Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Information and Methodical Base of Simulation Modelling of Excavator-Truck-Conveyor Complex Operation

    In this paper, the scientific bases of creation of simulation modelling systems of excavator-truck-conveyor complex work are represented. During the simulation modelling process of big mining and tran

    Dec 6, 2010

  • AUSIMM
    Carmen Copper – A Sustainable Approach to Tailings Thickener Upgrades

    By C Maloloy-on, S Morgan, M Deiparine, H Mackie

    There is a strong focus in the mining industry to limit its impact on water quality and usage. This is even more evident in developing countries, where mining companies operate within local communitie

    Sep 7, 2015

  • AUSIMM
    Reply to Contributed Discussion (This Issue) by Gavin W. Clarke and Roger G. Taylor

    The additional information that Clarke and Taylor (1982) provide about the important but poorly documented Ardlethan deposit is, of course, very welcome. However their contention that structural consi

    Jan 1, 1982

  • AUSIMM
    Leaching Studies with Pentlandite and Pyrrhotite

    By Lavers G

    Factors governing the dissolution of nickel and iron in pentlandite and pyrrhotite concentrates from Mt. Windarra were studied for aqueous solutions at normal temperatures and pressures. The effects o

    Jan 1, 1976

  • AUSIMM
    Iron ore transfer chutes – directions after 30 years of scale modelling

    By P Donecker

    Like all chains, iron ore values chains are only as strong as their weakest link, which in ore processing is often the humble chute. While mechanically the simplest element in the iron ore flow sheet,

    Sep 18, 2023

  • AUSIMM
    Stripping of the Southern Exhaust Airway at Mount Lyell

    In the latter half of 1973 a contract was given to Roberts-Holland Joint Venture for the stripping of the southern exhaust airway.The contract was carried out efficiently and relatively cheaply. It wa

    Jan 1, 1974

  • AUSIMM
    Gladstone Hill - Martha Hill Part II

    Mineralisation was identified at Gladstone Hill as far back as the late 1870's û early 1880's, shortly after the initial discovery of Martha Hill. Indeed, early recovery problems from the Ma

    Jan 1, 1999

  • AUSIMM
    Stratigraphic, Mineralogical and Physical Variations at Waikato - North Head, South Auckland: Preliminary Results

    By D Pastars, J L. Mauk

    Located at the southern end of the Awhitu

    Jan 1, 2001

  • AUSIMM
    Estimating Mine Operating Costs - Trials and Tribulations

    The projection of operating costs for mining, processing, and other site operating costs is an exercise which can be fraught with considerable peril. Not only are the physical characteristics of eac

    Jan 1, 1990

  • AUSIMM
    Enhancing magnetite concentrate granulation by blending with hematite ore

    By J Addai-Mensah, M Adam, W Skinner, J Begelhole, K Quast

    Granulation of iron ore fines into robust granules is critical to successful sintering and blast furnace operations in iron and steelmaking. Iron and steelmakers desire iron ore granules with high str

    Jul 24, 2017

  • AUSIMM
    Deep Leaching and Accelerated Post-Mine Oxidation in the 500 Orebody at Mount Isa

    Structurally- controlled deep leaching processes have removed vast quantities of carbonate from a substantial portion of the "silica-dolomite" enclosing the 500 copper orebody. Mine drainage

    Jan 1, 1968

  • AUSIMM
    Predicting Iron Ore Fines Shipment Moisture

    By J E. Everett, D Linden, P Maney

    In response to the implementation of a new schedule for iron ore fines in the International Maritime OrganizationÆs (IMO) International Maritime Solid Bulk Cargoes (IMSBC) Code, improved measures for

    Aug 12, 2013

  • AUSIMM
    Predicted Dynamic Response of Holdup in Continuous Ball Mills

    The dynamic response of holdup in a continuous ball mill has a direct influence on the rate function of grinding kinetics and is useful for predicting the variation in the size distribution of the fin

    Jan 1, 1975

  • AUSIMM
    Operation of a Rapped Sieve Bend

    By Firth B. A

    The classification performance of a Dutch State Mines (DSM) Rapped Sieve Bend has been investigated in a series of experiments. Coal slurries of a nominal 0.5 mm size were classified in the separation

    Jan 1, 1983

  • AUSIMM
    Presidential Address Mining on Private Property on the Goldfields of Western Australia

    In several of the States of Australia, mining on private property has been seriously hampered by the fact that large areas of land have been alienated from the Crown before the discovery of gold or ot

    Jan 1, 1901

  • AUSIMM
    A Geometallurgical Study of the Witwatersrand Gold Ore at Carletonville, South Africa

    By D L. Reid, G Nwaila, J Petersen, J-P Franzidis, Y Ghorbani, M Becker, F C. de Beer, L C. Bam

    Traditional methods of gold extraction have involved comminution and processing via cyanide leaching, all of which are associated with energy, cost and environmental implications. Subsequently, numero

    Sep 29, 2013

  • AUSIMM
    Oxygen in Matte and Oxidic Nickel in Slag (761da7cb-f038-4aa0-94ae-a2b08821817f)

    Based on the examination of thirty sets of contiguous matte and slag samples taken from industrial nickel smelters a relationship is predicted between oxidic nickel in slag, oxygen in matte and the Ni

    Jan 1, 1980

  • AUSIMM
    Avoiding Unnecessary Drilling

    The extra information brought by further drilling may seem necessary to achieve control over block grades if elementary estimation techniques are used. However a geostatistical study of an Australian

    Jan 1, 1975

  • AUSIMM
    On the Role of Dixanthogen in Froth Flotation

    On the Role of Dixanthogen in Froth Flotation

    Sep 13, 2010

  • AUSIMM
    George Fisher Mine - Feasibility and Construction

    By G S. B Karunatillake

    Following a pre-feasibility study, Mount Isa Mines commenced a feasibility study on the deposit of the George Fisher Mine in May 1997. Board approval was granted in May 1998 to construct a 2.5 million

    Jan 1, 2000