Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
New Laminated Displacement-Discontinuity Program: Fundamental Behavior
By Keith A. Heasley
In the past, numerous displacement-discontinuity (DD) models of stratified rock masses have been proposed using a homogeneous isotropic elastic overburden. In this paper, it is postulated that a lamin
Jan 1, 1996
-
Horizontal Stress and Coal Mines: Twenty-Five Years of Experience and Perspective
By G. J. Hasenfus
Although theoretical and conceptual knowledge regarding the impact of horizontal stress on underground coal mining excavations have existed since at least the mid-1900s, it wasn?t until the late 1970?
Jan 1, 2006
-
Mine Pillar Stability Analysis Using Fem Methods - Two Case Studies
By David H. Tang
Massive pillar failures were observed at two underground coal mines. The results of stability analysis using traditional pillar design formulae did not agree with the underground observations. Finite
Jan 1, 1990
-
Load Determination For Long Cable Bolt Support Using Computer Aided Bolt Load Estimation (CABLE) Program
In this paper a numerical formulation is presented for determination of the axial load along a cable bolt for a prescribed distribution of rock mass displacement. Results using the program CABLE indic
Jan 1, 1996
-
Work Practices to Manage Bump Prone Ground
By Floyd Varley
In deep and highly-stressed coal mining, advanced design practices are used to minimize the potential for damaging events to occur. Despite these design efforts, the hazard of coal mine bumps can not
Jan 1, 2008
-
Optimization of the Stress Control Method to Improve Productivity and Safety in Underground Coal Mining
By Shosei Serata
The Stress Control Method improves productivity and safety in underground coal mining. The method stabilizes the roofs and floors of mine openings in both shallow and deep coal beds, regardless of whe
Jan 1, 1986
-
An Overview Of The National Roof Evaluation Accident Prevention (REAP) Program
By J. M. Krese
This paper gives an overview of the National REAP program emphasizing the program's current status and future plans. A brief historical review of the program will be given containing roof-fall ac
Jan 1, 1988
-
The Influence of the First Layer Thickness of Immediate Roof on its Stability
By Lixun Kang
Bedded structure is the characteristics of coal measures strata. Bedding planes, coal streaks and soft rock bands existing in roof strata destroyed its continuity in the direction perpendicular to the
Jan 1, 2005
-
Harworth Colliery: Rockbolted Support In Weak Roof At Depth
By Dave Bigby
Hatworth Colliery, operated by RJB Mining (UK) Ltd, is successfully mining the Deep Soft Seam at a depth of 1000m using single face retreat longwalling. The seam is characterised by a weak roof genera
Jan 1, 1996
-
Fully-Grouted, High-Strength, Mechanical Shell Tensioned Bolt Improves Pittsburgh Seam Primary Roof Support
By Daniel Su
Approximately 90% of the primary roof bolts used in CONSOL?s Pittsburgh seam coal mines is 2-piece, 8-foot long, 7/8? (or ¾?), high-strength, resin assisted, mechanical shell tensioned bolt. The remai
Jan 1, 2007
-
Cross?Correlation Detection of Seismic Events Related to the Crandall Canyon Mine Collapse
By Tex M. Kubacki
On August 6, 2007, the Crandall Canyon Mine experienced a collapse which trapped six mine-workers. An MW 4.1 seismic event was recorded in conjunction with this collapse. An additional 54 seismic even
Jan 1, 2013
-
Mining Through In-panel Entries and Full-face Recovery Room Without
By John Smyth
Mining through in panel entries and the full face recovery method has been successfully practiced at U.S. Stwl, Mine 50. Suppat of the cut-through entries and recovery room is critical. Traditionally,
Jan 1, 1998
-
The research on the mechanical properties of hard roof in underground coal mining
By Xu Lin Sheng
During the mining course, when the roof above coal seams is constituted by thick and hard sandstone (conglomerate), sudden roof movements often take place with great force and de¬struction which is th
Jan 1, 1989
-
Deriving Input Parameters for Numerical Modeling of Fully Resin Grouted Rock Bolts
By Michael Alber
Resin grouted rock bolts are the major support measure in coal mining. They are rather easy and foolproof to install, take immediately load and are the least time consuming support measure for control
Jan 1, 2006
-
CISPM-MS: A Tool to Predict Surface Subsidence and to Study Interactions Associated with Multi?Seam Mining Operations
By Yi Luo
Multiple-seam mining operations induce surface subsidence basins different from those caused by mining in a single coal seam, and also disturb the mining operations in the other coal seams. A computer
Jan 1, 2012
-
Application Of A Simplified Three-Dimensional Roof-Pillar-Floor Interaction Analysis Model For Subsidence Prediction
By Witold M. Pytel
A simplified, three-dimensional, time-dependent, mechanistic model of the overburden-coal seam-floor interaction has been developed and validated at two Illinois coal mines. The model based on the thi
Jan 1, 1992
-
Physical Simulation of Overburden Movement and Stability of Aquiclude in Shallow Seam Mining
By Qingxiang Huang
Shallow seam coal field has the largest coal reserve in China. Mining in shallow depth causes serious problems. One of them is subsurface dewatering. In this paper, the physical simulating model was p
Jan 1, 2006
-
Comparative Study Of Western US Longwall Panel Entry Systems
By Khamis Y. Haramy
This paper summarizes ground control studies of longwall panel entry systems in two Western U.S. coal mines. Presented are comparisons of in situ pressure change measurements and assessments of chain
Jan 1, 1989
-
Rating Coal Mine Roof Strength From Exploratory Drill Core
Characterizing coal mine roof rock is extremely important for hazard assessment, reinforcement, and entry design. The Coal Mine Roof Rating (CMRR) is an innovative rock mass classification that has fo
Jan 1, 1996
-
Multiple Seam Mining Feasibility in the Illinois Basin (USA): LaModel Stress Analysis Programs
By Rebecca Hardy
The escalating demand for coal, in addition to the steady depletion of reserves, has produced increasingly difficult mining conditions for coal mining companies within the United States, resulting in
Jan 1, 2006