Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Negatively Geared Ore Reserves – A Major Peril of the Break-even Cut-off Grade

    "Recognising that the mining industry is wedded to the break-even cut-off grade rather than a cut-off grade that optimises value, the author examines some perils and pitfalls in the use of break-even

    Mar 8, 2016

  • AUSIMM
    Special Purpose Simulator for Improved Estimation of Day-to-Day CIL/CIP Recoveries

    Sampling of CIL/CIP circuits is typically done by compositing samples of feed and tails over eight or 12 hour periods. As the residence time in the leaching tankage may be approximately 20 hours, the

    Jan 1, 2006

  • AUSIMM
    Geomechanical modelling of the Ernest Henry iron oxide copper gold deposit – identifying fluid pathways to predict potential mineralised zones

    By J G. McLellan, B Miller

    Copper and Gold mineralisation at the Ernest Henry deposit is bound by two controlling shears along the hanging wall and footwall margins. The shear zone geometries have been influenced by a large dio

    Sep 20, 2017

  • AUSIMM
    The Fruta del Norte Epithermal Gold-Silver Deposit, South-East Ecuador

    By S Leary

    Diamond drilling since early 2006 has identified an epithermal gold-silver (Au-Ag) deposit beneath 140 m to >400 m of cover. The Fruta del Norte discovery had an inferred resource estimate of 58.9

    Jan 1, 2008

  • AUSIMM
    Design and testing of high capacity surface support

    By T Roberts, S Talu

    Steel wire weld mesh is a common industry standard surface support used in underground mining, traditionally installed with mining drills during the bolting cycle. As underground mining depth and stre

    Nov 30, 2018

  • AUSIMM
    Thermal Modelling and Mitigation Measures for the Bogong Power Development

    By D Wimpenny

    The Bogong Power Development Project in Victoria, Australia involved the construction of a 15 m long mass concrete plug up to 9 m in diameter within the head race tunnel. The plug is critical to thepe

    Mar 8, 2011

  • AUSIMM
    Resources and Reserve Assurance Processes – a Framework for Improved Governance

    By L J. de Lange

    As a material asset for mining entities, the resources and reserves (RR) estimation processes are surprisingly underrepresented in the assurance landscape. When press reports expose them being inaccur

    Jun 22, 2016

  • AUSIMM
    Adding Copper Recovery and Acid Consumption Variables to the Geological Model of Quebrada Blanca

    By R Schiller, E Chait

    "Quebrada Blanca is a porphyry copper deposit located in the Eocene-Oligocene belt of Chilean Andes. Operation started in 1994 and original reserves for supergene mineralisation gave a life-of-mine (L

    Jun 15, 2016

  • AUSIMM
    Reassessment of Controls on the Gold Mineralisation in the Nyankanga Deposit – Geita Gold Mines, North-Western Tanzania Mineralisation in the Nyankanga Deposit – Geita Gold Mines, North-Western Tanzania

    By M J. Nugus

    The Geita gold mines in north-western Tanzania have produced 5 Moz of gold from an estimated endowment of 15 Moz. They are generally classified as typical Archaean orogenic banded iron formations (BIF

    Aug 22, 2011

  • AUSIMM
    Managing Uncertainty on the Cut 8 Project

    By G M. Jones, J Rademan

    Debswana, owned by the Government of the Republic of Botswana (GRB) and De Beers in a 50:50 joint venture partnership, operates the Jwaneng diamond mine in Botswana - the most valuable diamond mine in

    May 24, 2012

  • AUSIMM
    Ultramafic Mine Tailings to Treat Acidic Mine Water and Lock Away Carbon through Mineral Carbonation

    By S Bouzalakos, W Timms, H Malli

    Combining ultramafic mine tailings and acidic mine drainage via mineral carbonation to sequester carbon dioxide, presents an opportunity to minimise waste on mine sites. Low pH mine water with trace e

    Jul 27, 2015

  • AUSIMM
    Exploration and Resource Modelling of the Goondicum Industrial Minerals Project, Central Queensland, Australia

    By H Hoogvliet

    The Goondicum Crater industrial minerals deposit is located about 30 km east of Monto, Central Queensland, Australia. Early exploration programs in the 1990s found alluvial ilmenite along the banks of

    Oct 5, 2011

  • AUSIMM
    Development of mine operation value chain flowsheets fine-tuned and constraint based on the process information (PI) data to evaluate proposed operation strategies and ore pre-treatment technologies

    By E Amini, N Beaton

    Application of ore pre-treatment technologies such as Grade Engineering and in-pit ore treatment require comprehensive analysis to show proven value is being generated by switching away from the curre

    Nov 10, 2020

  • AUSIMM
    Matching Brown Coal to the Next Generation of Latrobe Valley Projects

    By G Love, S Maher

    In Victoria’s onshore Gippsland Basin, geology is driving brown coal developments, and geologists are key decision-makers. Prompted by volatile energy prices and the likelihood of a carbon constrained

    Aug 18, 2014

  • AUSIMM
    Laboratory Experiments to Quantify the Pull-Out Strength of Single Strand Cable Bolts for Large Boreholes

    In high stress mining environments, production drill rigs are often employed for rapid drilling of boreholes for systematic cable bolting. One outcome of this drilling method is the need for larger bo

    Nov 25, 2010

  • AUSIMM
    Tailings process optimisation through automation and controls integration

    By R Williams, M Baxter, D Zink, R Cunningham

    The purpose of this paper is to discuss the efficient operation of a tailings dewatering circuit comprising a thickener and filter press through proper control and automation. It is common to see thi

    Jul 23, 2018

  • AUSIMM
    A Cost Comparison between Empirical and Engineered Support and Reinforcement Designs for Tunnels in a Low Stress Environment

    By L Nienaber

    Mines, after becoming operational, often retain the same support and reinforcement designs developed in the feasibility study. These designs are conceived from limited drilling data and regional exper

    Mar 8, 2011

  • AUSIMM
    Arsenic Depression in the Flotation of Broken Hill Lead Concentrates

    By Quast K

    A series of laboratory flotation tests were conducted to evaluate the effectiveness of various depressants as arsenic (and zinc) depressants in the lead cleaner stage of the NBHC mill at Broken Hill

    Jan 1, 1991

  • AUSIMM
    Effect of mud farming on the dewatering of bauxite residue

    By D J. Williams, C Zhang, F E. Herrera Cabrera

    Farming on bauxite residue using screw propelled equipment (SPE) has been commonly practised to accelerate dewatering and as it promotes consolidation and enhances storage capacity. However, it is unc

    Jul 1, 2021

  • AUSIMM
    Stable Isotopes and Ore Fluid Chemistry of Gold Mineralisation at Waitangi Deposit, Thames District, Coromandel Peninsula, North Island, New Zealand

    By C G. Ryan, D R. Cooke

    The Thames gold-silver deposits are part of the Hauraki goldfield, situated within the Miocene to Pliocene calc-alkaline Coromandel Volcanic Zone (CVZ). The Waitangi vein system is one of the minerali

    Jan 1, 1999