Dust Control in the Environment Using New Technologies and Blasting Techniques.By L. Muñoz, L. Steffen, W. Vilas
The emission of particulate material is one of the several parameters related to environmental control in mining operations near communities. Blasting is an event that generates and leaves a large amo
Jan 1, 2024
-
Bulk Loading of Emulsion Explosives in Shaft SinkingBy R J. Roach, D Roy
After months of discussion on ways and means to improve productivity in the shaft sinking process, it was decided to look at those areas where, historically, methods have been stagnant for many years.
Jan 1, 1997
-
Unusual Accidents Caused by ESDBy James G. Stuart
For precise control and timing of a blast, people use electric detonators. Most of these contain a fine metal “bridgewire,” that heats to the required burning temperature when electric current passes
Jan 1, 2005
-
Delay Timing and Vibration Characteristics at Low-Frequency Mine SitesBy D E. Siskind
The Bureau of Mines performed a comparative study of nine sites at eight surface coal mines to determine if the presence of near-surfaced underground abandoned workings resulted in the generation of a
Jan 1, 1990
-
Computer Aided Blasting System for Use with Electronic DetonatorsBy Dave Proudfoot, Mike van Wyk
"There has akvays been plenty of discussion around the ‘accuracy of pyrotechnic detonators withmost recognised manufacturers claiming a variability of arourid 1% or less for their ‘superaccurate’ pyro
Jan 1, 1998
-
Blast-Induced Rock Fracturing and Minimizing Downstream Comminution Energy ConsumptionBy Farshad Rashidi Nejad, Ali Asgari, Sanaz Norouzi
Blasting is known as the first step of rock breakage in mines. An indication of the importance of blasting is that more than 1 billion kg (2.2 billion lb) of explosives are used annually in Australia
Jan 1, 2015
-
Demolition of the ADMP-1 Jackup Platform for Aramco in the Arabain GulfBy J S. Brower
Disposing of the AMDP-1, Jackup drilling rig in the Arabian Gulf.
Jan 1, 1978
-
Hoover Dam ProjectBy Joe Strobbe, Kevin Joe
The U.S. Bureau of Reclamation awarded PCL Civil Constructors the project to build a new visitor's center and parking lot structure at the Hoover Dam. The excavations for these structures present many
Jan 1, 1993
-
Hole Cleaning Improvements through Tricone Bit Lug DesignBy Clarence Zink
Aside from the mechanical properties and process of actual rock breakage, rotary drill bit performance is affected by several “post breakage” items: cuttings size, flushing air pressure, flushing air
Jan 1, 2006
-
Progress in Studying Low Frequency Vibration Waves Caused by BlastingBy Eduardo Gonzalez Fernandez, Jaime Rios Vazquez
This report substantiates the connection that always exists between explosives and vibrations and draws attention to low frequency vibrations, which are the moat dangerous for the structures affected.
Jan 1, 1986
-
Improved Methods of Blasting Concrete for Welland Canal RehabilitationBy Ray Jambakhsh, Craig Copping
The St. Lawrence Seaway's Welland Canal has been undergoing a rehabilitation program that requires the removal of deteriorated concrete from the 25 meter high lock walls. Multi million dollar contract
Jan 1, 1994
-
Blast Design SoftwareBy Mark S. Stagg, Stephen A. Rholl
As part of its research program to evaluate efficient design criteria for improved blast fragmentation, the Bureau of Mines has developed two computer programs to facilitate data analysis. Results of
Jan 1, 1990
-
Blasting Over 40 Feet of Toe Burden - A Case Study to Outline Modern Planning TechniquesThe use of angled shot holes can be extremely effective in blasting faces that either have a great deal of toe burden or where it is difficult to give a drill access to a face due to backbreak and fac
Jan 1, 1994
-
Blasting with ANFO/Poylstyrene MixturesBy Karl Kure, Anders M. Heltzen
Mixtures of prilled ANFO and 0,5 - 3 mm polystyrene balls are interesting substitutes to the tube charges or other types of reduced explosives or detonation fuses. Experiments have shown detonation ab
Jan 1, 1980
-
Demolition of Reinforced Concrete Bridges during Reconstruction of the Motorway Zagreb-KrapinaBy Goran Cirkovic, Zvonimir Ester, Josip Krsnik
During the reconstruction of the motorway Zagreb-Krapina three reinforced concrete bridges were demolished, for their width was not adequate for the new motorway. Demolition of the three bridges was c
Jan 1, 1997
-
Engineering Considerations for Blasting at the Hanging Lake Tunnel Project, Glenwood Canyon, ColoradoBy Thomas R. Scotese, John L. Ackerman
The Hanging Lake Tunnel Project represents a major portion of the Glenwood Canyon Project, the last piece of Interstate 70 to be constructed. The project features twin bore, large span rock tunnels an
Jan 1, 1992
-
Application of Air Decking to Blasting - Finding from Numerical ModellingBy P. D. Katsabanish
Air decking applications are examined using numerical modelling and the AutodynTM code. The mechanism of damage is illustrated and discussed. Air decking is shown to provide advantages over stemming w
Jan 1, 2005
-
A Proposed Method for Remote Area Mass QuarryingBy Pat McLaughlin, J R. (Dick) Daniels
Current practice in establishing quarries in remote areas with hilly or mountainous terrain tends to the use of airtracs (or similar pioneering units) drilling horizontal holes to establish a face, fo
Jan 1, 1995
-
Millisecond Initiation for Narrow Reef Stoping in South Acrican Gold MinesBy J R. Brinkmann, S G. Giltner
Nearly all of the South African gold mining industry still uses fuse and igniter-cord initiation systems. Over the past 30 years numerous attempts at developing new initiation systems have not yielded
Jan 1, 1989
-
Adjusting Blasting to Increase SAG Mill Throughput at the Red Dog MineBy N. Paley
An engineering project was undertaken at the Cominco Alaska Red Dog Mine to determine the extent that Semi-Autogenous Grinding (SAG) mill throughput could be increased by blasting differently. The Jul