    Use of Porous Concrete in Secant Bored Pile Walls

    By Matthias Pulsfort, Markus Herten, Rolf Breitenbücher, Claudia Fierenkothen

    "Secant bored pile walls are frequently used as retaining walls in watertight excavations to cut off ground water aquifers and are subsequently exposed to ground water pressure loading in addition to

    Jan 1, 2017

  • DFI
    Unusual Dolphin Monopile Structure

    By C. T. Christensen

    The paper gives an outline of the design, installation and performance of a series of mooring and berthing dolphins for a major ferry berth outside the port of Elsinore, Denmark. The Dolphins are larg

    Jan 1, 1989

  • DFI
    CPT - Guided Installation Of Pressure-Grouted Displacement Piles

    By Mark M. Petersen

    As part of the addition of eight new combined cycle generating units at the Florida Power & Light Sanford Plant, 2,129 piles were to be installed. The existing plant elements were supported on driven

    Jan 1, 2002

  • DFI
    Case History: Foundations For The New Mississippi River Bridge, St. Louis

    By Paul J. Axtell

    This case history describes the foundation design and construction for the New Mississippi River Bridge, presently under construction in St. Louis, Missouri. The 1,500 ft (457.2 m) main span of the c

    Jan 1, 2011

  • DFI
    The Effectiveness Of The Monotube Pile Taper At The Highway 280 Pile Uplift Test Site ? Introduction

    By Samuel J. Kosa

    The Monotube is a uniformly tapered high-strength steel shell pile manufactured for friction pile applications. The Monotube pile was developed in the early 1920's in Canton, Ohio. Its first comm

    Jan 1, 1993

  • DFI
    Deep Soil Mixed Wall And Jet Grouting For An Excavation Support System At The Museum Of Fine Arts In Boston, Massachusetts

    By Harry Schnabel

    A 6200 m² cement deep soil mixed (CDSM) wall was constructed for an addition to the Museum of Fine Arts in Boston, Massachusetts. The addition was located along the east side of the existing museum wi

    Jan 1, 2011

  • DFI
    Lateral Load Test on Piles with Large Free Stand

    By P. V. Chandramohan

    "In ports, piled berths are designed and constructed for berthing of ships with a finite draught. Piles in a bridge foundation also have a large free stand above scoured level. The piles of these stru

    Jan 1, 2015

  • DFI
    Overview of Design and Practice of SDS Piles in China

    By Gang Guo, Zhong Liu, Yi Zhang, Jingchun Lu

    "Abstract Application of soil displacement screw pile (known as SDS pile) has been experiencing accelerated growth in Chinese deep foundation industry because of its technical advantages, environmenta

    Jan 1, 2014

  • DFI
    Geotechnical Investigation For Deep Foundation Projects In Shanghai Area ? Synopsis

    By E. R. Wang

    This paper outlines the engineering properties of shallow soil in Shanghai area. The main points that should be paid attention to during deep foundation investigation, and general conditions of experi

    Jan 1, 2010

  • DFI
    A Case Study Supporting The Need For A Rational Method For Design And Installation Of Vibratory Driven Piles

    By Franklin M. Grynkewicz

    The subject of bearing pile performance installed by vibratory hammers has been a matter of increasing study and continued controversy. A recent case study from a major bridge replacement project is d

    Jan 1, 1991

  • DFI
    Positive Cut-Off Wall in Indian Dam – A New Technique for Difficult Geology

    By Steni Stefani, Sanjay Dave

    "This paper describes an innovative method, used for the first time in India, for the construction of a 1.0metre-thick positive plastic concrete cut-off wall (CoW) at the upstream toe of the dam at th

    Jan 1, 2017

  • DFI
    Full-Scale Field-Test Studies On Driveability And Induced Ground Vibrations Of Vibratory Driven Sheet Piles

    By K. Viking

    The vibratory characteristics of full-scale sheet piles, vibratory driven into the ground, have so far not been described systematically in detail. This paper concerns the preliminary results of a ser

    Jan 1, 2000

  • DFI
    High Capacity Piles In The Hamilton Bayfront Area

    By C. D. Thompson

    Pile load test programs were carried out in 1984 and 1985 at Stelco's and Dofasco's Steel Making Plants in the Hamilton Bayfront area. 323.9 mm outside diameter by 9.5 mm wall thickness Grad

    Jan 1, 1987

  • DFI
    Embankment Piles ? Introduction

    By B. B. Broms

    Embankment piles are common in the Scandinavian countries (Kjellman, 1940) and in Southeast Asia as support of fills, light structures, bridge abutments and deep excavations (Eide, 1968) as described

    Jan 1, 2010

  • DFI
    List Of Exhibitors

    A technical exhibition was held in conjunction with the 4th DFI International Conference on Piling and Deep Foundations, Stresa. The exhibition was located in the ground floor of the Conference Hall.

    Jan 1, 1994

  • DFI
    On The Effects Of Sand Grading On Driven Pile Performance

    Precast prestressed concrete piles designed to be end-bearing in a sand stratum at Drax Power Station met with extremely variable resistance during driving. Some piles came to virtual refusal almost i

    Jan 1, 1989

  • DFI
    Pile Load Tests

    Case I- Timber Pile Test- 4 pages describe the pile driving record, the pile load test and the boring log. Case II- 24 inch square prestressed concrete pile-5 pages give details about the pile dri

    Jan 1, 1988

  • DFI
    Once Again, Engineering And Contractor Tenacity Overcome Tough Geology

    By John E. Lens

    How much trouble can narrow vertical fissures in bedrock cause on a shallow bedrock site? Enough trouble so end-bearing H-piles range between 8 and 100 feet long in a single pile cap and tiebacks ran

    Jan 1, 2006

  • DFI
    Offshore Wind Turbine Foundations - In Denmark And Belgium - Introduction

    By Jørn H. Thomsen

    This paper presents the experience gained and the lessons learned over the last decade within the numerous offshore foundation projects undertaken in the offshore waters of Denmark and Belgium by COWI

    Jan 1, 2013

  • DFI
    Pile Load Test On 1200 Mm Dia Pile In Cemented Soil - Synopsis:

    By B. Ramanathan

    The results of a pile load test on a 1200 mm dia and 25 m long bored Cast-in-situ pile in soft rock is reported. The subsoil has a high N value of above 60 from 7 m to 21 m. The soft rock was observed