Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Session 8 " Jet Grouting and Deep Mixing"
By Masaki Kitazume
Five papers were presented orally to the topics of Jet Grouting and Deep Mixing. The session was started with a brief introduction by the moderators. Following the oral presentation, floor discussions
Feb 10, 2003
-
Comparison Between Statnamic And Static Load Testing Of Drilled Shafts In Varved Clay
By Carl Ealy
Static and STATNAMIC (STN) rapid load test (RLT) was performed on 3-drilled shafts. The purpose of the RLT part of the study was to obtain data in support of FHWA research on innovative load testing m
Jan 1, 2002
-
Research on Strength Characteristics of Cement-Treated Soils at Construction Joints
By Naoyuki Hanawa, Takeo Asanuma, Tatsuo Nagatsu, Sachihiko Tokunaga, Daisuke Nakagawa, Yoshiyuki Morikawa, Kazuhiko Ueno
"In the cement deep mixing (CDM) method, one approach to joint construction is creating a surface-contact joint. In this study, an unconsolidated-undrained triaxial compression test was performed on c
Jan 1, 2015
-
Design, Construction And Applications Of Auger Piling System For Earth Retention And Underpinning Of Structures
By A. A. Gupte
Auger piling system which was developed in the United States in the 1940's is gaining acceptance in many parts of the world. Although primarily used to support foundations, the system is very use
Jan 1, 1989
-
Founded on Creativity North Dakota’s Four Bears Bridge
By Terrence R. Udland, Russell D. Call
"Honored with a DFI 2006 Special Recognition Award, the Four Bears Bridge was constructed across Lake Sakakawea and opened to traffi c in September 2005. The very large lake size and severe winter con
Jan 1, 2007
-
Design Of An Unbraced Elliptical Slurry Wall Cofferdam For Deep Pump Station Construction
By Gordon Chen
As part of a value engineering envisioned by East Coast Slurry, Weidlinger Associates, Inc. designed a unique elliptical slurry wall cofferdam for construction of the 65 ft. deep MWRA North Dorchester
Jan 1, 2010
-
Analysis Of Vibratory Driven Pile ? Introduction
By Sherrill Gardner
Vibratory drivers have been used since the 1930s to drive and extract piles. Vibratory pile drivers have the capability of significantly decreasing pile installation time, especially in granular type
Jan 1, 1987
-
Guidelines For Selection Of Parameters For Design Of Caisson Foundations For Certain Conditions. - Synopsis
By Dinesh R. Katti
Caissons which are locally known as well foundations, which may very in diameter from 30 m to more than 30 m and in majority of the cases having depth to diameter ratio between 1 to 1.5, are normally
Jan 1, 1996
-
Analysis and Behavior of Double Sheet Pile Cofferdam
By Kamil Nuzha, Jianchao Li, Bashar S. Qubain
"The Philadelphia Water Department is rehabilitating Belmont Raw Water Basin. As part of this work, a 500-ft long, temporary cofferdam was designed to retain 35 ft of combined water and soil at the we
Jan 1, 2016
-
Stabilization of an Existing Cellular Tower Foundation by Installing Jet Grouted Piles
By David T. Farber
"Stabilization of an existing cellular tower foundation system without dismantling the tower or compromising the existing foundation system was accomplished by installation of a jet grouted pile syste
Jan 1, 2005
-
Integrity Evaluation Of Driven Concrete Piles Utilizing Embedded Data Collectors
By Donald T. Robertson
This paper presents case histories of driven concrete pile damage detected with dynamic testing methods utilizing strain gages and accelerometers embedded in the pile at the prestressing yard during p
-
Innovative SSP Design and Construction for a Complex Soil Remediation Project
By Matthew C. Janes, Mark C. Spence
"A former coal gasification site next to Rock Bay in Victoria, BC, Canada required a barrier to permit dewatering and excavation of the bay and surrounding property. The adjacent property owners had s
Jan 1, 2016
-
Integrity Evaluation of Driven Concrete Piles Utilizing Embedded Data Collectors (ac1e1b32-2f59-488d-aca4-5ee1b43eb226)
By Donald T. Robertson, Kurt Hecht, Michael K. Muchard
"This paper presents case histories of driven concrete pile damage detected with dynamic testing methods utilizing strain gages and accelerometers embedded in the pile at the prestressing yard during
Jan 1, 2017
-
Non-Destructive Testing Methods for Drilled Shaft and ACIP Piles (34748882-cb96-4081-9967-58c48901bc15)
By George Piscsalko
"Quality control of drilled shafts and ACIP piles is greatly dependent upon the practices of the site personnel. In many applications it is difficult to properly inspect the shaft prior to concreting,
Jan 1, 2017
-
Micropiles Take Off at Dulles Airport
By Eric Rehwoldt, Walt Rabe, Jesús Gómez, Tim Myers
"An expansion plan for Washington Dulles International Airport is currently underway to prepare for growth at this northern Virginia facility in the future. While Dulles currently serves more than 20
Jan 1, 2009
-
A Numerical Study On The Lateral Resistance Of Steel-Concrete Composite Drilled Shafts For Long-Span Bridges
By Juhyung Lee
Recently, large diameter drilled shafts are often used for foundations of large-scale marine bridges with high capacity and required to resist lateral loads. Steel casings are essential in supporting
Jan 1, 2008
-
Restoration Of Railway Embankment – A Case Study
By Prodyot Kumar Ray, Sudip Kumar Koley, Aminul Islam, Somnath Banerjee
One of the most important topics in the construction industry is the building of railway embankments. Being such a delicate and significant structure, it is crucial to properly design the embankment a
Sep 1, 2022
-
Practical Construction Considerations for Runway Extension and Taxiway Expansion over Soft/Organic Soil Using a Column Supported Load Transfer Platform
By Brian T. Nereson, Michael C. Penney
"This technical paper was prepared to describe the general process by which the authors designed a column-supported load transfer platform (LTP) for support of asphalt-paved runway and taxiway embankm
Jan 1, 2016
-
Replacement Bored Piles for the Houphouet-Boigny Bridge, Cote D'ivoire
By Adrian Mercer, Ashkan Ameri
Due to general degradation, increased traffic levels, and historical ground movement, this road and rail bridge which provides an essential link between the interior of the country and the Port of Abi
Sep 8, 2021
-
S21-Berlin – Design And Underwater Construction Of A Covered Contrustion Pit Without Direct Accessibility From Above
By Grischa Dette, Thomas Schröder, Holger Merski
For the construction of the tunnel for the new Berlin S21 light rail line, a construction pit had to be built below the crossing B 96 federal road. For this purpose, the construction pit M’ has been b
May 1, 2022