Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Uranium Exploration in the United States

    By Phillip I. Merritt

    "IntroductionDuring and since• the war, it has been my privilege to work closely with those in Canada who are responsible for the vital raw materials needed in our co-operative atomic energy programme

    Jan 1, 1950

  • CIM
    The real costs of lubrication

    By R. Melley, P. Wissner

    The paper looks at the basic theory of tri-bological wear and the role played by the lubricant and its additives. It presents the argument that the “real cost of lubrication” is not the purchase price

    Jan 1, 1997

  • CIM
    Inflows in Uranium Mines of Northern Saskatchewan: Risks And Mitigation

    By R. Bashir, J. F. Hatley

    ABSTRACT Northern Saskatchewan boasts some of the world’s largest known high-grade uranium deposits. The successful mining of these deposits cannot be accomplished without overcoming technical challen

    Jan 1, 2013

  • CIM
    Obtaining Maximum Value from Metallurgical Projects - Avoid Throwing it Away

    By A. Eltringham

    Operations downstream of mining and beneficiation are still being subjected to increasing scrutiny as highly capitalized projects have been either slow to achieve their targets or have actually failed

    Jan 1, 2011

  • CIM
    CRIRSCO 2007 — current activities

    By J. Postle, Deborah McCombe

    "This is the third in a series of articles about the Committee for Mineral Reserves International Reporting Standards (CRIRSCO). The first article was an interview with Niall Weatherstone, Chairman of

    Jan 1, 2003

  • CIM
    Industrial Minerals in Chemical Manufacturing

    By Alfred W. G. Wilson

    THE ultimate purpose of the Chemical Manufacturer is to produce consumer products which can be sold to customers. Such production and sales can be continued only if the operations yield a profit to th

    Jan 1, 1940

  • CIM
    The Impact of Operating Cost on Life-of-Mine Costs of Hydrometallurgy Facilities

    By J. R. Porter, C. Panaou

    "A significant effort is expended on preparation of the capital estimate for feasibility studies. The development of the operating cost estimate is usually allocated a significantly smaller budget and

    Jan 1, 2012

  • CIM
    Flammability of Ammonia Leach Solution Vapours Under an Atmosphere of Enriched Oxygen

    By J. Budac, R. Kofluk, D. Belton, M. Sjogren

    A series of tests were performed to determine the flammability limits of mixtures of oxygen, ammonia, steam and nitrogen, over a solution, in a sealed autoclave. The partial pressures of ammonia and o

    Jan 1, 2004

  • CIM
    Modeling of CBM Recovery in the Amasra Coalfield, Turkey

    By K. Baris

    Methane (CH4) present in coal seams, generally known as Coalbed Methane (CBM), Coal Mine Methane (CMM) or Coal Seam Gas (CSG), is a major energy source, as it is the primary constituent of natural gas

    Aug 1, 2013

  • CIM
    Heat Flow and Permafrost

    By Alan M. Jessop

    This paper discusses the distribution of frozen ground in the zone of discontinuous permafrost in relation to the pattern of surface temperature. The importance of understanding permafrost in relation

    Jan 1, 1972

  • CIM
    Chapter 5. Royalty Interests

    By Karl J. C. Harries

    "5.1. INTRODUCTIONThis chapter is intended as a general overview of the subject of royalties between private parties – royalties extracted by governments are not dealt with. This same subject is cover

    Jan 1, 2003

  • CIM
    The Gold-Rich Louvicourt Volcanogenic Massive Sulfide Deposit, New Brunswick: A Kuroko Analogue in the Bathurst Mining Camp

    By D. R. Lentz, C. J. Beaumont-Smith, S. H. Mcclenaghan

    "Abstract - The Louvicourt Au-Ag-Cu-Zn-Pb sulfide deposit is hosted by a Middle Ordovician calc-alkaline sequence of aphyric rhyolite flows and associated fragmental rocks at the top of the Flat Landi

    Jan 1, 2006

  • CIM
    The Effect of Iron Removal from Raffinate on the Copper Bioleaching Process

    By A. Ghahremaninezhad, E. Jorjani, A. Riahi, Islamic Azad University, B. Nazari, H. Hani, Z. Manafi

    The presence of a high iron concentration, 9.1 g/L, in the raffinate of the Sarcheshmeh copper heap bioleach process led to the formation of various types of jarosite, (K,Na,NH4,H3O)Fe3(SO4)2(OH)6, on

    Jan 1, 2016

  • CIM
    Geology and Oxide Mineralization of the Pipestone Lake Anorthosite Complex, Manitoba

    By D. C. Peck, H. D. M. Cameron, N. M. Halden, L. S. Jobin-Bevans

    Abstract-The late Archean Pipestone Lake anorthosite complex (PLAC) is a 0.9 x 17 km sill-like layered intrusion that is part of a suite of coeval megacrystic anorthosite bodies in the Cross Lake regi

    Jan 1, 1997

  • CIM
    On the aqueous oxidation of polymetallic Cu-Zn-Pb gold-bearing sulphide ore in an autoclave

    By R. Vracar, D. Sinadinovic, Ž. Kamberovic

    The paper presents a study on the oxidation of polymetallic gold ore by oxygen in an autoclave. It presents optimum parameters of autoclave leaching of sulphide refractory ore in self-generated sulphu

    Jan 1, 2001

  • CIM
    Institutionalizing Advanced Control on Newmont's Carlin Trend

    By A. I. Collins, D. Danninger

    Newmont has installed advanced control and online optimization on the dry grinding circuit and both roasters on its Carlin Trend refractory ore treatment plant. Subsequently, Newmont has developed a m

    Jan 1, 2005

  • CIM
    Mucking efficiency in open pit blasting

    By J. J. Montoro

    The influence of blasting on the excavators’ efficiency, defined as mucking rate (amount of rock mucked per unit time) and mean bucket load (amount of rock loaded in each bucket operation), is investi

    Jan 1, 2007

  • CIM
    Evaluation of Location Based Management System in the Construction of Power Transmission and Distribution Projects

    By Abhiram Shankar

    Construction projects are becoming more demanding both in terms of time and complexity. This necessitates intricate planning and sequencing of activities at the macro and micro level and continuous fl

    Aug 1, 2013

  • CIM
    K-Ar and Rb-Sr dating and the genesis of tungsten at the Clea tungsten skarn property, Selwyn Mountains, Yukon Territory

    By K. M. Tompson, R. L. Armstrong, C. I. Godwin

    "Tungsten skarn deposits on the Clea property in the Selwyn Mountains, Y. T., are related genetically to a quartz monzonite stock, about 500 metres in diameter at the surface. Lower Paleozoic sediment

    Jan 1, 1980

  • CIM
    Innovations and Breakthroughs in Mineral processing that have shaped the Existing Mining Industry

    By B. K. Gorain

    "As mining has evolved over a century, so are the challenges associated with mining. Mining of complex ore bodies at greater depths is a major challenge requiring high capital and operating costs due

    Jan 1, 2016