Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Concepts and Case Study for Regular Rhythmic Timing and Sequence

    By Neal Lee, Braden T. Lusk, Jhon Silva-Castro, Patrick J. Jenks

    "Timing and charge sequence are very important for optimized blast design. Traditional nonelectricinitiation systems have moved the industry toward a system of delays consisting of hole-to-hole androw

    Jan 1, 2016

  • ISEE
    Small Scale Testing to Investigate Air Blast Loading on Plates

    By H Ulrich Leiste, Leslie Talor

    This paper describes a series of small scale tests conducted to investigate the loading applied to a flat plate by the detonation of a cylindrical charge very close (between two and three charge radii

    Jan 1, 2009

  • ISEE
    Methods to Quantify Drilling Accuracy

    By Tristan Worsey, Nathan Rouse, Kyle Hall

    Drilling accuracy is the foundation to any successful blast operation. Even the best blasting practices cannot overcome poor drilling and still obtain desired results. Inaccuracies in boreholes can re

    Jan 1, 2018

  • ISEE
    It Felt like an Earthquake

    By David Ziegler, John Babcock, Gregory Poole

    On December 9, 2003 at 3:59 PM EST an earthquake with a 4.5 magnitude occurred in central Virginia. According to a survey on the US Geological Survey website, this quake was felt as far away as Bridge

    Jan 1, 2005

  • ISEE
    Explosive Compaction of Saturated Soils

    By Wayne A. Charlie

    An experimental test program being conducted at Colorado State University and involves the study of the behavior of water saturated sands under shock and explosive loadings. The study is being conduct

    Jan 1, 1991

  • ISEE
    Journal: Haz Mat 101, PART 1 - Hazardous Materials Shipping Papers and Emergency Response Information for Public Highway Transportation

    By Tom Snyder, John Brulia

    Part I is the first of a series of articles by the authors on hazardous materials (HM) transportation safety and compliance for shippers and carriers who offer and transport commercial explosives in c

    Jan 1, 2014

  • ISEE
    Environmental Impact Statement for Mining with Explosives: A Quantitative Method

    By Roberto Golchi

    This article describes the method used to quantify the Environmental Impact for the mining, by drilling and blasting, of a borrow pit for a gravity-dam. The affected environment was broken down into a

    Jan 1, 2003

  • ISEE
    Impact-Induced Fragmentation of Rock and Size Distribution Analysis

    By Bibhu Mohanty, Sheng Huang

    Accurate measure of fragment size distribution is a key objective in all blasting and crushing operations. Several generic distribution functions have been devised to describe the degree of fragmentat

    Jan 1, 2016

  • ISEE
    Field Application of Destructive Wave Interference

    By Kurt Oakes, Paul Worsey, Braden Lusk, Tony Brasier, Scott Crabtree, Randy Wheeler

    Theoretical description of destructive wave interference and the use of sacrifi cial holes is included and is supported by data collected at Springfi eld Underground. Finally, the process by which the

    Jan 1, 2008

  • ISEE
    Automation of Drill and Blast - Measurement Techniques to Develop Standard Procedures

    By Ewan Selers, Gary Cavanough

    Drilling automation technology is well advanced and automated drill rigs are in use at a number of operating mines. This is not the case for the other drill and blast processes due to significant tech

    Jan 1, 2016

  • ISEE
    Speedwave - A New, Multichannel, High Resolution, High-Speed Blast Monitor for Near and Far Field Monitoring Applications

    By Christopher Cloete Uys, Luis Manuel Poinha Valentim

    The purpose of this workshop is to describe and demonstrate the use of SPEEDWAVE, a high speed data recorder, its VOD enhancements, and the software which binds the system together. The system was des

    Jan 1, 1995

  • ISEE
    The Mechanisms of Rock Damage in Blasthole Open Stope Mining: Blast Induced Versus Stress Induced

    By Qian (Ken) Liu, Remi Proulx

    A large scale blast damage project was carried out over the past two years at INCO Ltd Manitoba Division co-funded by the Canada/Manitoba Mineral Development Agreement. The experiment was conducted at

    Jan 1, 1995

  • ISEE
    Vibrations from Seismic Exploration Blast

    By David Siskind

    The authors studied small seismic exploration blasts for vibration characteristics and effects on structures in Mexico. Obtained were 267 three-component recordings of ground vibrations and structure

    Jan 1, 2002

  • ISEE
    Electronic Tools for Borehole Inspection

    By Michael Olmsted

    Inspection of boreholes prior to blasting can result in cost reductions as well as increases in efficiency and safety. Until recently, borehole inspection was performed in two manners. For simple insp

    Jan 1, 2000

  • ISEE
    Demolition of the Milwaukee Railroad Trestle Pier, Lind, WA

    By William C. B. Gates

    Demolition blasting next to an active railroad can be very challenging because of track safety, blasting vibrations, potential track fouling by blast debris, and short work windows on a live track. Re

    Jan 1, 2016

  • ISEE
    Controlling Vibrations Caused by Underground Blasts in LKAB Malmberget Mine

    By Z X. Zhang

    Ground vibrations from the blasts of the LKAB mine at the Malmberget town had reached 18-19 mm/s from year 2000 to 2002. From 2004 to 2010 the maximum vibrations had been reduced to 9 mm/s and most vi

    Jan 1, 2012

  • ISEE
    Critical Blast Design Parameters for Construction Blasting

    By Tom Short

    "Construction blasting covers a very extensive variety of explosive applications. I will discussseveral of these with you and then show slides from my collection, starting in 1956, which will betteril

    Jan 1, 1991

  • ISEE
    Determination of Blast Vibration Limits by Direct Strain Measurement

    By Adrian Moore, Alan Richards, Andrew Brodbeck

    Structural blast vibration limits should be based on the strength of the structure, the stress induced by blasting, and a responsible factor of safety. In this paper a methodology that uses direct str

  • ISEE
    Burn Cut Pull Optimization through Varying Relief Hole Depths

    By Michael Allen, Paul Worsey

    In underground blasting, the pull of the initial cut is the limiting factor for the success of the rest of the round. By improving the pull of the first cut, a critical step is made towards improving

    Jan 1, 2015

  • ISEE
    AEL Ring 2000

    While ring-blasting techniques offer substantial benefits, there are intrinsic problems that are exacerbated when large blocks of ore are mined in attempts to improve the production economics. These p

    Jan 1, 2000