Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Better Flowsheeting with Modern Process Mineralogy

    By Norman O. Lotter

    The problem of quantifying the full performance potential of an ore body in a concentrator, and how to configure a flowsheet to achieve that potential, either for a new operation or an existing one, i

    Jan 1, 2011

  • CIM
    Establishing the Best Practice Guidelines in Mineral Processing for NI 43-101

    By Tony Lipiec, Chris Fleming, Larry Urbanoski

    In 2009, the Canadian Mineral Processors (CMP) became aware that Canadian securities regulators were amending the contents of National Instrument 43-101. NI 43-101 is a set of regulations which establ

    Jan 1, 2011

  • CIM
    Milling of Noranda Process Slags

    By P. W. Godbehere, B. W. Brooks

    "This paper deals with the milling of slags from the Noranda Continuous Process, in the Horne Concentrator at Noranda, Quebec. The milling of copper slags, although novel in Canada, has been practiced

    Jan 1, 1977

  • CIM
    Optimization and Increasing Throughput at Jacobina

    By Alexandra Kozak, Rodrigo Costa, Bob Fukuhara

    "The Jacobina project in Bahia, Brazil commenced operations in 2004 with a design capacity of 4,200 tpd. A project development plan to increase plant capacity to 6,500 tpd will be discussed. The proje

    Jan 1, 2008

  • CIM
    Underground Wireless LAN Deployment at Agrium Incorporated

    By Adrian Rosen

    When one thinks of innovation and leadership in wireless communications, one would rarely consider a potash mine to be leading the way. Agrium Incorporated has proven that they are leaders and innovat

    May 1, 2006

  • CIM
    UNIMAX SD100 Depressant - A Cyanide Replacement

    By T. Schmidt, J. Merza

    "This study considers two lead/zinc/silver orebodies which have historically had a problem with pyrite, pyrrhotite and sphalerite contamination in the lead circuit. The problem was previously addresse

    Jan 1, 1992

  • CIM
    Pebble Grinding At Bethlehem Copper Corporation

    By E. A. Lowe, J. W. Smith, C. W. Overton

    "The operations of Bethlehem Copper are situated in the south-central interior of British Columbia at an elevation of 4900 feet above sea level. Main road and rail transportation systems pass through

    Jan 1, 1975

  • CIM
    Surface mining at Smoky River Coal Limited, Grande Cache, Alberta

    By Engineering Staff

    "This paper briefly describes the surface mining operations at Smoky River Coal Limited (formerly McIntyre Mines Limited, Coal Division) near Grande Cache, Alberta. Geology, mining methods, equipment,

    Jan 1, 1985

  • CIM
    Computer Control of Brunswick Mining's No.12 CuPb Flotation Circuit

    By A. Trusiak

    "Increasing energy costs in mineral processing is making it necessary for tighter controls over various parts of the concentrating process. Continuous monitoring and control of critical process stream

    Jan 1, 1981

  • CIM
    Improving Mine/Mill Water Network Design by Reducing Water and Energy Requirements

    By M. Veiga

    "Mining is an energy and water intensive activity. Increasing energy efficiency and reducing water consumption are two of the key requirements in moving toward a more sustainable mining industry. Wate

    Jan 1, 2010

  • CIM
    Meeting Recruiting Challenges - Victor Project

    Project Schedule ?Construction 2005 ?2008 (3 years) ?Operations mid 2008 ?2020 (12 years) ?Closure 2020 ?2023 (3 years) ?Post-closure monitoring Victor Economic Facts ?$982 million investment;

    May 1, 2006

  • CIM
    A Plant-Wide Control System for Flotation Level Control

    By D. G. Hulbert, J. H. Schubert, R. G. D. Henning

    "Froth depth, along with reagent addition and aeration rate, is one of the crucial factors that can be used to control a flotation circuit. Sub-optimal setpoints and disruptions in levels have a sever

    Jan 1, 1995

  • CIM
    Red Dog Lead Regrind Circuit Optimization

    By Brigitte Lacouture, Yeen Shien Hwang, David Lin

    "A baseline survey of the partially open lead regrind circuit at Red Dog Mine indicated poor regrind efficiencies for the three parallel 450 HP tower mills. Driven by the high energy cost and the pote

    Jan 1, 2005

  • CIM
    Backfill Practice at Copper Cliff North Mine (CCNM)

    By Ike Isagon

    Backfilling has become an integral process in underground mining operations, with varying cost-effective forms of application. This study is a part of an overall investigation into the backfill practi

    May 1, 2011

  • CIM
    St. Andrew Goldfields

    By P. Massi

    "Wholly owned by the Coniagas Mining Company, the oldest continuously listed mining company on the Toronto Stock Exchange, St. Andrew Goldfields is located on Hwy. 101 approximately 30 miles east of d

    Jan 1, 1992

  • CIM
    A Historical Survey of the Methods Used to Reduce the Size of Ore at the Holliger Mine

    By I. M. Gordon, J. Blackshaw

    "Run-of-mine ore is reduced to 4 per cent on 4 mesh (3/ 16 inch), using four stages of dry crushing. The mill feed is then reduced to 2 per cent on 48 mesh and 60 per cent through 200 mesh, using one

    Jan 1, 1965

  • CIM
    Improvement in Quality of Pyrite Concentrate by Low Cost Flotation-Gravity Separation Flowsheet at Fankou Mine

    By Zhao-shu Sun, Mao-lin Li, Rui Cui

    "Fankou Mine produced pyrite concentrate (PC) from the tailings by rougher and scavenger flotation before 2010, with the averaged S grade of 40.54% at recovery of 79.34%. The economic value of PC incr

    Jan 1, 2016

  • CIM
    Chameleons in northern Canada

    By Robert B. Parsons

    "For the fourth time in five years, residents of northern Canada have seen a change in the tax treatment of housing and travel costs. The latest changes announced in December 1990 by the Minister of F

    Jan 1, 1991

  • CIM
    Metallurgical Testing of Gold Ores

    By T. Salman

    Most authorities agree that the dissolution of gold from an ore takes place according to the Elsner equation first stated in 1846. The main requirements for the dissolution reaction to proceed are:(1)

    Jan 1, 1975

  • CIM
    Ore Handling for the McArthur River and Cigar Lake Projects

    By Chuck Edwards

    "The development of two large, high-grade uranium projects has been proposed for northern Saskatchewan. The projects are now under review by a joint federal/provincial panel. The McArthur River projec

    Jan 1, 1997