Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    BioHeap® – Breaking the Grade/Recovery Curve for Nickel Concentrators

    By J Fewings, T McCredden, S Seet, C Fitzmaurice

    "Flotation of nickel sulfide ores are generally constrained by nickel grade and impurity concentrations (notably magnesium and arsenic) in the product delivered to smelters. Being a physical separatio

    Oct 10, 2016

  • AUSIMM
    Ore Mineralogy and its Relevance for the Selection of Concentration Methods in the Processing of Brazilian Iron Ores

    By C C. Souza, S C. Amarante, A C. Arauj

    All major companies now producing iron ore in Brazil currently employ or are planning to employ some sort of concentration method to upgrade their fine sized products (sinter feed fines and pellet fee

    Jan 1, 2002

  • AUSIMM
    The challenges of the reuse of tailings and overburden

    By E M. Gama, L Resende

    The tailings are waste from mineral processing operations. The type of tailings of iron ore processing are classified into sandy tailings and mud. Already the overburden are showing significant levels

    Jul 23, 2018

  • AUSIMM
    Making use of potentially contaminating mine waste in cover design

    By N Jamson, T K. Rohde

    The Mine is an underground zinc (Zn), lead (Pb) and silver (Ag) operation in central New South Wales (NSW). Broadly speaking the Mine has two domains that require rehabilitation, the mine industrial a

    Jul 23, 2018

  • AUSIMM
    Improving the prediction of stope hanging wall dilution – a critical factor to the success of Dugald River

    By J Player, R de Vries, J F. Carswell, R Hassell

    "The feasibility of Dugald River mine was highly sensitive to mining and geotechnical design assumptions, particularly stope dilution and strike length. Following the start of initial mine development

    Oct 16, 2017

  • AUSIMM
    Evaluating All the Alternatives to Select the Best Project Strategy

    It is well known that the ability to influence project value reduces significantly as planning progresses and decisions regarding project parameters are made. However, at the prefeasibility stage in p

    Jan 1, 2007

  • AUSIMM
    Lithium ore processing – an overview of the current and new processes

    By N Setoudeh, A Nosrati, N J. Welham

    The current surge of interest in lithium (Li) is due to the anticipated demand for electric vehicles and small scale power storage. Brine deposits contain most of the global Li resource, however hard

    Sep 11, 2017

  • AUSIMM
    Strain-dependent Stiffness of the Weathered Melbourne Formation

    By Z Terzic, M Schult, D Chu, S Macklin

    The East West Link road tunnels are proposed to provide a connection between the CityLink toll road and the Eastern Freeway north of the Melbourne CBD. The alignment passes from Moonee Ponds valley be

    Sep 17, 2014

  • AUSIMM
    Process Design Aspects at Bendigo Mining's Gold Operations

    By T E. Hayward, D H. English, S J. Smith

    Gold mineralisation at Bendigo is exclusively associated with quartz reefs, commonly found within or near anticlinal fold hinges. The gold is typically coarse grained (0.5 mm to 5 mm), free milling an

    Jan 1, 2007

  • AUSIMM
    Continuous Monitoring of Mechanised Breaker Line Supports to Investigate Roof and Pillar Behaviour (11th International Conference on Ground Control in Mining)

    By Medhurst TP, Trueman R, Hutchinson IN

    A breaker line support (BLS) monitoring system, BLSmon, has been designed and constructed by the CSIRO and installed and commissioned at Laleham No.] Colliery, Queensland. This system was designed

    Jan 1, 1992

  • AUSIMM
    Proterozoic Iron Oxide-copper-gold Mineralisation in the Kangdian Region, South-west Yangtze Block, China – A Case Study on the Yinachang Fe-Cu-Au-Rare Earth Element Deposit

    By J Ding, H J Peng, S B. Zhu, L Hou, J R. Zhang, S Y. Wu

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Numerous Fe-Cu-Au-rare earth element (REE) deposits have been identified within the Palaeop

    Mar 18, 2015

  • AUSIMM
    The Underground Quarrying of Backfill Material - A Potentially Viable Option

    By A C. Robertson

    Studies by Tennent, Isokangas Pty Ltd (TIP) have indicated that underground quarrying of backfill may be a cost competitive option for providing backfill for specialised situations in underground mini

    Jan 1, 1998

  • AUSIMM
    Upgrading Low-grade Gold Ore Stockpiles by Preconcentration Using Ore Sorting – an Assessment of the Economic Impact and Viability

    By A N. Parry, G van Wyk

    "Sensor based automatic ore sorting technologies are used in the minerals industries to efficiently remove waste and submarginal grade material from crushed and screened run-of-mine (ROM) ore, produci

    Oct 10, 2016

  • AUSIMM
    The Use of New South Wales Coals in Large Pulverised Fuel Fired Boilers for Power Generation Purposes

    The Electricity Commission of New South Wales is the largest single user of coal in the State, burning some 8.5 million tonnes during 1972-73. This coal is converted in power stations into electrical

    Jan 1, 1975

  • AUSIMM
    Delineate Three-Dimensional Iron Ore Geology and Resource Models Using the Potential Field Method

    By A Guillen, J-P ChilFs

    Most 3D geological modelling tools were designed for the needs of the oil industry or detailed mine planning and are not suited to the variety of situations encountered in other application domains. M

    Jan 1, 2009

  • AUSIMM
    Project Development and Regulation Red Tape – A Comparative Analysis: Does It Need to Be So Complex?

    By C Pope, M Tannock

    Mining exploration and development projects in Australia are being negatively affected by the highly complex regulatory and bureaucratic processes at all levels of government. These processes affect m

    Jul 13, 2015

  • AUSIMM
    Technology for Mine Water Management General Report (944cdd0a-6520-484e-ae27-57a5f498ce74)

    PAPERS : 1 COMPUTER AIDED DESIGN OF MINE WATER MANAGEMENT - Z KESSERU 2 THE HYDROGEOLOGICAL PROBLEMS OF GROUNDWATER PROTECTION IN MINING REGIONS - V A MIRONENKO 3 WATER MANAGEMENT OF THE MAE MOH PRO

    Jan 1, 1988

  • AUSIMM
    Basic Oxygen Steelmaking in Australia

    Basic Oxygen Steelmaking (B.O.S.) commenced in Australia in December, 1962. Two 200-ton furnaces were installed initially at Newcastle with a 50-ton furnace coupled to a continuous casting machine

    Jan 1, 1972

  • AUSIMM
    A Retrospective Examination of the Impact of a Resource Rent Taxation Scheme on an Australian Mining Company

    By Blackwood R. L, Crichton G. P

    In recent years, the value to Australia of the introduction of a system of resource rent taxation on the mining industry has been frequently debated. The forms that this rate of return based tax c

    Jan 1, 1979

  • AUSIMM
    The Extent of Raceways in A Blast Furnace and its Dependence on Combined Blast Parameters

    By Golubkov OL, Fedotov PB, Shkylar FR

    One of the fundamental parameters of the race- way is its extent (a{ o), which has a significant effect on the distribution of gas and material flows in the lower region of the furnace. pp The known

    Jan 1, 1981