    Real-Time Risk Analysis and Hazard Management

    Safety remains a critical priority for the Australian mineral resource industry and will receive increased focus in the future. This is particularly evident in underground coal mines where reserves ar

    Jan 1, 2005

  • AUSIMM
    Dynamic Pit and Waste Dump Schedule Optimisation at Tropicana Gold Mine

    By S Graskoski, S Craig, C Myburgh

    Too often in mine planning, maximising revenue-generating material takes precedence over minimising costs. The ability to target both revenue and cost optimisation enables mine plans to fulfil corpora

    Sep 26, 2013

  • AUSIMM
    Design and Construction of Large Caverns in Granite – Ulu Jelai Hydroelectric Project, Malaysia

    By B Chapman, B Gaida, L Drowley

    The 372 MW Ulu Jelai Hydroelectric Project is a peaking power scheme located in the Cameron Highlands, Malaysia. The main features of the project include an 84 m high roller compacted concrete dam; tw

    Sep 17, 2014

  • AUSIMM
    Hypersaline-Induced Reduction in Cyanide Ecotoxicity at Gold Operations, thereby Obviating Detoxification Plants

    By G B. Smith, D Hillier, T Gibbons, D B. Donato, M D. Adams, S Davies, R S. Schulz

    Responsible management of cyanide solutions and tailings on gold processing plants worldwide is an important aspect to these operations and is regulated via guidelines provided by the International Cy

    Sep 26, 2013

  • AUSIMM
    In-Line Pressure Jig Preconcentration Plant at the Pirquitas Mine

    By A H. Gray

    Gekko Systems Pty Ltd engaged in the test work, design, manufacturing and commissioning of the pre-concentration plant at Silver Standard Resources Inc’s Pirquitas mine in the north western Jujuy prov

    Aug 8, 2011

  • AUSIMM
    A comparison of CPT based state parameter estimates in coal boiler ash

    By B Wentzinger

    This paper presents the results of state parameter estimates in an active coal boiler ash storage facility using the most recent methods currently in use for cone penetrometer interpretation. State pa

    Jul 1, 2021

  • AUSIMM
    Flow field investigation of high gravity spirals using experimental and CFD techniques

    By R M. Yanamandra, S K. Tripathy, N Mangadoddy, P Sudikondala, P Ankireddy

    Spiral concentrator is one of the most commonly used gravity concentration devices in mineral processing. The particles are classified based on their specific gravity and size. The present work analys

    Aug 24, 2022

  • AUSIMM
    Understanding and modelling squeezing ground conditions at the Ballarat Gold Mine

    By B Roache, A Vakili, R Talebi

    When a highly anisotropic or weak rock mass is subjected to high-stress conditions, it can lead to large ongoing deformations or squeezing ground conditions. Squeezing ground conditions can impose inc

    Nov 30, 2018

  • AUSIMM
    Analysis on crack distribution and evolution characteristics of gangue backfilled working face roof

    By X Y. Ma, X G. Tian, P F. Zhang, T B. Zhao, Z H. Li, Z Y. Fu

    This study analysed the fracture characteristics and movement process of goaf roofs under the condition of gangue backfilled mining, based on the engineering conditions of Tangshan Mine F5001 gangue b

    Nov 29, 2022

  • AUSIMM
    Evolution of Cretaceous - Recent Drainage Networks and Distribution of Associated Gold Placers in Otago and Southland, New Zealand

    The development and distribution of gold placers in Otago û Southland is related primarily to the evolution and architecture of three distinctly different drainage networks that developed during and s

    Jan 1, 2006

  • AUSIMM
    Importance of Effective Sampling and Test Work Protocols for Process Plant Design

    By N Guresin, A Cooper, L Lorenzen, H Muller, S C. Dominy

    Sampling and metallurgical test work during various phases of engineering?studies?is of?paramount importance for a robust processing plant design. When developing a process flow sheet, risks in achiev

    Aug 21, 2012

  • AUSIMM
    Structural Analysis of Acoustic Televiewer Logs for Large Diameter Raise Bored Shafts

    By R M. Stephenson

    Large diameter raise boring is a common raise excavation method in the Australian mining industry. Geotechnical investigations were conducted on several large diameter raise bore projects at Gwalia Mi

    Mar 24, 2014

  • AUSIMM
    Mine to Tunnel Scale Discontinuum Simulation of Repeated Dynamic Loading of Mine Excavations

    Underground excavations are subjected to complex stress changes caused by nearby mining, but may also be affected by repeated dynamic loading from blasting and seismic events. In some cases, the combi

    Nov 25, 2010

  • AUSIMM
    The MRMR Rock Mass Rating Classification System in Mining Practice

    By D H. Laubscher

    The in situ rock mass rating system û IRMR - leading to the mining rock mass rating system - MRMR - for jointed rock masses has been used (and abused) in mining operations around the world for the pas

    Jan 1, 2000

  • AUSIMM
    Evolution of rock fill consolidation at Pajingo Gold Mine

    By J Carswell, K McTyer

    The Pajingo gold operation in Queensland is approximately 50 kilometres south of Charters Towers and 134km south-west of Townsville. The resource was discovered in 1983 and first open pit gold product

    Nov 30, 2018

  • AUSIMM
    The EMESRT Approach to Equipment Design - Bringing End Users into the Picture

    The Earth Moving Equipment Safety Round Table (EMESRT) was established by mining companies in 2006 to influence manufacturer's equipment design through a process of engagement. 2010 EMESRT member

    Dec 6, 2010

  • AUSIMM
    Virtual Reality Scientific Visualisation – A Solution for Big Data Analysis of the Block Cave Mining System

    By J Tibbett, A Colebourn, B Hebblewhite, F Suorineni

    The concept of Big Data refers to data sets that are so large, variable and/or complex that traditional data processing applications struggle to integrate the data for effective investigation, analysi

    Nov 4, 2015

  • AUSIMM
    The Resource Management Act 1991: Its Implementation in Otago

    The Resource Management Act has been in force now for approximately ten months. This Act, and the Crown Minerals Act which accompanied it, have substantially changed the manner by which mining operati

    Jan 1, 1992

  • AUSIMM
    Thin Spray-on Liner Concepts and Practical Examples of the Non-Reactive System - MEYCO TSL 865

    TSL Concepts and Practical Examples of the Non-Reactive System - Meyco TSL 865 Thin Spray-on Liners (TSLs) have been intensively investigated by mining and chemical industries within the last decade.

    Nov 25, 2010

  • AUSIMM
    Quality Sampling Using Coiled Tubing Drilling in Deep Mineral Exploration

    By V Rasouli, G Cavanough, A Mokaramian

    The sampling time, the costs and its quality are the three factors that determine the best method of drilling in mineral exploration. The two principal methods of reverse circulation (RC) and diamond

    Aug 21, 2012