Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
A Frother Concentration MeterBy J. A. Finch, T. Weber
"Bubble size in flotation is strongly influenced by frother concentration in the pulp liquor. There is no accepted method of judging the dosage and thus how effectively frother is being distributed to
Jan 1, 2003
-
Improving Machinery Reliability Through Condition Based MaintenanceBy Alan D. Akerman
This paper describes the significant advantages and improvements in operational availability, reduced breakdowns, and overall cost reductions that can be achieved through the application of a Reliabil
May 1, 2002
-
Four Regions in Low-Temperature Creep of Ultrafine-Grained AluminumBy Eiichi Sato, Koichi Kitazono, Hiroshi Masuda, Kenta Higane
"The present study investigated the low-temperature creep mechanisms in ultrafine-grained (UFG) aluminum manufactured by accumulative roll bonding. UFG aluminum with grain size 0.39 µm showed steady s
Jan 1, 2018
-
Post-Pillar Design for Overhand Cut and Fill Mining in Moderate to High Stress Conditions – A Case StudyBy M. Yao, D. Thibodeau
"Selective mining, such as post pillar cut and fill, is used in large, flat, irregularly shaped ore bodies where ground stability is to be maintained. This selective mining is used to open the stope t
Jan 1, 2015
-
Thermal rock fragmentation — Applications in narrow-vein extraction (abb2f77e-ef62-4687-9449-c7f2069ea82d)By D. Brisebois, J. M. Fecteau, S. Poirier
"This paper focusses on new developments regarding thermal rock fragmentation applications. The technology consists of a strong burner powered by diesel fuel and air. The thermal reaction that is crea
Jan 1, 2003
-
Cyclone Modelling - Case StudiesBy R. N. Murarka
"Hydrocyclone modelling and selection procedure is illustrated. Computerized procedure for hydrocyclone cut size determination for grinding and non-grinding applications is described.A standard proced
Jan 1, 1992
-
Low-Grade Cu-Au Deposits: Predicting the Relationship between Copper and Gold Performance in Flotation and the Potential for Gravity Gold RecoveryBy Jan E. Nesset, Phillip J. Mackey, Joo Y. Kim, Giovanni Di Prisco, André R. Laplante
Understanding the appropriate gold recovery to associate with copper recovery when assessing laboratory testing on porphyry deposits is often complicated by several factors including variable and/or c
Jan 1, 2005
-
Improvements in Gravity and Overall Gold Recovery at NVI Mining Ltd. Myra Falls OperationBy Linda Duncan, Trevor Yeomans, Chris Potorieko, Michael Fullam
"NVI Mining’s Myra Falls Operation is a 4,000 mtpd copper/zinc flotation circuit with by product gold of ~28,000 ounces per year. Gold recovery has historically averaged 40-55%, however, a portion of
Jan 1, 2006
-
Island Copper Mine Milling for Copper and MolybdenumBy Chris Brown
"The Island Copper plant was designed and built by Fluor Utah Ltd, in conjunction with Utah design staff, Originally designed to treat 33,000 tons/day (t/d) of ore, the current average milling capabil
Jan 1, 1975
-
Challenges in moving from Ad-Hoc to Planned Mine Technology InnovationWhy Innovate in Mining? ?Obvious, right? ?Increase productivity and profitability ?Improve safety and ergonomics ?Improve our environmental record and eliminate liabilities ?Implement process c
May 1, 2006
-
Measurement of Ball Size Distribution in a 8 m x 5 m Primary Mill of Sarcheshmeh Copper MineBy M. Pourkani, M. Karga, Samid Banis, Andre Laplante, G. Langari-Zadeh
"The Sarcheshmeh mine processes 40,000 t/d of ore grading 0.9% Cu and 0.035% Mo. Grinding is effected in single stage ball mills using 80 mm forged steel balls, with an average consumption of 850 g/t.
Jan 1, 1999
-
Vibration analysis of mining shovelsBy P. N. Saavedra, E. A. Salamanca
"The maintenance strategies in the mining industry are changing from operative and periodic inspection strategies to a condition-based, predictive maintenance strategy centred in vibration analysis pl
Jan 1, 2002
-
Environmental Planning in Mine Waste Management - The Huckleberry Mines ExperienceBy Henri F. Letient
At the 25th Annual B.C. Mine Reclamation Symposium in September 2001, Huckleberry Mines Limited received the Jake MacDonald Reclamation Award for its exemplary mine waste management plan, conceived to
May 1, 2002
-
The Gold-Rich Louvicourt Volcanogenic Massive Sulfide Deposit, New Brunswick: A Kuroko Analogue in the Bathurst Mining CampBy D. R. Lentz, C. J. Beaumont-Smith, S. H. Mcclenaghan
"Abstract - The Louvicourt Au-Ag-Cu-Zn-Pb sulfide deposit is hosted by a Middle Ordovician calc-alkaline sequence of aphyric rhyolite flows and associated fragmental rocks at the top of the Flat Landi
Jan 1, 2006
-
The Optical Properties of Mixed Au and Pt Nanoparticle ColloidsBy Daven N. Compton
The optical properties of Au nanoparticles have been known for some time, with both Au colloids and Au nanoparticles embedded in glasses having been extensively studied. In this study, Pt nanoparticle
Oct 1, 2003
-
Converting the Key Lake Mill Process for McArthur River Ore"The Key Lake mill was commissioned in 1983 to process the two Key Lake ore deposits. With the depletion of these ore bodies in 1999, the plant was converted to mill the exceptionally rich McArthur Ri
Jan 1, 2001
-
Dust Control at the Cassiar Asbestos Primary Crushing PlantBy F. J. MacPherson, A. C. Caron
"Cassiar Asbestos Corporation Limited is at present B,C.'s only asbestos mining company, and has been actively engaged in the management and operation of the Cassiar Mine since the early 1950's. The C
Jan 1, 1976
-
Optimising Stope Sequences for Long Term Mine PlanningBy André van Wageningen
Long-term mine scheduling is one of the most difficult optimization problems. The problem is said to be NP-complete in that the best possible solution cannot be found any quicker than checking all pos
May 1, 2004
-
Quarrying and sustainable development in large urban centres: A contradiction in terms?By D. C. Kaliampakos, A. G. Benardos
The existence of quarries near or even within the boundaries of urban centres is the cause of many environmental problems, despite their significant contribution to the cities’ development. Hence, the
Jan 1, 2000
-
Corrosion Behaviour of A1-B4c Metal Matrix Composites in H3BO3, K25O4 And NaCl SolutionsBy Ham. Y. M.
The corrosion behaviour of Al-B4C metal matrix composites immersed in 2500 ppm boron-containing H3B03, 0.5 M K2SO4, and 3.5% NaC1 solutions was investigated. Effects of B4C particle volume fraction on
Jan 1, 2011