Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Environmental Considerations For Foundation Construction In The Boston Area - The New MCPBy James V. Errico
On October 1, 1993 the regulations for assessing and cleaning up contaminated soil and groundwater in the Commonwealth of Massachusetts were revised. These new regulations, known as the Massachusetts
Jan 1, 1994
-
Reducing Construction Interference when Implementing Geotechnical Instrumentation and Monitoring in Urban Excavation ProjectsBy Martin B. Hudson, Daniel Brescia, Zhangwei Ning
Due to the complexity and sensitivity of surrounding environments, instrumentation and monitoring (I&M) is critical for many urban deep excavations. The objects to be monitored include shoring bulkhea
Jan 1, 2018
-
Displacement And Pore Pressure Monitoring During Installation Of Drilled Displacement PilesBy Lisa M. Splitter
Drilled displacement piles were constructed as the foundation for a proposed 10-story building in San Francisco, California. At the study location, the stratigraphy consists of 14 to 21 feet of fill
Jan 1, 2009
-
Micropile-Supported Wall To Resist Lateral Deflection Of Existing Railroad Bridge AbutmentBy Samer R. Rabab?ah
As part of the PHX Sky TrainTM project at Phoenix Sky Harbor International Airport in Phoenix, Arizona, the existing traffic lanes at the 44th Street underpass below the Union Pacific Railroad (UPRR)
Jan 1, 2011
-
Classical And Finite Difference Method To Estimate Pile Capacity Compared With Pile Load Testing ResultsBy Yogesh Prashar
Three conventional uplift tests and 12 Rapid Pile Load Tests (RLT) were performed on total of fifteen 16-inch square pre-cast concrete driven piles at a test site in Emeryville California in December
Jan 1, 2002
-
Continuous Flight Auger Piles In The Blue Ridge: A Case Study Using Instrumentation In Pile DesignBy Jesse R. Jacobson
A large casino complex in Cherokee, North Carolina recently underwent a $633 million expansion that involved substantial foundation challenges. The site is located in a valley on the southern edge of
Jan 1, 2011
-
Tunnel Headwall Softeyes: Fiberglass Design Applications and Constructability ChallengesBy Shawna Munn, Jakub Hudler
This paper outlines the use of tunneling headwall softeyes for transit construction projects in the Greater Toronto Area (GTA) over the past decade. Due to spatial constraints, tunnel boring machines
Jan 1, 2018
-
Minipiles In Soft Marine Deposits Rescue Sinking WarehouseBy Bruno Gemmi
A new warehouse built with prefabricated components over an area underlined by soft marine soil deposits started showing differential settlements well before its completion. Its 103 spread footings c
Jan 1, 2011
-
Insight to Foundation Construction of Extradosed - 3rd Narmada Bridge over River Narmada, Bharuch, GujaratBy Ekhlaq A. Khan
"The new third Bridge over Narmada River at Bharuch which was recently completed is characterized by some aesthetically appealing elevations of the pylon and large size of the deck. This paper gives a
Jan 1, 2017
-
St Clair River Rail Tunnel, Sarnia Evolution Of The Design And Construction Methods For The TBM Cutterhead RetrievalBy Peter McDonald
In 1994 the world's largest underwater tunnel was constructed to link Canada and the U.S.A. This new tunnel was large enough to accommodate double-decker railway cars. The construction of an unpl
Jan 1, 1997
-
Piled Raft On Layered SoilsBy Luca de Sanctis
The analysis of piled raft foundations in layered soils may be performed by 3D finite elements or by approximate procedures. Among the latter, the code NAPRA (Russo, 1998) is based on the method of th
Jan 1, 2002
-
Large Diameter CIDH Construction In Cohesionless Soils By The Use Of Rotator/Ocsillator Techniques: A Case Study - 116th Avenue Bridge Over The Gila River Phoenix, Az.By M. Cornelius
Drilled shaft construction through caving soils has historically been an uncertain, risky and costly operation. Uncertain, because the zone of caving may or may not be known, risky because the loss of
Jan 1, 1999
-
Design-Build Support Of Excavation For Block 76, Salt Lake City, UtahBy Rick Deschamps
The Block 76 project includes the demolition and redevelopment of an entire city block for mixed use retail, office and residential properties directly adjacent to Historic Temple Square in Salt Lake
Jan 1, 2009
-
High Capacity Drilled Cast-In-Place Piles, House Of Representatives Building, Lansing, Michigan - SummaryBy Robert C. Rabeler
Soil and Materials Engineers, Inc. (SME) has utilized drilled cast-in-place (D-CIP) piles on a number of projects in the midwest. These foundation systems have typically consisted of drilling an 8 to
Jan 1, 1999
-
Design And Preliminary Investigations For Deep Foundations Of The Charleroi Locks River Wall Project, Monessen, PennsylvaniaBy Brian H. Greene
The U.S. Army Corps of Engineers, Pittsburgh District, is in the final phases of modernizing the locks and dams on the Monongahela River. One facet of this modernization is to replace the existing Lo
Jan 1, 2006
-
A Brand New Barrier Wall Installed at Wolf Creek DamBy Maurizio Siepi, Fabio Santillan, Lyndon Bedford, Carlo Crippa
"Abstract: Wolf Creek dam, on the Cumberland River in Kentucky, US, operated and maintained by the Nashville District of the USACE, is the Corps' largest reservoir east of the Mississippi river. The 1
Jan 1, 2014
-
-
Guide to Drafting a Specification for High Capacity Drilled and Grouted Micropiles for Structural SupportBy Donald Bruce
The three types of specifications which are used for micropile work are: ? Performance Specifications: The contractor is permitted control over certain design and/or construction procedures but must
Jan 1, 2004
-
Guide to Drafting a Specification for Micropiles (XXII International Mineral Processing Congress)By Joint Micropiles Committee
"The three types of specifications which are used for micropile work are: • Performance Specifications: The contractor is permitted control over certain design and/or construction procedures but must
Jan 1, 2004
-
Levee Rehabilitation, Lower Wood River Phase II– East Alton IL. Deep Cutoff WallBy Gene Bryant, Wesley Schmutzler, Matteo Bertoni
The levees where the Mississippi River and the Lower Wood River meet near East Alton Illinois have been a problem area for years due to underseepage. The first phase of the deep cutoff wall was a 2,00
Jan 1, 2019