Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Stratigraphy and Structure of the Corbin Coalfield, British Columbia

    By B. R. MacKay

    Introduction The Corbin coalfield is one of the smallest, and at the same time one of the principal, producing bituminous-coal areas in southeastern British Columbia, and is unique on account of the

    Jan 1, 1931

  • CIM
    Thompson 1-D Deposit Geology and Structure

    By Rob Stewart

    Acknowledgements ? Josef Macek(Manitoba Geological Services) ? Sally Goodman (SRK) ? Inco Geologists ? Rogerio Montiero ? Thompson Mine Geologists Introduction ? Regional Geology ? Thompson G

    May 1, 2006

  • CIM
    Development of manufacturing process of wrought magnesium alloys by semi-solid roll strip casting

    By H. Watari

    In 1998, a voluntary agreement was reached between the European Commission and the European Car Manufacturers Association (ACEA) to reduce average carbon dioxide emissions of new cars to 25% below 199

    Jan 1, 2005

  • CIM
    Concentrator upgrade program at the Iron Ore Company of Canada, Carol Lake Concentrator: concentrator upgrade testing program; concentrator flowsheet development

    By Martin Nevens

    "In 1998, the Iron Ore Company of Canada initiated an aggressive program to improve the performance of its Carol Lake Concentrator located in Labrador City, Newfoundland. This program was termed the C

    Jan 1, 2002

  • CIM
    Modeling the Post-Peak Strength Degradation on Tunnel Stability

    By F. Y. Hsiao, H. C. Kao

    Underground excavation in hard rock is normally stable at shallow depth except for wedge failure. However, the excavation depth is rapidly increasing recently. In high overburden stress condition, the

    Jan 1, 2015

  • CIM
    Improving the Material Flow in the Fox Mine Concentrate Bins

    By J. Chlopas, D. J. Barratt, M. V. Sharp

    "This paper describes the modifications made to the Fox Mine copper concentrate bin in order to obtain a continuous flow condition. The design of these modifications is based on test results obtained

    Jan 1, 1978

  • CIM
    Communications in Plant Design

    By J. C. Loretto

    "OPENING REMARKS Yesterday and today we have heard some very interesting papers on operating matters and some of you are probably wondering what we are now doing talking about Communications in Plant

    Jan 1, 1973

  • CIM
    Hydrogen Reduction of Copper and Nickel in the Processing of Copper Bleed Solution of Indian Sea Nodules

    By B. D. Pandey, D. Bagchi, Premchand

    During the separation and recovery of metals from the ammoniacal leach liquor of Indian Ocean nodules by solvent extraction-electrowinning (SX-EW) in close-loop operation, the copper electrolyte conta

    Jan 1, 2004

  • CIM
    Particle Size Effect on Cracking Behavior in Bonded-Particle Model

    By X. -P. Zhang, L. N. Y. Wong

    Shale gas exploitation initiated in North America has rapidly extended worldwide. Hydraulic fracturing is an emerging field technique for stimulating the gas reservoir. The study of cracking processes

    Jan 1, 2015

  • CIM
    Introduction to the Stirred Milling of Nickel Laterites for Upgrading Nickel

    By L. Tong, D. Robinson

    "The stirred milling of nickel laterites offers possibilities for improving liberation and selective size reduction of soft nickel-bearing minerals in laterites. Batch grinding tests were performed in

    Jan 1, 2015

  • CIM
    Investigation of the Correlation Between Homogenisation and Tensile Properties of Almgsi-Alloys

    By G. Anger, J. Enser, H. Antrekowitsch, S. Koch

    Homogeneous chemical composition and microstructure are always necessary, but not always attained in practice. As-cast aluminium alloys tend to have a segregation microstructure. Features of the cast

    Jan 1, 2006

  • CIM
    Milling Practice at Perron Gold Mines

    By P. B. Demarsh

    "Location: - Mine village of Perron, 11 miles east of Val d’Or in northwestern Quebec.Life; - Started production 1932, ceased 1951.Ore: - Flat lying quartz tourmaline veins within granodiorite. Gold v

    Jan 1, 1966

  • CIM
    Development of the Salobo Project

    By Marcio Luis S. Godoy

    The Salobo Project will be the first Vale operation to use an HPGR mill to process copper-gold ore. The mine is located in Para state, southeast of the Amazon region in Brazil. The circuit was designe

    May 1, 2010

  • CIM
    Benefits of the Presence of Iron in Uranium Processing

    By E. Özberk

    Uranium minerals are often associated with iron minerals, and during the hydrometallurgical processing of the uranium ores, iron plays several significant roles. The presence of Fe(III) in solution pr

    Jan 1, 2006

  • CIM
    Numerical Modelling of a Brazilian Disc Test of Layered Rocks using the Combined Finite-Discrete Element Method

    By O. K. Mahabadi

    The scope of this study is to simulate the behaviour of a layered rock sample under standard laboratory Brazilian Disc test using an innovative combined finite-discrete element method (FEM/DEM) resear

    May 1, 2009

  • CIM
    Interfacial Chemistry, Particle Interactions and Dewatering Behaviour of Titanium Dioxide Suspensions

    In the present work, the effect of pH, non-ionic polyacrylamide flocculant and anionic polyphosphate on rheology and settling behaviour of colloidal TiO2 suspensions (15 ? 50 wt% solid) is investigate

    Jan 1, 2006

  • CIM
    New technology for hoist conveyance monitoring and analysis (ce4cfab2-0d27-4d96-82b0-9facfbf66b01)

    By M. J. Beus

    Many mines in Canada, the United States and South Africa are reaching the hoisting limit. Very little payload will be possible without compromising safety due to the excessive weight. It has been sugg

    Jan 1, 2002

  • CIM
    Dynamic Testing of Threadbar used for Rock Reinforcement

    A comprehensive axial test program has been undertaken at the WASM Dynamic Test Facility on the performance of 20mm threadbar. The threadbar tests had a double embedment configuration, with variation

    May 1, 2009

  • CIM
    Mine Evaluation and Production Scheduling (MEPS)

    By H. C. W. Bosman

    "Over the past five years, contributions from geologists and mining engineers were instrumental in the successful development of MEPS. It is a system of FORTRAN programs specifically designed to be us

    Jan 1, 1973

  • CIM
    Effect of Defocusing Distance and Weld Speed on Laser Welding of TI-5AL-5V-5MO-3CR

    By X. Cao, A. Birur, R. R. Chromik, J. Cuddy, P. Wanjara, J. Gholipour Baradari, T. Shariff

    In this study, 3.1 mm thick Ti-5553 (Ti-5Al-5V-5Mo-3Cr) butt joints were autogenously welded using a 4 kW continuous wave Nd:YAG laser. The effect of welding speed and defocusing distance on the weld

    Jan 1, 2010