Abstract - The Murray Brook precious metal (Au, Ag) gossan deposit is one of nine supergene mineral deposits that have developed over polymetallic massive sulfide deposits in the Bathurst Camp of New

    Jan 1, 1995

  • CIM
    Overview of SEDEX Pb-Zn deposits

    By Suzanne Paradis

    Geographic distribution ? Deposit economics ? Temporal distribution ? Tectonic settings ? Basin architecture ? Morphology ? Ore-fluid chemistries Key exploration criteria

    May 1, 2006

  • CIM
    Advancing Mining Safety in North America: Taking the Next Step with the Earth Taking Moving Equipment Safety Round Table

    By Scott Rosenthal

    ?EMESRT History ?Design Philosophies (DP?s) ?Industry Successes ?Participation Thinking Differently Earth Moving Equipment Safety Round Table ? Use a critical mass to influence Marketing ?

    May 1, 2010