Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Friction and Sliding of Joints

    Methods of measuring the frictional properties of rock surfaces, both by direct sliding and in triaxial apparatus, are described. It was found that for some rocks the coefficient of friction remains r

    Jan 1, 1969

  • AUSIMM
    Mine Sequencing for High Recovery in Western Australian Mines

    By M P. Sandy

    Some Western Australian underground mines are challenged by very high stress gradients. This environment frequently results in poor induced ground conditions and damaging seismic activity. In some cas

    Jan 1, 2003

  • AUSIMM
    The Plate Boundary North of Australia

    Epicentres of recent shallow earthquakes in the region (3-12¦S, 126-150`E) were plotted to identify the various plate boundaries in the region, in particular the southernmost one marking the north

    Jan 1, 1987

  • AUSIMM
    Specification and Selection of Hand-held Gas Monitors (Detectors) for Underground Mines

    By D J. Brake

    There are many sources of gas in underground mines including development and production blasting, strata gases, spontaneous combustion, diesel equipment, chemicals used for a wide range of functions,

    Aug 31, 2015

  • AUSIMM
    Thermodynamic modelling of species distribution in AlCl3:BMIC salts

    By M K. Nahian, R G. Reddy

    The thermodynamic model for species distribution in aluminium chloride (AlCl3) and 1-butyl-3- methylimidazolium chloride (BMIC) system was developed. The experimental thermodynamic data, considering a

    Aug 21, 2024

  • AUSIMM
    Preconditioning a Large Pillar at Mt Charlotte Mine

    By Lee M. F, Guilfoyle K

    A large hard rock rib pillar was recently preconditioned at Mt Charlotte mine using a novel blasting technique. The motivation for trialling this procedure was a history of past pillar failures, wit

    Jan 1, 1995

  • AUSIMM
    Fimiston Open Pit

    By Neill A, O&apos

    The City of Kalgoorlie/Boulder is situated approximately 600 kilometres to the east of Perth (Fig. 1), and is the major regional centre of the Eastern Goldfields, supporting a population of approxim

    Jan 1, 1991

  • AUSIMM
    Modern mining – why bandwidth matters

    By D Kent

    "There has been a revolution occurring in underground mining over the last several years, where big headline items such as the Internet of Things (IoT), optimisation, managing data, data mining etc –

    Oct 16, 2017

  • AUSIMM
    From Sublevel Stoping to Sublevel Caving at Rana Gruber, Norway – Rock Mechanical Aspects

    By A M. Myrvang, B Nøst, N Q. Trinh, I S. B Bergh

    The iron ore producer Rana Gruber AS is situated in northern Norway just below the Arctic Circle, and has been producing hematite and magnetite concentrates for more than 60 years. Since the late 1990

    Nov 5, 2014

  • AUSIMM
    Design, implementation and field performance of a face destress blasting method for mine development

    By E Villaescusa, C Drover, I Onederra

    Development face destress blasting is a construction technique in deep mining, which aims to prevent, reduce the frequency, or manipulate the timing of violent, stress-driven rock mass instability at

    Nov 29, 2022

  • AUSIMM
    A New Technique for Predicting Rock Fragmentation in Blasting

    The explosion of a charge in a drillhole sets the surrounding rock mass into vibrating stress wave motion. Except in the immediate vicinity of the drillhole, the dynamic stresses associated with thi

    Jan 1, 1995

  • AUSIMM
    Steel Wire Ropes for the Mining Industry

    The subject of steel wire ropes covers such a wide range of points that it would be impossible to deal with it fully in one paper, and in view of the apparent scarcity of published information on the

    Jan 1, 1947

  • AUSIMM
    Open Stoping with Associated Caving at Mount Lyell

    Underground mining of the ore below the West Lyell open cut commenced in 1972 with the 10 Series stopes above rail haulage level. The third lift of stoping (30 Series) com- menced this year, and acce

    Jan 1, 1982

  • AUSIMM
    An Approach to Hard Rock Pillar Design at the McArthur River Mine

    By E Villaescusa

    This paper describes a methodology for the design of mine pillars at the McArthur River Mine. The pillar strength is calculated using a method that accounts for confinement, pillar geometry and intact

    Jan 1, 1998

  • AUSIMM
    On the Effect of Dynamic Fracture Rocks on the Blasting

    The impulsive loading tests under confining pressure were performed to investigate the dynamic fracture properties of rocks in a triaxial stress state. The apparatus in this study consists of the Sp

    Jan 1, 1990

  • AUSIMM
    How to Cope with Cutter Roof Problem

    This paper presents results of the experiments carried out in Beth Energy No. 33 Mine for the purpose of alleviating problems associated with cutter roof. Cutter roof problems have delayed the adva

    Jan 1, 1992

  • AUSIMM
    Some Aspects of Rock Mechanics Applicable to Underground Coal Mining

    By Katsuyama K, Nag DK

    Three aspects of rock mechanics, namely, in-situ stress estimation by acoustic emission (AE) method, strength of rock mass and role of chemicals to reduce the strength are covered. It is possible to d

    Jan 1, 1998

  • AUSIMM
    Large Compact Bucket Wheel Excavators

    Most compact bucket wheel excavators in use are in the small to medium range. Large compact bucket wheel excavators compete directly with con- ventional longer boom excavators which have operational

    Jan 1, 1989

  • AUSIMM
    Gold Rank Indicators - Exploration to Acquisition

    By Robinson T

    The paper describes a spreadsheet system that enables selection of projects and companies that meet the user's corporate exploration and/or acquisition philosophy. A regularly maintained commer

    Jan 1, 1988

  • AUSIMM
    Development of Robot System for Automatic Assembling of Bolted Segments

    By Harada M, Katsuta S

    In order to shorten the time taken to com- plete shield tunnel excavation work, reduce labor costs and to improve safety, an automatic assembly robot system for the segments used has been developed

    Jan 1, 1987