Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Interaction Between Finely Ground Pyrite with Potassium Amylxanthate in Flotation: Influence of pH, Grinding Media and Collector Concentration

    By Michot LJ, Kongolo M, De Donato PH

    Diffuse Reflectance Infrared Fourier Transform Spectroscopy (DRIFTS), Hallimond tube flotation tests and microelectrophoresis measurements have been used to investigate the reactions involved in the

    Jan 1, 1993

  • AUSIMM
    Keynote Address A Review of Instantaneous Outburst Data

    The problem of instantaneous outbursts remains unsolved after over a century of events and the investigation of the mechanism of the phenomenon and means of treating it. Outbursts have occurred of

    Jan 1, 1980

  • AUSIMM
    Inclined Troughed Belt Conveyor Systems for Underground Mass Mining Operations

    By A G. L Pratt

    Inclined troughed belt conveyors are more frequently being selected from a range of alternatives, which include shafts and trucks for ore haulage in underground mass mining projects. Belt conveyor hau

    Jan 1, 2008

  • AUSIMM
    Transient slag behaviour in the Direct Reduced Iron (DRI) and scrapbased Electric Arc Furnace (EAF) process – case study for high and low-grade DRI input

    By S K. Panda, M A. Van Ende, S Chatterjee

    Tata Steel Netherlands (TSN) aims to reduce its CO2 emissions by 35–40 per cent by 2030 and become CO2 neutral by 2045. A first step to reach these targets is via the utilisation of an Electric Arc Fu

    Jun 19, 2024

  • AUSIMM
    Goodbye from the Argyle diamond deposit – insights from deep mining of the world’s largest diamond deposit

    By C B. Smith, G L. Boxer, S W. Moss, A L. Jaques, V Lorenz, M J. Rayner

    The Ernest Henry Iron Oxide Copper Gold deposit is hosted in a large dilation between two moderately dipping shear zones found in the footwall and hanging wall of the deposit. These shears are control

    Mar 22, 2022

  • AUSIMM
    The Partition of Sulphur and Silicon in the Iron Blast Furnace

    By Cripps-Clark CJ

    Sulphur partition between metal and slag has been examined on a cast-by-cast basis for BTIP furnaces. Partition values. were calculated from thermodynamic equilibrium data together with oxygen act

    Jan 1, 1980

  • AUSIMM
    Carrapateena project to date – Geotechnical risks and management

    By G Balog, T Ormerod, D Cox

    This paper discusses the methods utilised by the technical team to identify and quantify the SLC risk factors, the modifications to mine design and scheduling, and the changes to the planned risk mana

    Mar 15, 2021

  • AUSIMM
    Automated joint mapping using the concentric shells algorithm

    By P Valenzuela

    Joint mapping is a fundamental input for rock mass characterisation and slope stability analysis. The usual way to do it is using a compass in the field or digitising structures on a screen, with a so

    Sep 20, 2017

  • AUSIMM
    Polysaccharides - Emerging Non-Toxic Modiflers for Differential Flotation of Sulphides

    By Nyamekye GA, Subramanian S

    Adsorption tests have been carried out to elucidate the interaction mechanism between dextrin and sulphide minerals. Sulphides such as galena and heazlewoodite exhibit high affinity adsorption over

    Jan 1, 1993

  • AUSIMM
    Investigations for Proposed Upgrade of the Homer Tunnel, New Zealand

    By A D. Campbell

    The Homer Tunnel is located in a remote area of the South Island of New Zealand and carries large numbers of tourists to Milford Sound through an avalanche prone area. The tunnel is 1280 m long with a

    Mar 8, 2011

  • AUSIMM
    A reliable solution for pumping mineral froth with challenging froth volume

    By A Roudnev, P Loderer

    Mineral froth pumping utilising centrifugal slurry pumps is a major engineering challenge for both the end users and pump manufacturers. The traditional approach has been to oversize the pump for pump

    Aug 29, 2018

  • AUSIMM
    Innovative Tailgate Mobile Goaf Gas Management in Two Gate Road Longwall Panels – Concept to Implementation

    By B Belle

    In a deep, gassy predrained coalmine, ventilation and goaf drainage systems act as critical controls to manage longwall (LW) panel return gas levels. The goaf capture efficiency of most LW panels rang

    Aug 31, 2015

  • AUSIMM
    Using Geometallurgy during Process Optimisation Activities at the Southern Middleback Ranges Magnetite Concentrator

    By D Olwagen, C Stanton, J Gerber

    From December 2013 to February 2014 the Southern Middleback Ranges magnetite concentrator went through a successful optimisation process that included the installation of extra grinding power to treat

    Jul 13, 2015

  • AUSIMM
    A Geostatistical Contribution to Assess the Risk Embedded in Resource Classification Methods

    By J F. C L Costa, J C. Koppe

    It is recognised by the major international codes that resource classification involves the interaction of numerous qualitative and quantitative criteria such as data quality, geological and grade con

    Jan 1, 2009

  • AUSIMM
    Stochastic Production Scheduling – Solution through Langrangian Relaxation with the Branch-and-cut Algorithm

    By S Chatterjee

    The production scheduling of an open pit mine determines the optimal extraction sequencing that significantly impacts a mine’s life as well as net present value. The optimisation of production schedul

    Nov 24, 2014

  • AUSIMM
    A Non-Parametric Bayesian Framework for Automatic Block Estimation

    By A Melkumyan, F Ramos

    This paper addresses the problem of prediction of grade variables over volumes (block estimation) for an autonomous mine. Resource estimation is usually concerned with the prediction of the quality of

    Sep 26, 2011

  • AUSIMM
    Strategic thinking about long-term ‘above ground’ orebody complexity using scenarios

    By T Craske, J Sykes, T C. McCuaig, M Jessell, A Trench

    The prevalent strategic approach in the mining industry is one of planning. However, it is widely recognised that planning does not work in complex and uncertain situations (Mintzberg, 1994), such as

    Nov 21, 2018

  • AUSIMM
    A methodology for assessing stope design modifying factors for the Olympic Dam Mine

    By S Tierney, D Cumming-Potvin, I Thin, Y Potvin, D Grant

    The preliminary modifying factors for future stope design in the Southern Mine Area of Olympic Dam consisted of only a single, arbitrary value of Equivalent Linear Overbreak/Sloughing (ELOS). In order

    Mar 15, 2021

  • AUSIMM
    The Role of Rock Mechanics Models in Maximising Orebody Recovery

    Selection of mining methods, stope dimensions and stoping sequences is usually based on comparisons with other similar orebodies or rocktypes. Rock mechanics principles assist the process, which c

    Jan 1, 1986

  • AUSIMM
    Acid Rock Drainage Treatment Technologies ù Identifying Appropriate Solutions

    By N Murphy and, S Santomartino, M Cramer

    Acid rock drainage (ARD) can have detrimental effects on mining infrastructure, water reuse options and environmental discharge. As a result, some form of short- or long-term treatment is required at

    Jan 1, 2003