Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Effect of Silicon and Copper Content in the 3XX Series Aluminum Alloys on Thermal Processing and Mechanical Integrity

    By J. H. Sokolowski, R. I. MacKay

    The level of Si and Cu in the 3xx series of alloys affects the volume fraction of the a-Al dendritic phase and the Al-Si eutectic phase. The volume fraction of these phases in turn affects the feeding

    Jan 1, 2006

  • CIM
    New Locked Charge Protection System Prevents Damage to 14mw Geared Mill (e36f627b-5857-4b5e-9b18-31db39c538e3)

    The 14MW SAG mill at Tarkwa, Ghana, experienced a frozen drop charge incident on 10 February 2010. This caused downtime of 112 hours, a repair cost of $200k and production loss of 162,000 tons, corres

    Jan 1, 2012

  • CIM
    Literature survey on the recovery of gold from thiourea solutions and the comparison with cyanidation

    By G. Deschenes

    "This literature survey discusses the recovery of gold from thiourea solutions. An overview of techniques used and general comments on the basic cyanidation methods are presented. The chemistry and me

    Jan 1, 1986

  • CIM
    Administration Building Miners? Change-Rooms and General Offices of the McIntyre Porcupine Mines, Limited

    By Angus D. Campbell

    Introduction In the Twentieth Annual Report of the Mcintyre Porcupine Mines, Limited, for the year ending March 31st, 1932, the General Manager, Mr. R. J. Ennis, said: "During the period under revie

    Jan 1, 1933

  • CIM
    Pollution in Perspective

    By W. H. Gross

    To pollute means to make impure or unclean. We tend to forget that man defecates, urinates, sweats, expectorates and exhales and in himself is a beastly little pollutor-but then so is Mother Nature! T

    Jan 1, 1979

  • CIM
    Challenges of ISRU Rover Development

    ?Four-wheel, skid-steer, rover developed for CSA ?U-chassis for payload accommodation ?Passive geometric suspension ?Max speed 13km/hr ?Remote workstation ?275kg payload capacity ?On-board

    May 1, 2013

  • CIM
    Geology of the Key Lake deposits

    By Arthur L. de Carle

    "IntroductionThe Key Lake uranium-nickel deposits are located within a Mineral Lease centred at latitude 57 ° 12' north and longitude 105 °39' west along the southeastern rim of the Athabasca sediment

    Jan 1, 1986

  • CIM
    Research into a New Method to Define the ?Three Zones? Above a Thick Coal Seam Mines Byfull-Height Extraction

    By Zhiqiang Wang

    This paper mainly focuses on the method of ?three-zone? definition (a caving zone, a fissure zone and a curve subsidence zone) for full height cutting in a thick seam. Based on criteria of a caving zo

    Aug 1, 2013

  • CIM
    Review Of Industry Best Practices For The Use And Maintenance Of Shaft Ropes On Conventional Drum Hoists And Multi-rope Friction Winders

    By P. G. Smith, A. Axiuk

    The objective of this paper is to present, from a practical perspective, a review of the most relevant maintenance procedures that are accepted or prescribed to be the most effective in optimising ser

    Jan 1, 2023

  • CIM
    An Introduction on Stirred Milling of Nickel Laterites to Upgrade Nickel

    By L. Long

    Stirred milling of nickel laterites offers possibilities for improving liberation and selective size reduction of soft nickel-bearing minerals in laterites. Batch grinding tests were performed in a Ne

    Aug 1, 2013

  • CIM
    Splitting of Mudrocks/Shales by Gypsum Growth

    By A. Brian Hawkins

    "When pyrite oxidizes in dark grey/black, calcareous, mudrocks or in argillaceous limestones, ferrous sulfate is formed and sulfuric acid is released. The sulfuric acid combines with the calcite prese

    Jan 1, 2015

  • CIM
    Underground Operations at the Dome Mines (9ecdfeb1-07a6-4c2d-8ca3-2b5b1b6c1ce4)

    By John B. Phillips

    The mine is entered by a central vertical shaft, strongly timbered, and containing two compartments-one for the passenger cage, the other for the large skips bringing the ore to the surface. A man-way

    Jan 1, 1926

  • CIM
    Dynamic Biomechanical Simulation for Identifying Risk Factors for Work-Related Musculoskeletal Disorders During Construction Tasks

    By J. Seo

    We propose a dynamic biomechanical simulation method that uses motion capture to evaluate the risk of Work-related Musculoskeletal Disorders (WMSDs). Statistics show that WMSDs accounted for 33% of al

    Aug 1, 2013

  • CIM
    Quantitative Metallography of Titanium Alloys

    By D. Furrer, M. Dallaire

    The arrival of Image analysis in the last 20 years has changed the world of quantitative metallography. Many standard measurement techniques which were previously manual can now be done with fully aut

    Jan 1, 2006

  • CIM
    Operation Optimization and Capacity Expansion in Jinlong Copper Flash Smelter

    By Z. Jun, L. Kerning

    Jinlong copper smelter and refinery, originally designed for 100,000tpa primary copper and started up in 1997, has been expanding its capacity on the basis of operational optimization and by modifying

    Jan 1, 2007

  • CIM
    Qualification of Al-Cu Casting Alloys for Application in Permanent Mold Casting Processes

    By B. Tonn, F. Kröger

    "The continued development in engine technology is leading to an augmentation in power density which steadily elevates the requirements for thermally and thermo-mechanically highly loaded components s

    Jan 1, 2017

  • CIM
    New Locked Charge Protection System Prevents Damage To 14mw Geared Mill

    By H De Beer

    The 14MW SAG mill at Tarkwa, Ghana, experienced a frozen drop charge incident on 10 February 2010. This caused downtime of 112 hours, a repair cost of $200k and production loss of 162,000 tons, corres

    Nov 1, 2011

  • CIM
    New Locked Charge Protection System Prevents Damage to 14MW Geared Mill (7b868bde-460b-4446-94f2-2b070ebb2f1b)

    By P. van Zyl, M. Lombaard

    The 14MW SAG mill at Tarkwa, Ghana, experienced a frozen drop charge incident on 10 February 2010. This caused downtime of 112 hours, a repair cost of $200k and production loss of 162,000 tons, corres

    Jan 1, 2012

  • CIM
    Development of a simple segregation program to manage potentially acid generating waste rock at the Keystone Gold Mine, Manitoba

    By D. H. Flather, J. W. Hendry, K. Drover

    Black Hawk Mining Inc. has completed a comprehensive program on the prediction and management of acid rock drainage (ARD) at their Keystone Gold Mine (Keystone) near Lynn Lake, Manitoba. The program,

    Jan 1, 2000

  • CIM
    Present Trends in Oust Sampling and MAC Values in West Germany

    By Martin Landwehr

    "Dust samplers are based on different principles. The konimeter is based on the number of particles counted; mining applications are based on routine sampling; and the photometrical evaluation of samp

    Jan 1, 1969