    Managing the Margin at Norseman, Western Australia – A Case Study

    By B P. Micke

    Central Norseman Gold Corporation was established in 1935 and has been mining on the Norseman field in Western Australia since then. It is Australia’s longest continuously operating gold mining operat

    Mar 24, 2014

  • AUSIMM
    An Integer Programming Model for Optimisation of a Heavy Media Coal Preparation Plant

    By J Zhou

    This paper discusses the implementation of a mixed integer linear programming model for a coal preparation plant. The plant considered consists of primary and secondary heavy media cyclones, hydrocycl

    Sep 26, 2011

  • AUSIMM
    The Preparation of Pastefill and its Use at Some Canadian Mines (6e4bc1a5-4335-470a-b421-2dd830dbe3e2)

    Two key elements in the design of a pastefill or high density hackfill system are the preparation of the backfill material and its distribution underground. This paper examines these two areas. Owin

    Jan 1, 1998

  • AUSIMM
    Flotation as an Operation of Macromolecular Mass Transfer

    By M R. Drumond

    The present work presents a new theoretical interpretation of the flotation process, which can also be applied to other mineral processing physical unit operations. This interpretation is part of the

    Jan 1, 2005

  • AUSIMM
    Determination of the Complete Sampling Distribution for a Particulate Material

    By G J. Lyman

    The theory of sampling has progressed slowly over the last century. The concepts of correct sampling were known to mining engineers such as D W Brunton in the 19th century. It was recognised early in

    Jul 29, 2014

  • AUSIMM
    Effect of mud farming on the dewatering of bauxite residue

    By D J. Williams, C Zhang, F E. Herrera Cabrera

    Farming on bauxite residue using screw propelled equipment (SPE) has been commonly practised to accelerate dewatering and as it promotes consolidation and enhances storage capacity. However, it is unc

    Jul 1, 2021

  • AUSIMM
    Effect of High Horizontal Stresses on the Stability of a Coal Mine Roadway

    By Hematian J

    A high horizontal stress field has significant effect on the stability of underground roadways and influences the design of a support system in this environment. The high horizontal stresses at E1lalo

    Jan 1, 1995

  • AUSIMM
    Open Stope Mining Strategies at Brunswick Mine

    By P Andrieux

    By 1996 ground control-related problems at Brunswick Mine had raised serious concerns regarding the safe and economical extraction of large portions of the reserves. These difficulties were mainly cau

    Jan 1, 2000

  • AUSIMM
    Using Reverse Circulation Drilling to Improve Sampling in a Complex Underground Gold Operation – An Innovative Approach to Underground Grade Control at the Sunrise Dam Mine, Western Australia

    By F Clark, J T. Carswell

    Ore definition for final stope planning is often a challenging prospect in underground (UG) gold mines which exhibit high geological and grade variability. Unlike the grade control (GC) scenario in an

    Aug 18, 2014

  • AUSIMM
    Optimisation of an Image Analytical System for Bulk Materials Using the Theory of Sampling

    By K H. Esbensen

    Optimisation of a real-time at-line monitoring system for control of industrial granule coating quality is presented. The system is based on a fluorescence imaging system, because fluorescence origina

    Jan 1, 2005

  • AUSIMM
    Adding Copper Recovery and Acid Consumption Variables to the Geological Model of Quebrada Blanca

    By R Schiller, E Chait

    "Quebrada Blanca is a porphyry copper deposit located in the Eocene-Oligocene belt of Chilean Andes. Operation started in 1994 and original reserves for supergene mineralisation gave a life-of-mine (L

    Jun 15, 2016

  • AUSIMM
    Negatively Geared Ore Reserves – A Major Peril of the Break-even Cut-off Grade

    "Recognising that the mining industry is wedded to the break-even cut-off grade rather than a cut-off grade that optimises value, the author examines some perils and pitfalls in the use of break-even

    Mar 8, 2016

  • AUSIMM
    Special Purpose Simulator for Improved Estimation of Day-to-Day CIL/CIP Recoveries

    Sampling of CIL/CIP circuits is typically done by compositing samples of feed and tails over eight or 12 hour periods. As the residence time in the leaching tankage may be approximately 20 hours, the

    Jan 1, 2006

  • AUSIMM
    "Geometallurgy – Driving Innovation in the Mining Value Chain"

    "Geometallurgy is a discipline that seeks to improve the sustainability of the extraction of metals and minerals by promoting the smarter use of non-renewable resources, better energy efficiency and g

    Jun 15, 2016

  • AUSIMM
    The Deep Parts of the Kiirunavaara Apatite-Magnetite Orebody in Kiruna, Northern Sweden and the Impact of Future Mining on the Township of Kiruna

    The Kiirunavaara apatite-magnetite orebody is about 4 km long and approximately 100 m thick sheet-like body, which lies roughly in a north-south direction and dips from the horizontal plane along its

    Jan 1, 2006

  • AUSIMM
    Setting Restoration Goals for Restoring Pit Lakes as Aquatic Ecosystems – A Case Study from Southwest Australia

    By E J. B van Etten

    Pit lakes may form when open cut mining leaves a pit void that then fills with ground and surface waters. This often replaces terrestrial ecosystems that existed prior to mining with an aquatic ecosys

    Oct 5, 2011

  • AUSIMM
    Distributed Graphics Processors Widened Dimensions For Mining Applications

    By Johnson MT

    The microprocessor revolution of the 1970's dramatically improved the price/per- formance of graphics hardware. Together with improved communications and new software concepts and standards th

    Jan 1, 1983

  • AUSIMM
    Design and Construction Contract C916 Beauty World Station and Tunnels, Singapore

    By R McDonough

    DTL2 contract C916 was awarded in March 2009 for S$340 M. This contract includes two mass rapid transit (MRT) 1100?m long bored tunnels using two slurry tunnel boring machines (TBMs), with an internal

    Sep 17, 2014

  • AUSIMM
    Managing Uncertainty on the Cut 8 Project

    By G M. Jones, J Rademan

    Debswana, owned by the Government of the Republic of Botswana (GRB) and De Beers in a 50:50 joint venture partnership, operates the Jwaneng diamond mine in Botswana - the most valuable diamond mine in

    May 24, 2012

  • AUSIMM
    Orebody Solid Modelling Accuracy ù A Comparison of Explicit and Implicit Modelling Techniques Using a Practical Example from the Hope Bay District, Nunavut, Canada

    Accurate geometric models of orebodies establish the framework for reliable mineral resource estimates that provide a basis for further exploration and mine planning, as well as for financial models t

    Jan 1, 2006