Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Numerical Analysis of the Early Response of Paste Backfill in a Vertical Stope

    By N. E. Mkadmi

    Backfilling increases the stability of underground stopes and may help reduce the environmental footprint from the mining operation. The barricades holding the backfill in place must be designed to pr

    May 1, 2011

  • CIM
    In situ testing in underground backfilled stopes

    By Malcolm Scoble, Jean-Marc Robert, Luciano Piciacchia

    "An approach to the in situ testing of mine backfills is outlined. It has been developed to provide a measure of the effective strength and stiffness of such materials after placement in stopes. This

    Jan 1, 1987

  • CIM
    Towards a Worldwide Network of Education in Mineral Engineering

    By Hans de Ruiter

    "Delft University of Technology, RWTH Aachen, Helsinki University of Technology and Imperial College established the Federation of European Mineral Programs (FEMP) in 1999 as a legal body to coordinat

    Jan 1, 2004

  • CIM
    Requirements for Underground Mine Backfill Monitoring

    By David O. DeGagné

    While mine backfill plants are becoming increasingly more automated and instrumented, especially with paste fill operations, underground backfill distribution systems have hardly changed over the year

    May 1, 2001

  • CIM
    International Commission On Large Dams (ICOLD)

    By Yves Gratton

    The International Commission on Large Dams (ICOLD) is a non-governmental International Organization which provides a forum for the exchange of knowledge and experience in dam engineering. It is the wo

    May 1, 2002

  • CIM
    Innovative Technologies for Copper Smelting and Electric Slag Cleaning and Matte Settling Furnaces

    By A. Esterhuizen, S. Essack, H. Joubert, N. Fowler

    Tenova Pyromet has developed innovative technologies for copper smelting and electric slag cleaning furnaces. Based on client feedback and requirements, innovative designs have been developed to addre

    Jan 1, 2019

  • CIM
    Mining the Retreat Zone Between Two Converging Pyramids at Noranda?s Bell-Allard Mine

    By Véronique Falmagne

    The mining sequence at Noranda?s Bell-Allard mine calls for two mining fronts retreating toward a central pillar known as the Retreat Zone between pyramids A and C. It is clear from numerical modeling

    May 1, 2003

  • CIM
    Remarks Deposits ? on Some Sulphide Volcanic Extrusivest

    By G G. Suffel

    T HESE remarks on the occurrence of strata-bound massive sulphide deposits are submitted be-cause the writer recently visited the principal Cyprus deposits (in January, 1965) and has also a back-groun

    Jan 1, 1965

  • CIM
    The Upgrading of Primary Gold Gravity Concentrates

    By Bryn Harris, Liming Huang, Andre Laplante

    "This paper reviews flowsheets generally used in gold rooms to upgrade primary gravity concentrates particularly those of Knelsons. It is concluded that even for small operations, which treat between

    Jan 1, 1999

  • CIM
    Case Study of Thickened Tailings at Goldcorp’s Musselwhite Mine in Northern Ontario

    By Jérôme Girard, Shiu Kam, Sue Longo

    "Historically, tailings management in a northern climate has involved the deposition of tailings into the Tailings Management Area (TMA) as conventional slurry. This type of system is obviously viable

    Jan 1, 2011

  • CIM
    Shield-Data-Based Horizon Control for Longwall Shearer Guidance

    By M. Holm

    Coal is an important fuel for energy generation, and since there are no adequate alternatives it will also be for the next decades. The deep lying hard coal is important in particular because of its h

    Aug 1, 2013

  • CIM
    Difficult Mining Conditions in 153 Orebody at a Depth of 4550 ft at Vale Inco?s Coleman Mine

    Vale Inco?s Coleman Mine 153 Orebody is a narrow vein deposit with a dip that varies from 30 to 70 degrees. It has a strike length of 1200-feet and the current mining extends from the 4250 level to 51

    May 1, 2009

  • CIM
    Grinding Circuit Final Grind Control at Agnico Eagle Meadowbank Mine

    By Pathies Nawej Muteb, Tom Strombotne, Karl Leetmaa, Irma Gabric, Keith Darby

    "Continuous control of the final grinding product size is important to optimize gold liberation for Gold Milling operations. At Meadowbank Mine an on-line Particle Size Monitor has been employed succe

    Jan 1, 2017

  • CIM
    Ore pass database: Quebec underground metal mines

    By J. -F. Lessard

    Most underground mines rely on ore pass systems to ensure the transport of ore and waste. The design and operation of ore pass systems often rely on past experience, which is often anecdotal and at ti

    Jan 1, 2006

  • CIM
    Towards a Better Understanding of Stirred Milling Technologies - Estimating Power Consumption and Energy Use

    By Jonathan Allen, Peter Radziszewski

    "Stirred mill technology dates back to 1928 where the idea to use “an agitator and spherical grinding media” was presented. The year 1948 saw the successful application of DuPont’s “sand mill” for pig

    Jan 1, 2014

  • CIM
    Turnagain Nickel Project: Playing a Key Role in the Development of Northwestern BC

    By Ed Beswick

    Resource Update Drilling Program ? Pre-feasibility ? Exploration Metallurgy Program ? Grindability ? Metallurgical Optimization ? Hydrometallurgical Options Preliminary Mine Development Design

    May 1, 2008

  • CIM
    Red Lake Gold Mine Autoclave Optimization Project

    By K. K. Murray, D. G. Gelderland

    "The pressure oxidation autoclave at the Goldcorp’s Red Lake Gold Mines (RLGM) was commissioned in 1991. Since commissioning, the circuit has been well maintained and its capacity increased to mechani

    Jan 1, 2017

  • CIM
    A New Potential Standard in Monitoring and Optimizing Deposit Control in Mining Process Waters

    By W. J. González

    "With the increasing demand for minerals, technologies to maximize mineral recovery are paramount to a mine’s economic success. Many mining process waters have the potential to form calcium-based inor

    Jan 1, 2014

  • CIM
    Case Studies with the Falcon Concentrator

    By G. Naud, J. Robitaille, M. Buonvino, A. Veltmeyer, A. R. Laplante

    "A B6 Falcon concentrator was tested on several systems: a synthetic magnetite-silica ore, a massive sulphide gold-copper ore, a fine gold-pyrite-silica flotation tail, and a high grade gold ore in a

    Jan 1, 1993

  • CIM
    Commissioning of a Brownfield CDS Plant: Victories and Pitfalls (48th Annual Canadian Mineral Processors Operators Conference)

    By N. Romani, R. Provost

    "Commissioning of a circulating dry scrubber (CDS) plant was recently completed at an existing facility in Québec, Canada. The CDS plant treats the sulphur dioxide off-gas emitted from rotary kilns i

    Jan 1, 2016