Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Determination of Seismic Velocity from Quarry Blasts Using GPS Enabled Vibration MonitorsBy William. J. Birch, Catherine. E. Johnson, Robert Farnfield
Rocks and other materials can be characterized by their elastic properties. However, seismic velocities represent a more practical set of physical properties for seismic methods. Seismic velocities de
Feb 6, 2023
-
Drill and Blast Trial Planning During Drill-Mill Optimization ProjectBy Tristan Worsey, John Henchion, Nathan Rouse, Yannick Lauras
"This paper presents an approach used to plan and evaluate drill and blast trials for a mine that currently mechanically excavates in-situ rock. The document presents the approach used to plan the tri
Jan 1, 2017
-
Generating Site Specific Blast Designs with State-of-the-Art Blast Monitoring Instrumentation and PC Based Analytical Techniques (da596259-c39e-4f49-b378-cc1a75a7ae1e)The common approach of designing blasts on a trial and error basis is quickly coming to an end. When utilizing the full scale blast environment, trial and error can quickly become cost prohibitive and
Jan 1, 1991
-
How to Control Blast Vibrations in an UrbanBy R E. Langston, S M. Gazioglu
A preconstruction inventory program was conducted to determine the existing conditions of residential, non-residential and all other structures within 2,000 feet of the blasting limits for a highway e
Jan 1, 1980
-
Measuring Blast Induced Damage by Applying the MASW Geophysical MethodBy Charles Zdazinsky
Many blasting applications in the mining industry demand that the hard rock being blasted remains structurally competent. For example, pre-splitting is a common technique to reduce fracturing, and ope
Jan 1, 2011
-
Blasting with a Light Touch; Florida State Project 12014-3501 Fort Myers, FloridaBy Doug Wathen, Philip M. E Thomas
The City of Fort Myers needed to replace a 40-year old 42-inch storm sewer line in downtown Fort Myers with a new 54-inch line to accommodate population growth. The old line had to be kept operational
Jan 1, 1996
-
The Use of Detonating Cord to Section Concrete Structures into Removable Size BlocksBy Donald H. Matthews
The usual method of dismantling massive concrete formations with explosives, is to totally demolish the entire concrete structure. If any portion of a concrete structure is required to remain in its o
Jan 1, 1978
-
Longer Delay Periods Reduce Rockfall Hazard at a Contour MineBy Virgil J. Stachura, Larry R. Fletcher
The Bureau of Mines conducted a series of delayed blasting experiments at a West Virginia contour coal mine which resulted in smoother highwalls. The highwalls were smoother due to reduced overbreak a
Jan 1, 1985
-
Dilution Control and Vibration Studies at an Underground MineBy B Mohanty, R Yang, M Leblanc
A total of 33 blasts in the pillar recovery program at INCO-Crean Hill has been investigated by means of an extensive set of diagnostic techniques. These included, borehole deviation measurements, sto
Jan 1, 1995
-
Deep Water Blasting on the River Nile in Southern EgyptBy Rob Grant, Manuel Lopez Cano, Mike Briggs, Ken Fletcher
The scorched desert sands and life giving waters of the River Nile in Egypt have been the back drop to awe inspiring engineering feats for over 4,700 years. The latest engineering marvel to grace the
Jan 1, 2004
-
Theoretical Evaluation of Blastcasting Technique in Strip Mining Multiple Phosphate RocksBy Salah A. Taqieddin
Blast casting or trajectory blasting, as it is sometimes called, is an innovative mining technique that has been receiving increasing acceptance among operations of surface coal mines and quarries as
Jan 1, 1997
-
Applying Wireless Initiation System to Reduce Personal Risk Exposure and Optimize Blasting Sequence and Operational Cycle TimeBy Alejandro Berrios, Matheus DaSilva, Erick Siqueira
Vazante mine is an underground polymetallic mine that produces zinc, lead, and silver, which belongs to Nexa Resources in Minas Gerais, Brazil. The mine, a sublevel stope underground mine, mainly appl
Jan 21, 2025
-
Modifying Blasting Parameters: Reducing Vibration while Maintaining Maximum Delay ChargeBy Blenda Lopes, Rodolfo Matias, Vagner Paixão, Vinicius Leão VALE, Edivarde Sousa
Seismography is an extremely important subject in the context of rock blasting, especially in the current scenario, which involves the need for increased controls due to the growth of urban areas near
Jan 26, 2026
-
Design and Construction of an Electric Oven to Determine the Detonation Temperature of the FulminantBy Alexander S. Escalante, Luis R. Ramirez, Nelson A. Arostegui
Research, analyze, discuss, design, and build an electric oven to perform one of the quality control tests the fanel or common fulminers to determine what temperatures they can detonate at. Give pract
Feb 1, 2020
-
Design Criteria for Sequential BlastingBy A B. Andrews
The use of sequential blasting techniques that combine surface and in-thehole delays has provided blasters with increased flexibility in blast design to promote good rock fragmentation and displacemen
Jan 1, 1981
-
Careful Blasting (125,000 cu.m) for a Shopping Centre in Downtown HelsinkiBy R Vuolio, B A. Jonsson
In the center of Helsinki - capital of Finland - extensive blasting operations were carried out during the years 1982 - 84. At the corner of the streets Mannerheimintie and Simonkatu - in the Forum bl
Jan 1, 1985
-
The Evolution of Mining and Explosives in the Powder River BasinBy Joseph W. Hejny, Marlyn G. King
Coal mining in the Powder River Basin has changed in recent years to accommodate the large quantity of coal produced. With strip ratios of one to one and up to three to one, extensive amounts of overb
Jan 1, 1994
-
The Application of GPS Positioning and Drill Monitoring TechnologyBy Carl Hendricks
AQUILA Mining Systems Ltd. is the world leader in drill monitoring, control and GPS based drill navigation systems for the mining industry. This paper will review the general design and application of
Jan 1, 2002
-
Calculation of Rock Motion During Bench BlastingBy Elaine Gorham-Bergeron
CAROM is a distinct element, dynamic code developed at Sandia National Laboratories to calculate the motion of rock fragments during blasting.[1] It has recently been improved to incorporate a mechani
Jan 1, 1987
-
"BLASPA" A Practical Blasting Optimization SystemBLASPA is the name for a computer code which can assist in the rapid optimisation of blasting procedures in an open-pit mine. BLASPA is based on a mathematical model of the blasting process, a model w
Jan 1, 1980