Establishing A Mine Ventilation Department In An Operating Coal CompanyBy J. W. Stevenson
The need for a separate ventilation department within the management team was recognized by the management of U. S. Pipe and Foundry before the company was purchased by Jim Walter Corporation in Janua
Jan 1, 1980
-
Mine-To-Mill® Optimization Of Aggregate ProductionBy Greg Adel, Darren Thornton, Julius Krutschnitt, Toni Kojovic, J. Mark Richardson, Bryan Smith
Mine-to-Mill® optimization is a total systems approach to the reduction of energy and cost in mining and mineral processing operations. Developed at the Julius Krutschnitt Mineral Research Centre in
Jan 1, 2005
-
An Overview of Beneficiation and Hydrometallurgical Techniques on Eudialyte Group Minerals Mining, Metallurgy and ExplorationBy Victoria Vaccarezza, Corby Anderson
The demand for rare earth elements for everyday technology and applications has initiated much research into the extraction and recovery of these rare earth elements. An otherwise unknown group of min
-
Recovery Of Gold From Ores With Bromide Containing SolutionsBy J. P. Barbosa, R. V. V. Araújo, R. B. E. Trindade
Bromide stabilizes the auric or aurous ion by forming a stable complex in acidic aqueous solution. The oxidizing agent normally used for the process is bromine, which is a corrosive liquid with high v
Jan 1, 1995
-
Rum Jungle Mine Site Remediation: Relationship Between Changing Water Quality Parameters and Ecological Recovery in the Finniss River SystemBy John R. Twining, Michael D. Lawton, Ross A. Jeffree
The Finniss River system in tropical northern Australia has received 'acid-drainage' contaminants from the Rum Jungle uranium/copper mine site over the past 4 decades. Following mine-site re
Jan 1, 2000
-
Controlling Factors of the E-Field of Electrode-Based Through-The-Earth (TTE) CommunicationBy L. Yan, C. Zhou, M. Reyes
"The MINER Act requires the installation of post-accident, two-way communications and electronic tracking systems for all coal mines. One communication system which can satisfy this requirement is an
Jan 1, 2017
-
The Development of Computer - Aided Underground Mine Planning at Nkana Division of ZCCM LimitedBy M. S. Kabibwa, E. K. C. Chanda
In planning for the future, Nkana Division deepened the Mindola sub-vertical shaft which was commissioned in 1994 in order to access the 30 Mt of ore between 1274 and 1570 m levels. The Nkana Synclino
Jan 1, 1996
-
Effect Of Bit Wear On Productivity Of Continuous MinersBy L. D. Gehi, A. W. Khair, M. Ahmad
This paper presents an analysis of the dynamics of bit wear on the productivity of continuous miners. Two field surveys were carried out. The first survey assessed the impact of bit wear on productivi
Jan 1, 1995
-
Effect Of Depressing Agents On The Flotation Of Oxidized Zinc MineralsBy A. M. Marabini, G. Belardi, V. Alesse, E. Spaziani
The objective of this investigation was to verify the effectiveness of commercial and synthetic depressing agents in a complex oxidized zinc mineral flotation flowsheet using sodium sulfides and amine
Jan 1, 1995
-
A Detailed Heat Balance Study Of A Deep Level Mechanized Cut-And-Fill StopeBy Ian J. Duckworth, Pierre F. X. Mousset-Jones
A detailed heat flow project was conducted at the Homestake Mine in Lead, South Dakota. This paper presents results obtained from a stope sensor system installed in the mine. The design and installati
Jan 1, 1993
-
Minimization of Delays in Plant StartupsBy Terry P. McNulty
During the last 30 years, at least ten authors have dealt with startup ("ramp-up') times for minerals beneficiation, hydrometallurgical, and/or pyrometallurgical plants. Most have attempted to id
Jan 1, 2004
-
Mine Design at the Cannon Mine: Integration of Operational Planning and Geomechanical DesignBy J. F. T. Agapito, C. E. Brechtel, C. J. Gilbert, T. R. Kelly, R. C. Karlson
A multi-lift benching cut-and-fill mining method was adopted at Asamera Minerals (U. S.), Inc.'s Cannon Mine to balance the goals of high productivity and near 100 percent recovery with the need
Jan 1, 1987
-
Slurry Shield Cutterhead Torque Characterization Using AI Machine Learning and Mechanics-Based Modeling - NAT2024By Hongjie Yu, Rakshith Shetty, Claudio Cimiotti, Nick Karlin, Mike Mooney, Vitaly Proshchenko, Matt Kendall
This paper documents an effort to explain cutterhead torque behavior observed during slurry pressure balance TBM tunneling through soft ground on the Los Angeles Clearwater project. AI machine learnin
Jun 23, 2024
-
Integrated Continuous Testing of the Micronized-Magnetite Beneficiation Process in PETC's Coal Preparation Process Research FacilityBy Richard P. Killmeyer, Carl P. Maronde, W. W. Wen, Peter J. Suardini
Under a cost-shared Department of Energy contract, awarded as part of the Coal Preparation Program's High Efficiency Preparation subprogram, Custom Coals International will be installing and test
Jan 1, 1995
-
Service VehiclesBy Robert L. Sundeen, Richard V. Wenberg
Service vehicles, often called support vehicles or auxiliary vehicles, are used in secondary functions to support production activities such as loading, drilling, and timbering. Probably the most comm
Jan 1, 1982
-
The Development of Fracture Networks by Shear: Experimental Results.By ev, Ze&apos Reches
The growth of networks of shear fractures is explored in a series of experiments with samples of wet clay. The samples are subjected to plane strain deformation in a rigid apparatus. The individual fr
Jan 1, 1986
-
Pipe Arch Horizontal Drift Method For Marta's Transit Extension Under 1-285By D. T. Iseley, A. L. Atta-alla
INTRODUCTION The extension project of the East Line Subway of Atlanta's subway network includes the construction of two single track transit tunnels under Interstate Highway 285. The project w
Jan 1, 1991
-
The Regeneration ProjectBy S. B. Hildebrand
One of the highest costs associated with insitu leaching of copper is electric power. The ReGeneration Project addressed this cost issue with a research and development project for BHP Copper. The pro
Jan 1, 1998
-
The Planning And Design Of The New 1000 M Haulage Level At LKAB MalmbergetBy A Pettersson
LKAB owns and operates two of the largest underground mines in the world in Northern Sweden. In Malmberget, with a production capacity of about 30,000 t/day of iron ore, the current main 815 m haulage
Jan 1, 1998
-
Minus 48 Mesh Refuse Disposal At Gary Central Coal Preparation PlantBy E. D. Hummer
During the planning phase of the fine coal cleaning addition at the Gary Coal Preparation Plant, careful consideration was directed toward the problem of minus 48 mesh refuse disposal. The plant flow
Jan 1, 1965