Use of Vibro-Replacement Stone Columns for Ground Improvement and Support of Mechanically Stabilized Earth (MSE) WallBy Pancho J. Garza, Keith H. Dahlen, Chris A. Labye
"Design for reconstruction of the East Flagstaff traffic interchange project located in Flagstaff, Arizona posed particular challenges. The proposed design included construction of a nearly 50-foot ta
Jan 1, 2015
-
Mobilised Shear Strength on the Failure Surface of 2D Belled Anchor Model Piles under Uplift in Cohesionless SoilBy Tanaya Deb, Sujit Kumar Pal
"Experimental investigations are carried out on failure pattern around 2D models of belled anchor piles in dry sand bed of density 15.60 kN/m3 under uplift. The models are having thickness ratio (Ts/T
Jan 1, 2015
-
Special Aspects of Constructions with Deep Mixing Systems for InfrastructuresBy Alexandra Weidle, Seffen Leppla, Rolf Katzenbach, Matthias Seip
"A lot of different deep mixing systems have been developed in the last decades for a wide spectrum of applications, e.g. retaining and foundations systems, soil improvement, sealing of toxic substanc
Jan 1, 2015
-
Use of Enhanced Pre-Mixed Self-Hardening Grout for an Emergency Cut-Off Wall Intervention in West AfricaBy Maurizio Siepi, Bruno Vingiani, Claudio Asioli
"The article describes an emergency rehabilitation intervention executed at Buyo Dam, in Ivory Coast, to intercept a significant water seepage occurring through the foundation of this zoned earthfill
Jan 1, 2016
-
Evaluating Lateral Bracing Code Requirements for Large Diameter FoundationsBy Jon Huff, Jeffrey Donville, Hannah Iezzoni, Dan Stevenson
Occasionally, in the design of deep foundations for a structure, a single deep foundation element may be used to support a building column. The most common type of element used in such cases is a dril
Sep 8, 2021
-
Selecting the Right Shoring System – San Francisco ExperienceBy Heinrich Majewski, Rob Jameson
"Careful review of site conditions and constraints is essential to select the appropriate shoring system for each project. Key evaluation criteria include the geotechnical profile, groundwater and env
Jan 1, 2017
-
A New Type Of Wave Equation Analysis ProgramBy Don C. Warrington
This paper describes a new wave equation analysis program called ZWAVE, which is a program specifically for external combustion hammers. The program is de-scribed in detail, the discussion dealing wit
Jan 1, 1988
-
Analysis of Laterally Loaded Free-Head Pile Groups in SandBy Ashraf M. Eid
Most research dealing with the problem of laterally loaded piles has been the response of individual piles subjected to lateral loads and/or bending moments. However, piles are seldom used individuall
Jan 1, 2005
-
DFI46 Panel on Foundation ReuseBy Andy Boeckmann
In early 2021, DFI formed a Foundation Reuse Task Force due to concurrent and coincidental discussions of this topic during meetings of the Subsurface Char- acterization for Deep Foundations and Test
Feb 1, 2022
-
Nailed It! The Great Wall of the Chinese Embassy (dbde4e01-35b2-40e7-b641-e07610069e96)By Fred Tarquinio, Giovanni Bonita, Lars Wagner
"A new embassy for the Peoples Republic of China is under construction in Washington, DC. The 475,000 square feet (44,125 m2) structure has five levels below ground and four above, making it the large
Jan 1, 2007
-
Driven Piles In Central Texas Expansive SoilsBy Clayton A. Signor
Abstract: Expansive soils cause more damage to structures annually than a combination of other major natural disasters. Because of the cost to our society, all means and methods need to be fully expl
-
Unified Design Of Piles And Pile Groups Considering Capacity, Settlement, And Negative Skin Friction - 1. IntroductionBy Bengt H. Fellenius
It is a truism that in the design of pile foundations one must consider both capacity and settlement. As to capacity, most basic text books contain simple methods of design of capacity of single pile.
Jan 1, 1991
-
Innovative Driven Pile Solution for the Rhode Island Route 6/10 Interchange ProjectBy Seth H. Hamblin, Leo J. Hart, John E. Regan
The Route 6 /10 10 Interchange Design/Build project, located in Providence, Rhode Island, involves the design and construction of five (5) new elevated bridge structures to replace and reconfigure the
Jan 1, 2019
-
Errata - Performance Of A Large Diameter Drilled PierBy A. J. Partos
Table 4, Page 311 Table 4 Experimental Parameters from Straight Line Interpretation of Mohr Failure Envelope [ ]
Jan 1, 1991
-
-
Foundation Behaviour Of A Large HS-Train Viaduct After 4 Years' OperationBy Michel Bustamante
The Arbre viaduct, 200 metres long, is the most important structure on the Belgian portion of the High Speed Train line between Paris and Brussels. The particular geotechnical conditions of the soil w
Jan 1, 2002
-
Analytically Modelling Dst Arrival Time Databases With High Order Polynomials For Optimal High Resolution ImagingBy Gerald Verbeek, Erick Baziw
Downhole Seismic Testing (DST) is an extensively utilized geotechnical tool for site characterization. DST provides low strain (<10-5) in-situ interval shear and compression wave velocity estimates. T
Oct 1, 2022
-
The Historical Evolution Of Piling And Deep Foundations And Prospects For The Future.By W. G. K. Fleming
The general history of piling is traced up to the present time with regard to the evolution of methods and materials. The processes have been strongly influenced by developments in basic equipment and
Jan 1, 1999
-
Standard Testing Method for Deflection Characteristics of Pile Driving Cushion MaterialBy David M. Rempe
The purpose of this standard is to provide a method for testing of cushion materials that leads to uniform results when employed by various organizations and laboratories. The load-deflection charact
Dec 1, 1984
-
Construction of Cooling Water Intake Shafts for the Oak Creek Expansion Project, Oak Creek, WisconsinBy Edward Jacobsen
The Oak Creek Power Plant in Oak Creek, Wisconsin is currently undertaking an expansion project. In order to supply cooling water to this facility, a 27' (8.2m) diameter tunnel will be bored, in
May 11, 2007