Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Be Open to Closure - It Can Save You Money

    By J Heyes

    Historically mining engineers haven't spent enough time planning waste dumps, but waste movement costs often outweigh ore haulage costs. There is a real incentive to plan waste dumps right the fi

    Jan 1, 2009

  • AUSIMM
    Groundwater Search Management In Desert and Arid Terrain - A Case History Telfer, Great Sandy Desert, Western Australia

    During the intial two years (1972 - 1974) of exploration at Telfer, water require- ments were limited to supporting a 50 man camp and diamond drilling to verify thickness and grade of the strataboun

    Jan 1, 1988

  • AUSIMM
    Problems and Changes Under Queensland Mining Legislation

    By North R. A

    The Queensland Mining Act 1968-1972 has now been in force for almost two years. The Act was completely re-written and has made for easier working, e.g., there is no distinction now between Gold Min

    Jan 1, 1974

  • AUSIMM
    Mine Fill in Narrow Vein Mining

    By E G. Thomas

    "This paper details the many improvements possible in narrow vein mining from the use of treated mining/milling waste as mine fill. Such fill can be: treated mill tailing, cemented or uncemented; deve

    Mar 26, 2012

  • AUSIMM
    The evolution of the Monty Geological model and the revolution of the on-site modelling and grade control processes

    By P Willems, J B. Crow, R Dale

    Open pit mining commenced at Lihir Island in 1997 and is undertaken using a conventional drill, blast, load, haul methodology. Unique challenges at the operation include an active geothermal system, a

    Mar 22, 2022

  • AUSIMM
    Redefining Competent Persons Criteria for Resource Geologists

    By J Coombes

    There is much debate on the Competent Persons qualifying criteria for providing classified resource estimates for public reporting. The CRIRSCO family of codes including the JORC Code, SAMREC, PERC an

    Aug 18, 2014

  • AUSIMM
    Analysis on crack distribution and evolution characteristics of gangue backfilled working face roof

    By X Y. Ma, X G. Tian, P F. Zhang, T B. Zhao, Z H. Li, Z Y. Fu

    This study analysed the fracture characteristics and movement process of goaf roofs under the condition of gangue backfilled mining, based on the engineering conditions of Tangshan Mine F5001 gangue b

    Nov 29, 2022

  • AUSIMM
    Sensitivity of Adaptive Optimisation to Reaction Kinetics in Leaching Processes

    By Jefferson CB

    Adaptive optimisation is the adjustment of operating conditions to maintain optimum process performance as the feed quality varies. This strategy has the potential to be economic- ally better than

    Jan 1, 1984

  • AUSIMM
    Geophysical Anomalies Associated with the Puhipuhi Epithermal Area

    By S A. Johnson, J Cassidy, J L. Mauk

    Geophysical anomalies at Puhipuhi reflect both diverse lithologies and different degrees of hydrothermal alteration. Most significant is a strong negative gravity anomaly (up to 50 g.u.), encompassing

    Jan 1, 1999

  • AUSIMM
    Mining Tomorrow ù A View From a Leading Global Mining Equipment Supplier

    As economic, technological, regulatory and other forces continue to present the global mining industry with new opportunities and challenges, agile mining equipment manufacturers are stepping up their

    Jan 1, 2000

  • AUSIMM
    Big Diameter Tunnelling Beneath Low Rock Cover

    By N McKenzie, F Brodbeck

    The North-South Bypass Tunnel is the first project to get underway as part of BrisbaneÆs transport plan, which aims to improve the urban road network. The total length to be excavated is 6.8 km, which

    Jan 1, 2008

  • AUSIMM
    Geometallurgy – Back to the Future: Scoping and Communicating Geomet Programs

    By J Jackson

    The term geometallurgy (or geometallurgical) first appeared in the literature some 40 years ago and has a wide range of definitions and perspectives which increases the barriers of communication betwe

    Sep 5, 2011

  • AUSIMM
    Opportunities for rare earth element recovery from waste streams

    By K Clode, J Al-Shdifat, S Daykin

    Planning for a circular economy allows for previously untapped market opportunities to be explored, resulting in new, innovative revenue generating opportunities, while also reducing environmental imp

    Sep 1, 2024

  • AUSIMM
    The necessary role of the geologist in geotechnical data gathering

    By P B. Hills

    Almost a quarter of a century since Bridges (1993) documented techniques for the assessment of ground conditions in a seminal paper in the Proceedings Second International Mining Geology Conference, t

    Sep 20, 2017

  • AUSIMM
    Building and Maintaining Effective Project Teams

    By J A. Wells, K G. Thomas, R F. Dewhirst

    "One of the contributing factors to the extreme cost escalation in the first decade of the 21st century was the increase in the amount and cost of engineering work that went into studies and projects.

    Mar 8, 2016

  • AUSIMM
    Unlocking resource confidence in coal through use of conditional simulation

    By B Haase, R Saha

    Conditional simulation (CS) has been extensively used in metal industry to assess uncertainty of geo metallurgical variables to build robust distributions around grade tonnages across different time h

    Mar 22, 2022

  • AUSIMM
    Mount Isa Mines Limited Extensions to Plant

    Many mining companies, by their remoteness of location from source of power, have to generate their own power and must experience the same problem that had to be met when deciding to increase the capa

    Jan 1, 1953

  • AUSIMM
    Semi-automated Geological Interpretation Using Assay and Infrared Spectroscopic Sensing Parameters towards Improvements in Geological Modelling

    By F Flitti, M Haest, O Dominguez, D Mittrup, G Hird

    The automated geology interpretation (AGI) tool has been developed in BHP Billiton to automate stratigraphy logging of drill holes, using any available quantitative data sets. At present, AGI is set-u

    Jul 13, 2015

  • AUSIMM
    De-bottlenecking Iron Ore Transportation from Mine to Plant

    By T Tan, C P. Holmes, C E. Hartford

    Transportation of iron ore from the mine to the plant is critical to business success. Ore from the mine may have to be transported across states, countries and even continents to get to the processin

    Jul 13, 2015

  • AUSIMM
    Improving crusher throughput using a problematic ore index based on simple, first principles geology

    By T Walton, C Perring, M Pepper, G Gerber

    The Yandicoogina Channel Iron Deposit (CID) is an accumulation of iron pisolites cemented by a goethite-rich matrix. The Yandicoogina CID’s are found in a palaeochannel that meanders within a broad st

    Mar 22, 2022