    High-pressure Fissure Grouting for Drill and Blast Tunnelling, Ambuklao, Philippines

    By C Harrison, A Bowskill

    The Ambuklao hydroelectric dam was originally constructed in the 1950s in the remote and mountainous region of the northern Philippines. Following its construction the dam has suffered heavily due to

    Sep 17, 2014

  • AUSIMM
    Practical Sampling for Online Analysis and Composite Samples of Slurries - The Art of Compromises

    In practice a sampling solution is a compromise of many requirements: the sample should be representative; the sampling system should also be reliable, less than 95 per cent availability rest

    Mar 1, 2010

  • AUSIMM
    Now, this is the Time for Mining Companies to Choose - Real Option Valuation or Discount Cash Flow

    By S Shafiee, N Abbate

    The evaluation of mining projects requires a methodology that will give flexibility and manage the existing uncertainty within the projects. The discount cash flow (DCF) and other traditional evaluati

    May 24, 2012

  • AUSIMM
    Recovery of Colloidal Gold from Oxidised Concentrate Wash Liquor - Further Improvement

    By R Symes

    The Fosterville Goldmine in Victoria Australia employs the BIOX« Process to liberate gold from its sulfidic flotation concentrate through bacterial oxidation. Gold occurrence is primarily as submicron

    Oct 29, 2012

  • AUSIMM
    Improvement in Iron Ore Agglomeration Through Design Modification in Coke Crushing Plants

    By B K. Da, S A. Balaji, G P. Roy, T K. Dutta

    The raw material handling complex at the Durgapur steel plant provides iron ore, crushed coke and flux to two sinter plants. Either some facilities were not envisaged or not properly designed before t

    Jan 1, 2005

  • AUSIMM
    Redefining Competent Persons Criteria for Resource Geologists

    By J Coombes

    There is much debate on the Competent Persons qualifying criteria for providing classified resource estimates for public reporting. The CRIRSCO family of codes including the JORC Code, SAMREC, PERC an

    Aug 18, 2014

  • AUSIMM
    Improvements in Service Life and Cost Reduction for Gyratory Primary Crushers through Mantle and Concaves Optimisation – A Case Study

    By I Elias, E Moya, S Chaffer

    This paper is based on a case study from a mine site that operates two gyratory primary crushers. These crushers were encountering problems, which included inconsistent P80, reduced liner life tonnage

    Jul 13, 2015

  • AUSIMM
    Comparison of heat, noise and ore handling capacity of battery-electric versus diesel LHD

    By C McGuire

    As mobile equipment electrification in underground mining continues to gain popularity, control ofheat and humidity in the workplace is becoming a key driver in sizing of ventilation and mine aircooli

    Oct 12, 2022

  • AUSIMM
    Didipio Flash Flotation and Gravity Recovery Circuit

    By M McGrory, A Rodolfo, J Paredes, L E. Manguba, K A Villaspir, G Webb, R Setiagani, H Cardenas

    "OceanaGold’s Didipio operation has been in operation for three years. Integral to the flow sheet design is a flash flotation circuit treating a portion of cyclone underflow, consisting of an Outotec

    Oct 10, 2016

  • AUSIMM
    Controlled Blasting for Twin Tunnels with a Shallow Cover under an Operating Railway Line

    By G Gopinath, R Balachander, H S. Venkatesh

    This paper describes in detail the controlled blasting adopted and the measurements undertaken for the successful excavation of large twin tunnels under a shallow cover for a six-lane highway project

    Aug 24, 2015

  • AUSIMM
    Improved Trigger Action Response Plan Development Based Upon Mine-specific Data

    By D Cliff, B Belle

    Trigger action response plans (TARPs) are inherent to managing multiple hazards such as high gas content with multiple coal seams, high spontaneous combustion propensity, heat and ventilation. TARPs a

    Aug 31, 2015

  • AUSIMM
    An Application of Simultaneous Optimisation – Improving the Payback Period of a Zinc-Copper Open Cut Project

    By D J. Thobaven

    Project financing challenges caused by declining commodity prices have heightened the need to improve project metrics such as minimising capital payback and maximising net present value (NPV). Khnaigu

    Nov 24, 2014

  • AUSIMM
    Effect of Gravity Recovery on Overall Plant Recovery, Sadiola - A Case Study

    An enhanced gravity concentrator was installed in conjunction with an intensive leach reactor at the Sadiola plant in Mali last year and commissioned in December 2007. There has been much debate over

    Aug 1, 2010

  • AUSIMM
    Molecular modelling applied to the flotation of iron ores

    By M Badawi, Y Foucaud, C Veloso, J Laine, A C. Araujo

    Iron is one of the most exchanged commodities worldwide. Its use for steelmaking explains the growing demand in the metal which remains mainly produced by the mining and the beneficiation of iron ores

    Nov 8, 2021

  • AUSIMM
    Lessons learnt from six mine disaster case studies to improve audit and assurance and ESG

    By A Atkins

    Six recent case studies were selected based on the eight main causes of mine disasters (Table 1; Quinlan, 2014) and where credible information sources, such as Royal Commission Reports, Coronial Inves

    May 5, 2022

  • AUSIMM
    A New Tool for Optimisation of Mine Waste Management in Potential Acid Forming Conditions

    By Y Li, Z Fu, D J. Williams, E Topal

    Mine waste rock is unavoidable in the recovery of ore by open pit mining methods. Effective management of waste rock movement covers the removal and placement of the waste rock, generally in a surface

    Jul 27, 2015

  • AUSIMM
    Internalising Ecological Costs in Evaluating and Planning a Mining Project

    By Q Wang

    Net present value (NPV) has been the main criterion in mining project evaluation and production plan optimisation. It is a common practice in NPV calculations to take into account only the tangible co

    Sep 26, 2011

  • AUSIMM
    Analysis on composition and physico-chemical property change of PbO-bearing slag in Pb smelting

    By G Cao, Y R. Cui, J X. Zhao, H P. Gui, G H. Wang, Z M. Wang, M M. Ren, B Li

    Pyro-metallurgy is still the main process for lead production and a lot of lead direct smelting processes have been developed in recent years. All the processes will experience two steps in common. Th

    Aug 21, 2024

  • AUSIMM
    Technology and Changes in Mines Rescue

    As the mining industry looks to new technologies for a safe work environment and increased production rates, so should emergency response teams when dealing with organisational incidents. Implementati

    Jan 1, 2004

  • AUSIMM
    Sampling for the percentage moisture in the iron ore industry

    By M Fritz, B Ziegelaar

    "For moisture samples, the International Standard for iron ore sampling states the following: Moisture samples shall be processed as soon as possible and test portions weighed immediately. If this

    May 9, 2017