Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Planning and Installation of the New Underground Winder (No. 2 Hoist) on the Rosebery Mine Inclined Shaft

    This paper traces briefly the reasoning which led to the decision to extend the existing internal shaft at the Rosebery Mine and to instal underground a larger winder (No. 2 Hoist) with capacity to ha

    Jan 1, 1958

  • AUSIMM
    Not for the Faint-Hearted

    By J Whittle

    This paper describes what is involved in carrying out a comprehensive optimisation of a long-term operating schedule for a mining complex. It details the data that must be assembled and discusses the

    Nov 24, 2014

  • AUSIMM
    Sampling in Block Cave Mines

    By I T. Ross

    Sampling drawpoints in block cave mines has been a contentious issue for many years. Doubts have been expressed as to the validity of the process used at most mines. This paper outlines the sampling p

    Aug 21, 2012

  • AUSIMM
    Understanding your work health and safety obligations – risk-based psychosocial safety: a framework for leaders and supervisors to demonstrate that they are working to meet their obligations

    By S Harrison

    Work health and safety duties around Australia include duties to manage psychosocial health and safety (mental health) of workers engaged by businesses or undertakings and of other persons impacted by

    Apr 16, 2024

  • AUSIMM
    The Technical Analysis of Lead Blast Furnace Slag, as Practised at the Port Pirie Works of The Broken Hill Associated Smelters Pty. Ltd.

    THE slag from the blast furnaces having been granulated, a representative sample is taken to the sample mill. It is then dried, crushed through a 100-mesh screen, intimately mixed, and packeted for as

    Jan 1, 1922

  • AUSIMM
    How Leaky are Oceanic Ridge Axes? A New Assessment of the Spatial Density of Submarine Hydrothermal Discharge

    By E T. Baker, J A. Resing, S L. Walker, V Ferrini, F Martinez, R Haymon

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Enumerating active sea floor hydrothermal sites has been a challenge since their discovery

    Mar 18, 2015

  • AUSIMM
    The Pebble Copper-Gold-Molybdenum Porphyry Deposit, South-West Alaska, USA

    By C M. Rebagliati, J G. Payne, K Roberts

    The Pebble deposit, located in south-west Alaska, is one of the largest Copper- Gold-Molybdenum (Cu-Au-Mo) porphyry systems in the world, with a current resource of >8 billion tonnes which contain

    Jan 1, 2008

  • AUSIMM
    Mine Planning at Murrin-Murrin ù Modelling to Determine the Optimum Path

    The process of mine planning at AnacondaÆs nickel and cobalt laterite operation located at Murrin-Murrin in the Northern Goldfields of Western Australia is carried out in a number of stages in an ende

    Jan 1, 2003

  • AUSIMM
    Modification to Flotation Cells at the Zinc Corporation Limited

    The paper gives details of the reasons why attention was directed towards the modification of flotation cells. The cell volume and impeller speeds were reduced, and it is estimated that the power cons

    Jan 1, 1956

  • AUSIMM
    Progress Report on Rod Milling at King Island Scheelite (1947) Limited

    The paper gives details of the performance of a 6-ft. by 6-ft. grate discharge ball mill which was converted into a rod mill of the overflow type and then into a grate discharge rod mill. Proposals fo

    Jan 1, 1955

  • AUSIMM
    Preparing Effective Specifications for Occupational Health and Environmental Noise Objectives in Mining Project Design and Delivery

    By C Tickell

    Achieving occupational health and environmental noise objectives is a major consideration in the planning or operational phase of resource development and industrial projects to meet the needs of the

    May 9, 2016

  • AUSIMM
    Learnings from review of drawpoint management across New South Wales mines

    By X Hill

    Throughout the 2016/2017 financial year, the NSW Resources Regulator conducted an assessment of each underground metalliferous operation across the state to assess how each operation managed the princ

    Oct 16, 2017

  • AUSIMM
    Mount Isa Mines Copper Concentrator - An Insight into Current and Historical Practice

    By P Radulovic, W Y. Lui

    The Mount Isa Mines (MIM) copper concentrator at Mount Isa processes both chalcopyrite ore from the MIM underground mine and rotary holding furnace (RHF) slag from the MIM copper smelter. There have b

    Jul 15, 2013

  • AUSIMM
    The Pilbara Iron Ore Industry ùThe State of Play and Challenges Ahead

    I would like to start by thanking The AusIMM and CSIRO for organising this excellent conference and inviting me to give a keynote address. Today I will focus on some broad observations of our industry

    Jan 1, 2002

  • AUSIMM
    Rakeless Thickener Operation at St Ives Gold Plant

    The first 12 m diameter rakeless thickener in the Australian gold mining industry was installed to treat plant tailings at the St Ives gold plant in April 2000. The plant processes approximately 3.2 M

    Jan 1, 2002

  • AUSIMM
    Comparison of Excavation Methods in Different Ground Conditions with the Decision Aids for Tunnelling

    By F Sandrone, J-P Dudt, J Zhao, E Paltrinieri

    Tunnel boring machines (TBMs) excavation is nowadays more and more considered a valuable alternative to conventional tunnelling. As a matter of fact, thanks to its advantages such as greater rate of a

    Sep 17, 2014

  • AUSIMM
    Automated Drilling Features for Improving Productivity and Reducing Costs in Underground Development

    By J Välivaara

    The mining industry will face numerous challenges over the next 10–15 years as new deposits are likely to be more remote and lower grade and existing deposits will be mined deeper. As a result, mines

    May 9, 2016

  • AUSIMM
    The CENIM_LNETI Process for Zinc Recovery from Complex Sulphides

    By Amer S, Novais A. Q, Limpo Gil J

    A proprietary hydrometallurgical ammonium chloride process for the recovery of not only zinc, but also copper, lead and silver from sulphidic zinc-rich concentrates has been developed at bench scale

    Jan 1, 1993

  • AUSIMM
    Overcoming Mine Design and Production Challenges at the Sinclair Underground Nickel Project

    By M J. Ireland, D P. Horne, S J. Simpson

    The Sinclair Nickel Project, wholly owned by Xstrata Nickel Australasia (XNA), includes an underground mine, a concentrator, a village, an all-weather airstrip and associated mine infrastructure. The

    Mar 26, 2012

  • AUSIMM
    Scenario Thinking - A Powerful Tool for Strategic Planning and Evaluation of Mining Projects and Operations

    By G Nicholas, S Coward, J Vann, R Wolff, S Jackson, S Moayer, A Bye

    "A new approach to mineral project evaluation is described called Scenario-Based Project Evaluation (SBPE). SBPE incorporates well established æscenario planningÆ and æscenario thinkingÆ approaches, w

    May 24, 2012