Development of the Primary Ventilation System at Mount Isa: IV. Aerodynamic Performance TrialsPerformance trials followed the commissioning of three large mine fans at Mount Isa in 1965. Actual performance characteristics were determined. These were in good agreement with predicted performance
Jan 1, 1967
-
The Influence of a Pipe Reactor to Improve Pre-Oxidation and Gold Recovery and Lower Cyanide ConsumptionBy G Senanayake, J Andreazza
The general experience in gold cyanidation research activities and plant practice is that high oxygen and cyanide concentrations improve gold leaching kinetics which in turn reduce residence time and
Jan 1, 2002
-
Rehabilitation, Landscaping, And TressThe aim of this paper is to examine the problems confronting the planner, designer, constructor and management when rehabilitating the works associated with road building- and including quarry and
Jan 1, 1976
-
Some Practical Aspects of Design and Operation of Water and Ore Addition Points in Grinding CircuitsThe design of water and ore addition points has an important bearing on the ease of operation of a grinding circuit. The nature of some of the design decisions and the possible options of the desi
Jan 1, 1978
-
Mine Stability Evaluation from Microseismic ActivityBy Harris R. W
Any defect activity resulting from an applied stimulus on a structure will generate a stress wave which travels in the medium under the laws of acoustics, thus the name of acoustic emission (AE).
Jan 1, 1992
-
Underground Mine Project DevelopmentThis paper reviews factors involved in the feasibility stage of underground mine project development. Emphasis is placed on the need to first select the best method of extraction and make the most
Jan 1, 1983
-
Miwah Prospect High Sulphidation Au-Cu Mineralisation, Northern Sumatra, Indonesia (4b0407ac-b0c0-4d41-9954-f2633d517077)By Fleming GJ
The Miwah prospect lies on the dilational 070¦ trending Miwah Lineament near its intersection with northerly oriented fractures within Pliocene volcanic rocks exposed between a NW trending segment of
Jan 1, 1995
-
An Experimental Investigation to Evaluate Gas Flow Characteristics of CoalBy McPherson M. J
An experimental investigation was carried out to determine the various gas flow characteristics of bituminous coal samples. Adsorption and desorption tests were first conducted to estimate the qua
Jan 1, 1988
-
Sidewall Fracturing in Coal Room and Pillar and Pillar Extraction PanelsIn coal room and pillar, and pillar extraction panels, the sidewall conditions were investigated based on underground measurements and numerical simulations. Three-dimensional linear elastic model
Jan 1, 1992
-
Ground Support by Rock Bolting at Mount Isa Mines LimitedRock bolting has become the most important method of ground support at Mount Isa. Various types of rock bolts are used to suit the different applications and requirements. To apply rock bolting tec
Jan 1, 1971
-
Design Approach to Assess Coal Mine Roadway Stability and Support RequirementsBy Fabjanczyk M. W
The design of underground mine roadways (tunnels) requires a detailed understanding of the in situ stressfield, the rock failure modes, the performance characteristics of reinforcement or support memb
Jan 1, 1993
-
Practical Design and Operational Aspects of Bulk Solids Storage and Discharge FacilitiesBy Ooms M, Scott OJ
This paper is concerned with the design and operation of storage and discharge facilit- ies for bulk solids handling. It presents an overview of the basic design philisophy emphas- ising the influenc
Jan 1, 1978
-
Blast Driven Mine OptimisationBy Little T. N, Bettess D
For many mining operations the challenge of equalling World Best Practices has become the key motivator for increasing mine productivities and for lowering total costs. In most instances this will o
Jan 1, 1995
-
Modelling the Initial Pit Design - The First Step for Project ValuationBy R Wolff
One critical factor in open pit mining projects is the estimation of the recoverable reserves. The reason for this is that at the valuation stage there is a lack of information about future metal pric
Jan 1, 2006
-
Granite Gold Mineral Systems in New ZealandBy G A. Partington
Recent research has highlighted the potential of a relatively new style of gold mineralisation related to granite intrusion. New discoveries in Alaska, Central Europe and Asia and Eastern Australia wi
Jan 1, 2005
-
Scenario Thinking - A Powerful Tool for Strategic Planning and Evaluation of Mining Projects and OperationsBy G Nicholas, S Coward, J Vann, R Wolff, S Jackson, S Moayer, A Bye
"A new approach to mineral project evaluation is described called Scenario-Based Project Evaluation (SBPE). SBPE incorporates well established æscenario planningÆ and æscenario thinkingÆ approaches, w
May 24, 2012
-
Baseline Requirements for Biological Monitoring Programs Used to Assess Mining ImpactBy C L Humphrey
Biological monitoring programs for environmental protection require techniques that will provide both early detection of possible adverse effects, and assessment of the ecological significance of th
Jan 1, 1994
-
The Kermadec Arc, New Zealand - A Ten-Year Odyssey of Discovery Along the World's Most Hydrothermally Active Intraoceanic ArcResearch cruises dedicated to seafloor hydrothermal activity along the Kermadec arc first began with the Sonne-135 expedition in 1998. This was followed by the worldÆs first systematic survey for vent
Jan 1, 2008
-
Common Sense and Good Communication in Mineral Resource and Ore Reserve EstimationBy J Vann
Mineral Resource and Ore Reserve estimation is a challenging and demanding field, requiring application of professional knowledge, skill and experience of the highest order. If the many potential pitf
Jan 1, 1999
-
Automatic Contouring of Geological DataThis paper presents a review of computer techniques for the automatic contouring of geological and geophysical data with output as interactive display on graph plotters or graphics terminals and p