Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The Goldstrike pressure oxidation plant process and engineering design, construction and commissioning

    By K. S. Fraser, H. J. H. Pieterse

    "A pressure oxidation plant to pretreat refractory sulphide ore at the Goldstrike plant in Nevada, was commissioned in early February 1990. The plant, with a nominal capacity of 1363 t/d, was commissi

    Jan 1, 1992

  • CIM
    The Cigar Lake Mining Test

    By Barry W. Schmitke, J. M. Marino

    "Cigar Lake Mining Corporation is presently operating an underground test mine in northern Saskatchewan, with a view to developing a high grade uranium deposit. The mining test is intended to demonstr

    Jan 1, 1992

  • CIM
    Methods for recovering fine placer gold

    By Wang Wenqian, George W. Poling

    "Devices and flowsheets for recovering fine placer gold are reviewed. Inefficiencies of gravity processing techniques are documented and discussed. Prospects of combining gravity and froth flotation t

    Jan 1, 1983

  • CIM
    Training of mining engineers in the United States, Great Britain and southern Africa

    By A. E. Hall

    "This paper summarizes findings of a two-month investigation in Zambia and Zimbabwe and a one-month visit to Britain in1990-1991. United States contacts have supplied information about that country.Za

    Jan 1, 1993

  • CIM
    Prognoses for Alberta thermal and metallurgical coal

    "Projections of demand for Alberta coal indicate a quadrupling of current production rates to some 70 million tonnes/year by the end of the century. About half of this output-comprised of subbituminou

    Jan 1, 1982

  • CIM
    Recycling of Metal-Coated Plastic-Parts from End-Of-Life-Vehicles with Biotechnological Methods

    By F. Logsch, H. Pempel, J. Markowski, P. Ay

    "Due to the European Directive 2000/53/EC on end-of-life-vehicles, from 2015 on more than 95% of car materials have to be recycled. In order to recycle the materials back into the economic cycle, it i

    Jan 1, 2016

  • CIM
    Making better use of carbon: Part II - The co-production of iron and liquid fuels

    By John H. Walsh

    "ForewordPart I of this paper, published in the March 1992 issue of the CIM Bulletin, surveyed the probable consequences of a limitation on the emissions of carbon dioxide to the atmosphere for the st

    Jan 1, 1992

  • CIM
    Aluminum Alloy 7050 T7451 Thin Wall High-Speed Machining Parts Study

    By V. Songmene, A. Tahan, J. P. Michaud

    The machining of thin wall parts, often used in the aeronautical industry still creates a number of problems, including panel deformation. Quality and productivity are often affected. This study seeks

    Jan 1, 2006

  • CIM
    Mechanism of Thinner Action In Inhibited Muds

    By William C. Browning

    An economic drilling programme is one which costs the !east in chemicals, equipment, and time. The basis for such a programme with rotary drilling techniques is a drilling fluid in which bentonites do

    Jan 1, 1958

  • CIM
    Meter-wide veins and a kilometer-wide anomaly: wall-rock alteration at the Campbell Red Lake and Dickenson gold mines, Red Lake District, Ontario

    By C. Jay Hodgson, P. J. MacGeehan, T. Sanders

    "The orebodies of the Campbell and Dickenson mines are localized within an anomalously fissile and deformed zone that transects the eastern margin of a dominantly mafic volcanic complex close to its c

    Jan 1, 1982

  • CIM
    Evidence of Exhalative Origin for Tasmanian Tin Deposits

    Orebodies of the Renison Bell - Mt. Bischoff tinfield in Tasmania are stratabound, conformable lenses of massive cassiterite-bearing pyrrhotite, with underlying discordant, fault-fracture-controlled a

    Jan 1, 1979

  • CIM
    The Impact of Copper Mine Tailings Dam on the Groundwater Quality

    By A. Torkian

    Process water from production of concentrates in Meydook copper sulfide mine is transferred to the 8.3 million m3 tailings dam and a water retention pond after initial thickening. Elevated concentrati

    Aug 1, 2013

  • CIM
    Other Nova Scotia coalfields

    By Wynne Potter

    "On the west coast of Cape Breton Island four coal basins have been identified, varying in age and extending from Port Hood northeasterly to Chimney Corner. Those of Chimney Corner - St. Rose in the n

    Jan 1, 1985

  • CIM
    How accurate are non-destructive-testing based estimates of mine shaft rope breaking-strength losses? — an update

    By J. E. Udd, L. B. Geller

    "Mine-shaft wire-rope discard regulations include, among other criteria, a limited amount of permissible loss-of-breaking-strength (LBS). Currently, this parameter is estimated on the basis of non-des

    Jan 1, 1990

  • CIM
    Evolution and Optimization of the Gravity Recoverable Gold Test (e99ef368-b956-4514-b763-0f43ee32fd51)

    By S. Koppalkar

    ABSTRACT: The development and evolution of the gravity recoverable gold (GrG) test procedure at McGill university is reviewed in this paper. Since the late 1980s, the research group led by the late Pr

    Jan 1, 2010

  • CIM
    Geology of the Gondor volcanogenic massive sulphide deposit, Slave Province, N.W.T.

    By J. B. Heslop, D. S. Bubar

    "The Gondor Zn-Ag-Pb-Cu deposit is a stratabound massive sulphide lens occurring within Archean volcaniclastic rocks of the Yellowknife Supergroup. The deposit is located in the west-central portion o

    Jan 1, 1985

  • CIM
    Recovery of Cerium from Chloride Solution by Oxidation with Sodium Hypochlorite

    By K. Soldenhoff, D. Wilkins, E. Ho

    In the processing of rare earth ores, a pure, mixed rare earth chloride solution is usually produced and used as the feed to solvent extraction circuits to separate the individual rare earths. Cerium(

    Jan 1, 2014

  • CIM
    New flow-through share rules are here

    By Robert B. Parsons

    "A t last the legal red tape which has tied up flow-through share financing has been cut. New rules effective for deals signed after 1986 simplify flow-through financing by removing the necessity f or

    Jan 1, 1987

  • CIM
    Centre for Coal and Mineral Processing at the University of British Columbia

    By G. W. Poling

    "Construction, equipping and planned operation of a new laboratory for engineering-teaching and research in coal and mineral processing is described. This facility will provide approximately 1860 m2 (

    Jan 1, 1980

  • CIM
    Electroforming in Dentistry ? New Aspects and Trends

    By Michael Hopp

    The beginning of the electroforming technology dates itself on the beginning of the industrial revolution 1800 to 1820 approximately. Basis was the existence of electricity in order to be able to driv

    Oct 1, 2003