Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Organizing For Maintenance

    By Douglas A. Sloan

    "Shutdowns and breakdowns that halt the process-flow of mine production are costly. Skilled maintenance tradesmen are scarce and expensive. The cost of maintenance or of production Joss from Jack of m

    Jan 1, 1970

  • CIM
    Recent Closure Data Re-writes the Chapter on Load Transfer Around Mine Openings in Deep Potash Mines

    By A. Dave Mackintosh

    Historical closure data has provided a description of the stress distribution patterns occurring around mine openings and enabled the development of a time ? distance plot predicting the location of t

    May 1, 2001

  • CIM
    Mine Dewatering Performance Improvement with Reduced GHG Footprint—Encased Electric Submersible Pump System

    By Agbo Chima

    Low-lying sections of open-pit mines accumulate water, especially during the rainy seasons, preventing access to resource-bearing areas. To sustain mining operations, the water must be lifted out of t

    Jan 1, 2023

  • CIM
    Ore Problems and the Microscope

    By W. L. Uglow

    In recent years, the microscope has come to be recognized as a valuable aid to engineers whose business is the discovery, development, concentration or reduction of metallic ores. In many of the large

    Jan 1, 1924

  • CIM
    Total Quality Management and Control Quality for Reliability

    By Paul A. Glapa

    Quality is much more than providing a product that functions properly. True quality is a way of thinking, a way of doing business, and, ultimately, a way of satisfying a customer?s long-term needs. A

    May 1, 2003

  • CIM
    Prepaid Medical Care for Employees of the Hollinger Mine

    By R. P. Smith

    PRIOR to June, 1937, the employees of Hollinger Consolidated Gold Mines, Ltd., at Timmins, Ontario, received medical care for themselves under a contract system developed through an agreement between

    Jan 1, 1943

  • CIM
    Abandoned but not Forgotten - The Recent History of Copper Hydrometallurgy

    By F. Habashi

    In the period 1970-1995, a number of hydro metallurgical processes to treat copper concentrates to overcome the pollution problem due to S02 emission in smelters were developed. Pilot and commercial s

    Jan 1, 2007

  • CIM
    Low Temperature Oxidation of CO and Hydrocarbons over Supported Gold Catalysts

    By Renaud Cousin

    Supported gold catalysts were prepared by Direct Anionic Exchange on an alumina support and tested during the reaction of CO oxidation and of saturated and unsaturated hydrocarbons (C1 to C3). The cat

    Oct 1, 2003

  • CIM
    Single Stage SAG/AG Milling Design (8f4dab33-2960-4942-b1dc-b2668e0eb796)

    By Brian Putland, Fred Kock, Leigh Siddall

    Single stage semi-autogenous / autogenous (S/AG) milling has become a common design for a variety of ore types with the advantages of being comparatively low capital cost and flexible for future expan

    Jan 1, 2012

  • CIM
    Zen and the Art of Specification Writing (77d7cb41-bec5-4fd5-adc0-f77765b61b69)

    By R. A. Nemchek

    Over the years, concentrator plant design has evolved from a large number of small grinding mills to a small number of large mills. In many cases, all of the tonnage runs through a single mill (typica

    Jan 1, 2012

  • CIM
    Sustainable Mining and the Green Mining Initiative

    By Louise Laverdure

    The Canadian mining sector has to be innovative and invest in the development of sustainable mining technologies to maintain its international leadership. Natural Resources Canada (NRCan) collaborated

    May 1, 2011

  • CIM
    Coordination Polymers with Cyanoaurate Building Blocks: Structures, Physical Properties and Applications

    By Daniel B. Leznoff

    The cyanoaurate anions [Au(CN)2]- and [Au(CN)4]- are shown to be useful building blocks for synthesizing supramolecular coordination polymers. For the gold(I) unit, aurophilic interactions often incre

    Oct 1, 2003

  • CIM
    Oxidation characteristics of the third generation superalloy CMSX-10

    By R. C. Reed, A. Akhtar

    Oxidation of the third generation cast single crystal, nickel-base superalloy CMSX-10 is examined using isothermal tests at 900°C and 1000°C for times ranging from 20 hours to 100 hours. X-ray diffrac

    Jan 1, 2004

  • CIM
    Ore Reserves - The Four CS (a7ae3a89-7579-4c05-a8da-57a4d0a04699)

    By Owen Owens, W. P. Armstrong

    The process of arriving at the size and grade of: (a) a newly-discovered body of mineralization, (b) a potential ore resource, (c) an orebody proposed for mining, or (d) the ore reserves in a mine, re

    Jan 1, 1993

  • CIM
    Equity Pricing in the Mining Sector: CAPM and APT Evidence

    By J. L. Casado-Sánchez

    Financial capital is highly volatile and if the investor does not get adequate compensation for the risk faced he may consider withdrawing his capital assets from the company and consequently produce

    Aug 1, 2013

  • CIM
    Customising Copper-Iron Selectivity Using Modified Aldoxime Extractants: Pilot-Plant Evaluation

    By K. C. Sole

    In most copper solvent-extraction operations, an important consideration in choice of extractant is the requirement for high selectivity of copper over iron. Ester-modified aldoxime extractants presen

    Jan 1, 2007

  • CIM
    Preparation of Hydraulic Sand and Cement Backfill at Noranda Mines Limited (Geco Division)

    By C. Barnett

    "A description of the Geco orebody has been given by W .L. Brown and R.C.E. Bray (1). The mill flowsheet and equipment were described by M.J.S. Bennett, D. Wild and C. Lawton (2). Mill capacity is now

    Jan 1, 1968

  • CIM
    Optimizing the Operational Strategy of a Mine-metallurgy or Quarry-cement Works Complex

    By Pierre Gy

    "Abstract - This paper deals with industrial complexes such as: (1) a mine producing metal-bearing ore and a furnace(s)/converter(s) where the ore is melted into metal, either directly, or after a min

    Jan 1, 1998

  • CIM
    Optimization and improvements in Dofasco's 165 MT EAF ladle design

    By S. Sagar

    In September 1996, Dofasco commissioned a 165 Mt twin shell EAF furnace and an associated ladle fleet. During and after this startup, refractory performance in the ladles was optimized on a holistic a

    Jan 1, 2004

  • CIM
    An Exploration Application for Lead Isotope Ratios, Stewart Mining Camp, Northwestern British Columbia

    By Dani J. Alldrick, Alastair J. Sinclair, Colin I. Godwin

    "The Stewart mining camp has a long history of precious and base metal mining. The camp is abundantly mineralized, with more than 200 widespread, varied, vein prospects, deposits and orebodies. These

    Jan 1, 1993