Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    A Numerical Model to Simulate the Effectiveness of Remedial Measures Aimed at Reducing Acidity and Metal Concentrations in the Ngakawau River and its Tributaries Near Stockton Coal Mine, West Coast, New Zealand

    By P Lindsay

    A numerical model has been developed to simulate the effectiveness and costs of a number of conceptual remedial measures aimed at reducing acidity and metal concentrations in the Ngakawau River and it

    Jan 1, 2006

  • AUSIMM
    Rock Mass Classification as an Aid to Estimating the Strength of Coal Pillars

    By Tyler DB, Thin LGT

    Coal mass strength properties must be estimated to obtain realistic estimates of coal pillar strength. The limitations of existing techniques for approximating these properties are discussed. The c

    Jan 1, 1992

  • AUSIMM
    Enhancing Project Value through a Designed High Pressure Grinding Roll Test Work Program

    By T Bookless, J Pownell, D Meadows

    The ever increasing trend of the gold price has meant that ore deposits that were previously considered too complex, or unattractive by virtue of their low gold grade, are now being investigated more

    Sep 26, 2013

  • AUSIMM
    Recovering Iron and Zinc Values from Steel Plant Dusts with Simultaneous Destruction of Organic Wastes: The EnvIRONment Process

    By Reilly L, Worner H. K

    The EnvIRONment process has been developed to treat steel works dust and organic wastes simultaneously. A pelletised feed is fed into a special DC electric furnace, the pellets becoming immersed in

    Jan 1, 1995

  • AUSIMM
    Oxygenation System Upgrades and Leach Plant Performance Improvements at Morila Gold Mine - 2009 to 2012

    By D M. Verster, P L. Gillot, A Kone

    Randgold ResourcesÆ MorilaÆs gold leach plant is subjected to uncommon æoxygen stressesÆ. Feed ores exhibit very high oxygen demands, primarily caused by iron sulfides. In addition, ore oxygen demand

    Sep 26, 2013

  • AUSIMM
    Optimisation Opportunities for High Pressure Grinding Rolls Circuits

    By B Davis, A H. Benzer, A N. Mainza, C M. Evertsson, L M. Tavares, M M. Hilden, M S. Powell, C Rule, G Asbj÷rnsson

    The Mogalakwena North Concentrator of Anglo Platinum Operations was built with the capability to allow for future projected expansion. Several research groups, currently working with Anglo American on

    Oct 29, 2012

  • AUSIMM
    Water Accountability and Efficiency at a Base Metals Refinery

    By K G. Harding, A Osman, A du Toit, F K. Crundwell, C M. Sheridan

    "Most mineral processing plants have high water requirements for their operational activities. These plants often function in an environment where water is becoming increasingly scarce. An increase in

    Nov 26, 2013

  • AUSIMM
    Gravity Gold Recovery in Obuasi Mines

    Mining operations in the Obuasi mine of AngloGold Ashanti Limited began in 1897 using mainly gravity concentration and amalgamation to recover the gold from predominantly high-grade quartz ores. The m

    Aug 1, 2010

  • AUSIMM
    Contemporary Criteria of Open Pit Long-Term Production Scheduling

    Production scheduling of open pit mining is a key area as it deals with the management of operating cash flows of mining companies. The efficiency of long-term schedules is usually assessed with econo

    Sep 26, 2011

  • AUSIMM
    Hydroseparation Concentrates and Automated Precious Metal Searches Used to Characterise Process Products from Selected Mines

    By R Lastra, Y Choi, C Hamilton, P Kondos

    Hydroseparation (http://www.cnt-mc.com) was used to concentrate sized fractions (from <38 ¦m to 150 ¦m) of various ore products ahead of carbon-in-pulp (CIP)-treatment. The resulting size-by-size c

    Jan 1, 2008

  • AUSIMM
    Project and execution of the excavation for a haulage shaft with raise boring techniques

    By M Orunesu Preiata

    The Odysseus Project is part of the high-grade Cosmos Nickel Complex that lies 30 km north of Leinster. The Odysseus definitive feasibility study (DFS) was approved by the Western Areas’ board in Octo

    Mar 29, 2023

  • AUSIMM
    Assessment of Robertson (2010a) CPTu state parameter inversion method within Been et al. (1987) CPTu inversion parameter framework

    By K Smith

    This paper presents an assessment of the Robertson (2010a) method within the CPTu inversion parameter framework of Been et al. (1987), using CPTu calibration chamber data presented by Jefferies and Be

    Jul 1, 2021

  • AUSIMM
    Influence of Shot Design Parameters on Fragmetation

    By Smith N. S, Rholl S. A, Otterness R. E

    The Bureau of Mines is conducting research to develop blast designs for the control of fragmentation and rock displacement and the reduction of overall mining costs. This Bureau experiment, a progra

    Jan 1, 1990

  • AUSIMM
    The Geology of the Browns Creek Gold-Copper Skarn Deposit, Blayney, NSW

    By Wilkins C

    The Browns Creek deposit is located 8 kin west of Blayney and 220 km west of Sydney (Figure 1), at lat 33¦32'S, long 149¦10'E on the Bathurst (SI 55-8) 1:250 000 scale map sheet. The total

    Jan 1, 1997

  • AUSIMM
    Common Infrastructure Project ù Development for the Future of PT Freeport Indonesia

    By B Mennie, R Poedjono, G Coad

    PT Freeport Indonesia operates a large copper and gold mining operation near Tembagapura, Papua (formerly, Irian Jaya), Indonesia. This is a remote location with its own set of unique operational char

    Jan 1, 2005

  • AUSIMM
    Gold Room Procedure at Lake View and Star, Ltd.

    Recovery of gold by smelting zinc dust concentrate has been carried on at Lake View and Star, Ltd., since July, 1930, when the Merrill-Crowe precipitation plant was first put into operation.Part I des

    Jan 1, 1948

  • AUSIMM
    Optimisation of Wash Water on an Iron Ore Spiral to Improve Grade

    By C M. Ramotsabi, F Bornman, W Erasmus

    Spiral concentrators are gravity based separation devices used for the preparation of coal, iron and heavy mineral ores (Wills, 1992). Gravity concentration remains the main separation method for fine

    Jul 13, 2015

  • AUSIMM
    Going beyond design at Newmont Boddington Gold

    By K Blay, C McCamley, P Petrucci

    The Newmont Boddington Gold (NBG) processing plant was designed for 35Mt/y with ball mills expected to deliver a combined new mill feed rate of 4837 tonnes/hr. Since beginning commercial production in

    Aug 29, 2018

  • AUSIMM
    Advances in Particulates Aggregation-Flotation Separation

    By J Rubio

    This work presents design features of an innovative in-line mixing helical (coiled) reactor for flocculation and flotation as a solid-liquid separation process for suspended particles (including liqui

    Jan 1, 2005

  • AUSIMM
    Local Scale Estimation of Sublevel Cave Stocks - Is it Possible? A Case Study in Reconciliation of Metal Production, Ridgeway Mine, New South Wales

    By T O&apos, Sullivan

    Reconciliation of metal production from a sublevel cave (SLC) mining operation is a complicated process. SLC reconciliation is unlike reconciliation for open stope operations, where a tonnage of extra

    Jan 1, 2006