Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Difficult Gold Gravity Recovery Separations

    By J. Ling, L. Racine, P. Cousin, A. R. Laplante

    "The problem of gold recovery by gravity from high density gangues is first discussed from a fundamental perspective. Three potential difficulties are presented: poor liberation and fine gold particle

    Jan 1, 1997

  • CIM
    Surface mining collaborative research initiatives: A progress report

    By Ian R. Muirhead

    Over the past year or so, a number of mining companies have been meeting to examine the role of research in surface mining and, in particular, how to establish a collaborative research effort for the

    Jan 1, 1996

  • CIM
    Geology of the Waite-Ackerman-Montgomery Property Duprat and Dufresnoy Townships, Quebec

    By J. E. Gill

    Introduction During the past summer, detailed geological mapping was extended to cover the entire group of 31 claims owned by Waite-Ackerman-Montgomery Mines, Ltd., and considerable new information w

    Jan 1, 1932

  • CIM
    Oil Prospects Along the West Flank of the Turner Valley Gas Field

    By J. Grant Spratt

    THE Turner Valley gas-field, situated some thirty miles southwest of Calgary, Alberta, has been the topic of much discussion, particularly from a geological viewpoint. Several papers (1, 2, 3, 4, and

    Jan 1, 1936

  • CIM
    Chrome Grinding Balls at Campbell Mine

    By Bill Shand

    "Placer Dome - Campbell Mine is a gold mine located at Balmertown in the Red Lake District of North Western Ontario. During the last 50 years, the mine has produced over ten million ounces of gold.A c

    Jan 1, 2001

  • CIM
    Geology and Mineral Deposits of the Gallinas Mountains REE Deposit, Lincoln and Torrance Counties, New Mexico, USA

    By Virginia T. McLemore

    The Gallinas Mountains are in northern Lincoln County and southern Torrance County, New Mexico, USA where a series of alkaline igneous bodies, including porphyritic latite, trachyte/syenite, andesite,

    May 1, 2011

  • CIM
    Flotation Kinetic Studies -Going from Laboratory to the Plant

    By Richard Klimpel

    "Over the last 15 years, there has been a number of plant scale sulfide mineral flotation tests organized by this author specifically aimed at understanding how flotation rate varies with reagent type

    Jan 1, 1997

  • CIM
    Effect of Environmental Conditions and Rock Properties on Adhesive Bond of Thin Spray-on Liners

    By Hasan Ozturk

    Laboratory testing examined the effect of a variety of intrinsic rock properties and environment conditions that influence the adhesive bond between rock and thin spray-on liners. The liner materials

    May 1, 2004

  • CIM
    Real-Time Data Reconciliation for Process Control

    By Éric Poulin, Simon Gariépy, Mario Paredes Malca

    "While the design of a control strategy depends on the available process knowledge, its implementation depends on the available process information. On-line chemical analyzers are today widely spread

    Jan 1, 2006

  • CIM
    Low-Discharge Grinding at Sylvanite Gold Mines, Limited

    By C. E. Rodgers

    WHEN I was asked to prepare, for presentation at the 1938 Annual Meeting of the Institute, some data concerning low-discharge grinding at the Sylvanite mill, it seemed entirely reasonable to expect to

    Jan 1, 1938

  • CIM
    Induration Machine Advanced Process Control (APC) at the Iron Ore Company of Canada

    By Robert J. Kuhne

    The Iron Ore Company of Canada has successfully employed advanced process control (APC) to optimize the operation of their induration machines. A significant increase in machine throughput and a redu

    May 1, 2007

  • CIM
    Design and Implementation of Advanced Automatic Control Strategy Based on Dynamic Models for High Capacity SAG Mill

    By Rodrigo Toro, Ivan Yutronic N

    "The Copper Concentrator Plant of Compañía Minera Doña Inés de Collahuasi (CMDIC) is composed of three grinding lines, the third one being the largest. Due to the capacity feature of the third line, s

    Jan 1, 2010

  • CIM
    Comparison of Artificial Neural Networks and a Geostatistical Method in Grade Estimation

    By Hamid Mahmoudabadi

    In the present paper, the performance of four approaches based on neural networks and geostatistical method for grade estimation are compared and analyzed their performance to find a proper method. Fo

    Oct 1, 2009

  • CIM
    Rougher Flotation Improvements at P.T. Freeport Indonesia’s Grasberg Operation

    By Harry Siewert

    "The commissioning of the 4th concentrator (C4) at Freeport Indonesia in early 1998 increased total mill throughput from 130k to 230k tonnes per day. The C4 flowsheet consists of a single 38 ft diamet

    Jan 1, 2001

  • CIM
    Design of the Kubaka Grinding Circuit Using SPI and Bond

    By Graham Holmes, John Starkey

    "The Kinross Kubaka Project is a gold mine located in the Russian Far East. The grinding circuit, comprised of a 6.1 m diameter x 2.74 m long SAG mill and a 4.1 m diameter x 5.5 m long secondary ball

    Jan 1, 2001

  • CIM
    Rock Mechanics Approach for the Recovery of the Zone G Crown Pillar at the Raglan Katinniq Mine

    By P. P. Andrieux

    The recovery of the Zone G crown pillar, located between the bottom of the open pit and the top of the underground workings at the Raglan Katinniq Mine in Nunavik, started in the summer of 2008 and sh

    May 1, 2009

  • CIM
    Vector Neutral Truck: A 10% Improvement to the Haulage Cycle

    By Michael Stuart Parsons

    The haulage cycle is the sequence which a haulage vehicle must first arrive at the loading area, then turn around and reverse into position. Once it is loaded, the vehicle leaves and travels to the un

    May 1, 2003

  • CIM
    Introduction of China’s Copper Converting Technologies

    By Huilan Yang, Feng He

    This paper intends to introduce the development of copper smelting and converting technologies in China in recent years, with a particular emphasis on the introduction of various continuous converting

    Jan 1, 2019

  • CIM
    The Use of Fibre Reinforced Shotcrete Fill Retaining Walls with Engineered Drainage System to Achieve Safe and Efficient Hydraulic Fill Placement in Underground Voids

    Safe underground mine backfilling with hydraulic fill requires efficient fill drainage and stable fill retaining walls or bulkheads. If any or both the above two requirements are not satisfied, such

    May 1, 2007

  • CIM
    Mineralogical and Metallurgical Results at Peñoles´ Mining Operations - Mexico

    By Luis Magallanes-Hernández

    "Industrias Peñoles, S.A. de C.V. (Peñoles) in Mexico, is a major silver producer. The Peñoles Mining Division has eight Mining Operations and in seven of them, flotation is used to concentrate the me

    Jan 1, 2005