    Jolu Gold Mine Low Cost Gold Recovery Configuration

    By J. Kazakoff

    "The success of gold recovery at the Jolu gold mill depends on many variables. The most important ones are the people, the ore body, plant design parameters, equipment selection and cost control. This

    Jan 1, 1990

  • CIM
    Evaluation of Level Control System of Cleaner Flotation Columns at Miduk Copper Concentrator

    By M. Massinaei, S. Abasi, M. Oliazadeh

    Reliable measurement and control of the pulp-froth interface (froth depth) in the flotation columns is critical to achieve the desired metallurgical performance. Shallow froths result in a reduction o

    Jan 1, 2019

  • CIM
    Some Crushing and Grinding Considerations in Plant Design

    By H. A. Steane

    "This presentation will cover some crushing and grinding considerations in plant design and operation. There is nothing basically new in the subject matter presented here; however, the viewpoint and i

    Jan 1, 1976

  • CIM
    Link Between Parameters in Rock Mass Classification

    By Doug Milne

    Linking Classification Systems with each other Similar Parameters between systems Different Rock Mass Properties Rock Mass Classification parameters and geology Different sources of data Co

    May 1, 2013

  • CIM
    Fine Grinding of a Sparsely Disseminated Sulphide Ore

    By Augustine O. Orumwense, Micheline Boisclair

    "The use of stirred mill to complement tumbling mills in grinding fine grained minerals is increasingly becoming an attractive processing option. Parameters such as agitation speed, grinding media typ

    Jan 1, 2008

  • CIM
    Compilation of Industry Practices for Control of Hazards Associated with Backfill in Underground Mines - Part I Surface and Plant Operations

    By Euler De Souza

    The authors conducted a study of backfill practices in underground mines across Canada to assess the current state of backfill usage and to overview potential hazards associated with backfill practice

    May 1, 2009

  • CIM
    Enhanced Oxygen Transfer in Gold Cyanidation

    By Ralph Harris, Xia Qi, Frank Komsic

    "Gold cyanidation kinetics which are often limited in commercial operations by the rate of oxygen dissolution from gas bubbles into the slurry, are discussed. Emerging technologies for improving the r

    Jan 1, 1996

  • CIM
    Estimation of liberation

    By T. Yalcin

    "This paper describes the development of a mathematical model for determining the liberation of an ore at various grinding sizes, based on the combined results of microscopic counting, grinding tests,

    Jan 1, 1985

  • CIM
    From Tribulation to Triumph – Flotation Improvements at the New Lac des Iles Concentrator

    By Tom Olsen, Tom Ohrling, Peter Taggart, Chris Martin

    "North American Palladium commissioned the new concentrator at the Lac des Iles mine in the summer of 2001. The 15,000 tonnes per day mill replaced the existing 2,400 tonnes per day facility, as part

    Jan 1, 2003

  • CIM
    Developments and New Applications for Biogenic Sulphide Reagent in Hydrometallurgy and Mineral Processing

    By R. W. Lawrence

    "In the past year, BioteQ Environmental Technologies Inc. have initiated design and construction of new plants to add to an existing list of plants that utilize the BioSulphide® and ChemSulphide™ proc

    Jan 1, 2007

  • CIM
    Safety Lessons Learned Building two Diamond Mines

    By D. L. Putnam

    Snap Lake Mine ?? Complex dyke ore body ?? Underground operation ?? 1.1 million tonnes per annum ?? 1.2 carats per tonne ?? On-site diesel power generation ?? Supply by ice road and air ?? Mile

    May 1, 2008

  • CIM
    Environmental Relevance of the Leachate Potential for Dry Storage of Delayed Coke

    By Joseph L. Fournier

    Suncor Oil Sands employs delayed coking technology in converting bitumen into synthetic crude oil. Currently up to 10,000 m3 of delayed coke (coke) is produced per day as a byproduct of the upgrading

    May 1, 2011

  • CIM
    Sampling and assaying of coarse gold at La Herradura–Minera Penmont S. de R.L. de C.V., Mexico

    By S. Cossio, J. L. Noyola, R. Espinosa

    "Minera Penmont’s La Herradura is a joint venture between Industrias Peñoles, S.A. de C.V. and Newmont Mining Corporation. The mine is located in the northern Mexican state of Sonora. La Herradura con

    Jan 1, 2004

  • CIM
    Concepts for Remote Mineral Projects

    By L. J. Vincze

    The high cost of constructing mineral processing plants in remote locations warrants a close examination of the alternatives available for reducing the amount of on-site construction work. Among the a

    Jan 1, 1980

  • CIM
    The Determination of Selection Elements and Lumped Parameters for Grinding Mills

    By A. L. Mular

    This paper provides a worthwhile contribution to the knowledge needed for calculating and using mathematical models of grinding circuits. The computer search algorithm proposed should remove much of t

    Jan 1, 1970

  • CIM
    Future of Oxygen Steelmaking: Myths and Reality

    By R. J. Fruehan

    Oxygen steelmaking (OSM) is not only the dominant steelmaking process but defines the structure of the industry. There are a number of myths regarding the future of OSM, which are false. These myths i

    Jan 1, 2004

  • CIM
    Mine Reclamation in a Changing Regulatory Environment

    By David H. Searle

    This paper will discuss the common trends existing in various Canadian jurisdictions for the closure and reclamation of mines. Included will be a discussion of the requirement to post security as well

    May 1, 2006

  • CIM
    Dust Control at Granisle Copper

    By L. W. Hamel

    "DUST CONTROL - GRANISLE COPPER LIMITEDINTRODUCTIONGranisle. Copper Limited is located in the north-central region of the Province of British Columbia, approximately 200 road miles north-west of Princ

    Jan 1, 1976

  • CIM
    Dust Collection Methods for Primary and Secondary Crushing (NOVEMBER 21, 1975 )

    By D. Ingram

    "PRIMARY DUST COLLECTOR A. 42,000 CFM James Howden Fan Z-6 Size 3650 Fan Dia 40"" HP 75It was found that the fan was not large enough to remove the air that was displaced by the trucks dumping. So it

    Jan 1, 1976

  • CIM
    Nickel production from low-iron laterite ores: Process descriptions

    By R. A. Bergman

    "Process descriptions are provided for the following ten plants that treat high-magnesia lateritic nickel ores (saprolite) by pyrometallurgical means: PT Aneka Tambang; Cerro Matoso S.A.; Falconbridge

    Jan 1, 2003