Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Matching Motor to Mill Torque with Variable Speed DrivesBy Craig M. Sams
"Variable speed mill popularity has grown during the last 10 years with almost every SAG mill fitted with a variable speed drive. In addition, many of today’s larger ball mills are running a variable
Jan 1, 2007
-
An Evaluation of Flotation Reagents at the Majdanpek Copper MineBy P. V. Avotins, I. Djurkovic, D. R. Nagaraj, M. Grunjic, A. Day
"As part of a major reconstruction and expansion of the Majdanpek Copper Mine, an investigation and optimization of the flotation collector regime was undertaken. The flotation response of the major m
Jan 1, 1992
-
Raw Water Supply: The Experience of Cerro VerdeBy Ken Wood
"A reliable source of water of an acceptable quality is vital to the success of any mineral processing plant using wet methods. For Cerro Verde, a new 108,000 t/d copper mill in southern Peru, the mai
Jan 1, 2008
-
Behavior of Iron at the Ambatovy Nickel Operation in MadagascarBy B. Haugrud, E. McConaghy, M. Collins, G. Smith
"Laterite ore processed by the Ambatovy Joint Venture in Madagascar is primarily limonitic in nature, containing about 40 to 45 wt.% Fe and 1.1 wt.% Ni. The process selected for treatment of this ore
Jan 1, 2016
-
The South American Experience in Adopting Twin Machine Grinding Mill Relining TechnologiesBy John Russell
"The South American mining community leads the world in recognition and adoption of the latest grinding mill relining technologies. Clearly this region has recognised the benefits of improved relining
Jan 1, 2010
-
An Investigation in the Stand up Time of Stopesat Birchtree Mine in Thompson, ManitobaBy Matthew Violot
Introduction ?Located off highway 6, approximately 5 km, SW of Thompson, Manitoba ?Base metal mine: Nickel? Maximum Depth: 4100 ft ?Started Production in 1966 (INCO, 2006)?Halted in 1978?Re-opened
Nov 1, 2011
-
Design of the Pierina waste dumpBy R. Sharon, P. M. Hawley, X. Ochoa
"Development of Barrick Gold’s Pierina gold mine in north-central Peru requires construction of a waste dump for disposal of nonore grade materials stripped from the open pit to expose the ore. The wa
Jan 1, 2003
-
Effect of environmental variables on pitting corrosionBy S. Rajeswari, D. Gopi
"Pitting corrosion inhibition of 304 stainless steel (SS) in groundwater with a ternary inhibitor mixture (phosphonic acid + bivalent cation + various surfactants) was studied with different environme
Jan 1, 2003
-
Hazard Map Approach Using Space-time Clustering Analysis of Mining-induced MicroseismicityBy Pavel Vasak
Microseismic monitoring has become standard practice in the mining industry as a ground control monitoring tool at depth. Translating the information into practical hazard assessment tools for the roc
May 1, 2004
-
Jaguar?s Caeté Gold Project in BrazilBy Ivan C. Machado
Jaguar Mining Inc. is implementing a 1.1 Mtpy, 7-year LOM gold project in the Iron Quadrangle (?Quadrilátero Ferrífero?), Brazil. Construction is on schedule and startup is programmed for Q2 2010. Mil
May 1, 2010
-
A Comparison of Open Circuit versus Closed Circuit SAG Milling at the Williams MineBy David Evans, David Barnes, Robert Raponi
"The Williams Mine processes, on average, 6,450 t/d of gold bearing ore using two parallel grinding circuits, leaching and C.1.P., carbon stripping, electrowinning and refining. At present, each grind
Jan 1, 1997
-
Flotation at Les Mines SelbaieBy Adam Wright
"Les Mines Selbaie have been producing copper and zinc concentrates from the A-1 ore zone since 1986. This paper reviews major developments in flotation practice over that period. Firstly, ore blendin
Jan 1, 1995
-
An Economic and Environmental Case for Re-processing Gold Tailings in South AfricaBy James A. Brown, Marius Botha, Christopher A. Fleming
"The technical and economic feasibility or re-processing hundreds of millions of tons of tailings in a number of historic gold tailings dams in the Witwatersrand area of South Africa is being investig
Jan 1, 2010
-
Fuel cell risk assessment, regulatory compliance, and implementation of the world’s first fuel cell-powered mining equipment at the Campbell Mine (2f329a25-0d4f-40d5-a572-5230f6f201ab)By T. MacKinnon, M. C. Bétournay, D. Eastick, F. C. Delabbio, C. Graves
"The successful implementation of a new technology in an underground production mine requires many challenges to be overcome. These challenges include mine hardening of new technology, mitigation of s
Jan 1, 2005
-
Mine backfill design and testingBy Robert J. Mitchell
A general approach to mine backfill design, including laboratory testing procedures, is outlined in this paper. Relationships between certain design parameters are developed and the effect of other fa
Jan 1, 1979
-
Health and Safety in Mineral Exploration: The PDAC RoleBy Bill Mercer
The Triggers for PDAC Involvement in H&S ??Increase in serious accidents in mineral exploration in past few years ??Increasing junior role in exploration ?? Impression that there were few H&S prot
May 1, 2008
-
Commissioning and Testing of Thickener Feed De-Aeration Cyclones at the Xstrata Nickel Raglan OperationBy Colin Hardie, Simon Pelletier, Rakan Rhabani, Guy Comeau
"In order to improve the nickel concentrate thickener operation at Raglan Mine, two pulp deaeration cyclones were installed. These units obtained from Outotec Pty Ltd, also called the FrothBuster®, ha
Jan 1, 2008
-
Use of Twinned Drillholes in Mineral Resource Estimation"Drilling twinned holes is a traditional technique used for verification of intersections of high-grade mineralization, testing of historic data, or confirmation of drillhole data during geological du
Jan 1, 2009
-
Removal and destruction of ammonia from a uranium plant effluentBy P. A. Riveros, W. D. Gould, R. Molnar, D. W. Koren, P. Bédard
This paper reports the results of the field demonstration campaign of a new process for removing and destroying ammonia from mining/ metallurgical effluent solutions. The 50-day campaign was carried o
Jan 1, 2003
-
The Horne Mine: Geology, History, Influence on Genetic Models, and a Comparison to the Kidd Creek MineBy Sergio Cattalani, David J. Kerr, Harold L. Gibson
Abstract - The Horne mine was truly a world class Cu and Au deposit. Between 1927 and 1989, it produced some 260 t of Au and 1.13 Mt of Cu from 53.7 Mt of ore that averaged 2.22% Cu, 6.1 g/t Au and 13
Jan 1, 2000