Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    A Simple Method of Calculating Grouted Rock Bolts

    By Yu-Jun Z

    According to site measurement and labora- tory experiment, the authors suggest a new mathematical model of grouted rock bolts. The rock bolt is taken as an elastic bar, and the grout is substituted

    Jan 1, 1987

  • AUSIMM
    Reply to Contributed Discussion by P. S. B. Stewart, Bulletin and Proceedings 289(8) Nov./Dec. 1984 to "Drilling Patterns and Ore Reserve Assessments" by G. M. Philip and D. F. Watson

    By Watson D. F

    P S B Stewart has rightly pointed to a possible obscurity in our paper on drilling patterns, viz. in comparing the improvement of a triangular drilling pattern over a square one, we used percentage im

    Jan 1, 1985

  • AUSIMM
    Explosion in A B.O.S. Furnace

    On Wednesday 11th November, 1970, a series of violent explosions occur-- red within No.1 Basic Oxygen Steelmak- ing (B.O.S.) furnace at the Whyalla Works of the Broken Hill Proprietary Co. Ltd., (B.

    Jan 1, 1975

  • AUSIMM
    Wall control blasting – the influence of engineering geology on blast design

    By T N. Little

    This paper is concerned with the influence of engineering geology on design of Wall Control Blasts. In the Introduction, the Blast Management Framework and the Blast Design Requirements classification

    Jun 22, 2022

  • AUSIMM
    Determining Gold Particle Size in Gravity Ores for Sampling and Metallurgical Characterisation - Discussion and Test Protocol

    Sampling protocols and metallurgical flow sheets should be designed to suit the style of mineralisation in question. In support, the a priori need for evaluation programs is the characterisation of th

    Aug 1, 2010

  • AUSIMM
    The Contribution of Geological Surveys to Mineral Exploration in Australia

    In this year marking the centennial of the Geological survey of Western Australia, it is appropriate that we should review the value of the contribution of the Survey, and Australian Geological Su

    Jan 1, 1988

  • AUSIMM
    Experiences from developing a road map to attractive, inclusive and safe mining workplaces

    By L Abrahamsson

    The aim with this paper is to discuss experiences from the ongoing research project ‘Attract: A roadmap to attractive, inclusive, and safe mining workplaces’. The project’s aim is to analyse possibili

    Sep 1, 2024

  • AUSIMM
    SBRE framework – application to Olympic Dam deposit

    By D Clarke, I Minniakhmetov

    This paper describes the application of the SBRE framework to model the Olympic Dam deposit, one of the largest copper and uranium deposits in the world. Geostatistical simulations are the best practi

    May 24, 2023

  • AUSIMM
    The Risks of Excess Water on Tailings Facilities and Its Application to Dam-break Studies

    By D Luppnow, H Rourke

    Recent disasters such as the failure of the Mount Polley tailings embankment remind us of the risks that tailings facilities pose. It is widely recognised that dam-break assessments are a vital tool i

    Jul 27, 2015

  • AUSIMM
    Simulation as a Tool for Mine Planning

    By J Greberg

    This paper discusses the use of simulation in the mine planning process. A case study on the Newcrest Cadia East project is presented, and the challenges and possibilities for using simulation as a to

    Nov 22, 2011

  • AUSIMM
    Derivation of High Reliability Water Quality Guideline Values for Cobalt in Freshwaters – Improving Water Quality Guidelines for Better Water Quality Compliance Management in Mining

    By F Butler, G E. Batley, A C. Hogan, A R. Butler

    The ANZECC/ARMCANZ (2000) Water Quality Guidelines (the Guidelines) are the primary reference used in Australia and New Zealand for managing and regulating water quality. For most mining operations in

    Jun 28, 2016

  • AUSIMM
    Lead-zinc Ore Mining by Mount Isa Mines Ltd, Hilton Mine, Mount Isa, Qld

    Hilton Mine is located 20 km north of the city of Mount Isa and Isa Mine in far north west Queensland. The sealed road used by the 500 employees to commute from the city is part of the Barkly Highway

    Jan 1, 1993

  • AUSIMM
    Digital mapping for rock mass discontinuities – opportunities and challenges

    By J Leem, S Mehrishal, J Kim, A Fereshtenejad, J Song

    Rock mass discontinuity mapping plays a crucial role in developing a reliable Discrete Fracture Network (DFN), providing insights into the distribution of geometrical and mechanical properties of disc

    Sep 1, 2024

  • AUSIMM
    A Paradigm Shift in Underground Raisebore Reamer Removal

    By P Viljoen, A Holland, C Parken

    In the raisebore industry, there are two known methods of removing large diameter reamer heads once the reaming of an underground shaft is complete: 1. Lower the reamer head to the base of the shaft a

    Mar 15, 2021

  • AUSIMM
    Conservation of Effective Efflux Velocity from a Road Tunnel Ventilation Outlet by Varying the Effective Cross-Sectional Area

    By A Bagis

    Road tunnels are an accepted and effective transportation solution in urban areas to mitigate increasing traffic congestion and facilitate improved urban connectivity in a cost effective manner while

    Mar 8, 2011

  • AUSIMM
    The Economic Consequences of Drill Hole Deviation in Crushed Aggregate Production

    For many crushed aggregate producers will the finest fraction minus 4 mm represent a problem. The fine material will fetch a much lower price than the coarser products, and may even be difficult to se

    Jan 1, 1999

  • AUSIMM
    Investigation of Alternative Drawpoint Sampling at Ridgeway Mine, NSW

    By J Rutter, M NoppT

    Ridgeway Gold Mine is part of Cadia Valley Operations which is wholly owned and managed by Newcrest Mining Limited. Ridgeway is an underground sublevel cave (SLC) operation mining approximately 5.6 Mt

    Jan 1, 2005

  • AUSIMM
    Extending mine life through application of an in situ recovery approach

    By D J. Robinson, L L. Kuhar

    In-situ recovery (ISR) is accepted and applied across many geographies, and approximately 50% of the world’s uranium is currently extracted by using an ISR method (World Nuclear Association, 2014). T

    Jul 25, 2018

  • AUSIMM
    Quantification of Drill Hole Deviation – Century Mine Case Study

    By C D. Pocock

    Maintaining catch berm capacity in open pit mines through controlled blasting prevents production delays associated with managing risks associated with wall instability. A method has been developed to

    Nov 8, 2011

  • AUSIMM
    Analysis of Stability and Design of Face Support for Cross Passages – Waterview Connection Tunnels, Auckland, New?Zealand

    By M G. Wansbone, R Bhargava

    The inferred ground conditions for the proposed mined cross passages at the northern end of the Waterview Connection tunnels consist of an overburden of alluvial and residual soils, with mixed face ge

    Sep 17, 2014