Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Optimisation Opportunities for High Pressure Grinding Rolls Circuits

    By B Davis, A H. Benzer, A N. Mainza, C M. Evertsson, L M. Tavares, M M. Hilden, M S. Powell, C Rule, G Asbj÷rnsson

    The Mogalakwena North Concentrator of Anglo Platinum Operations was built with the capability to allow for future projected expansion. Several research groups, currently working with Anglo American on

    Oct 29, 2012

  • AUSIMM
    Remote Mining in the Canadian Arctic - The Falconbridge Limited Raglan Experience

    In February 1995, Falconbridge Limited approved the construction of a nickel mining and milling facility on its Raglan property situated in the Nunavik region of northern Quebec, Canada. The construct

    Jan 1, 1998

  • AUSIMM
    Gravity Gold Recovery in Obuasi Mines

    Mining operations in the Obuasi mine of AngloGold Ashanti Limited began in 1897 using mainly gravity concentration and amalgamation to recover the gold from predominantly high-grade quartz ores. The m

    Aug 1, 2010

  • AUSIMM
    Superior Productivity at Established Mines: Tapping Individual Diversity with Modern Management System for Higher Margins

    Maximising margins in today's competitive international commodity markets demands superior productivity. This requires more than simply selecting the best equipment. It requires efficient produ

    Jan 1, 1996

  • AUSIMM
    Project and execution of the excavation for a haulage shaft with raise boring techniques

    By M Orunesu Preiata

    The Odysseus Project is part of the high-grade Cosmos Nickel Complex that lies 30 km north of Leinster. The Odysseus definitive feasibility study (DFS) was approved by the Western Areas’ board in Octo

    Mar 29, 2023

  • AUSIMM
    Hydroseparation Concentrates and Automated Precious Metal Searches Used to Characterise Process Products from Selected Mines

    By R Lastra, Y Choi, C Hamilton, P Kondos

    Hydroseparation (http://www.cnt-mc.com) was used to concentrate sized fractions (from <38 ¦m to 150 ¦m) of various ore products ahead of carbon-in-pulp (CIP)-treatment. The resulting size-by-size c

    Jan 1, 2008

  • AUSIMM
    Assessment of Robertson (2010a) CPTu state parameter inversion method within Been et al. (1987) CPTu inversion parameter framework

    By K Smith

    This paper presents an assessment of the Robertson (2010a) method within the CPTu inversion parameter framework of Been et al. (1987), using CPTu calibration chamber data presented by Jefferies and Be

    Jul 1, 2021

  • AUSIMM
    Optimisation of Wash Water on an Iron Ore Spiral to Improve Grade

    By C M. Ramotsabi, F Bornman, W Erasmus

    Spiral concentrators are gravity based separation devices used for the preparation of coal, iron and heavy mineral ores (Wills, 1992). Gravity concentration remains the main separation method for fine

    Jul 13, 2015

  • AUSIMM
    Modification and adsorption of triazine collectors onto pyrite surfaces

    By X Zhang, Y Zhu, P E. Ngoepe, P P. Mkhonto, W Xiong, L Han, L Lu

    The triazine molecules have not been given much attention and they are potential collectors that may positively impact the mineral processing industry. The adsorption of triazine as collectors such as

    Aug 24, 2022

  • AUSIMM
    Going beyond design at Newmont Boddington Gold

    By K Blay, C McCamley, P Petrucci

    The Newmont Boddington Gold (NBG) processing plant was designed for 35Mt/y with ball mills expected to deliver a combined new mill feed rate of 4837 tonnes/hr. Since beginning commercial production in

    Aug 29, 2018

  • AUSIMM
    A Numerical Model to Simulate the Effectiveness of Remedial Measures Aimed at Reducing Acidity and Metal Concentrations in the Ngakawau River and its Tributaries Near Stockton Coal Mine, West Coast, New Zealand

    By P Lindsay

    A numerical model has been developed to simulate the effectiveness and costs of a number of conceptual remedial measures aimed at reducing acidity and metal concentrations in the Ngakawau River and it

    Jan 1, 2006

  • AUSIMM
    Local Scale Estimation of Sublevel Cave Stocks - Is it Possible? A Case Study in Reconciliation of Metal Production, Ridgeway Mine, New South Wales

    By T O&apos, Sullivan

    Reconciliation of metal production from a sublevel cave (SLC) mining operation is a complicated process. SLC reconciliation is unlike reconciliation for open stope operations, where a tonnage of extra

    Jan 1, 2006

  • AUSIMM
    Contemporary Criteria of Open Pit Long-Term Production Scheduling

    Production scheduling of open pit mining is a key area as it deals with the management of operating cash flows of mining companies. The efficiency of long-term schedules is usually assessed with econo

    Sep 26, 2011

  • AUSIMM
    Energy and Water Requirements in the Treatment of Refractory Gold Ores

    By R Dunne, J Dodd, J Snyder, F Roberto

    Energy costs are steadily increasing worldwide while the availability and quality of water are becoming contentious issues between the users (municipalities/households, agriculture, manufacturing and

    Sep 26, 2013

  • AUSIMM
    A Decade of Gravity Gold Recovery

    By A Bax, G Wardell-Johnson, W P. Staunton, J McGrath, J J. Eksteen

    Since 2001, the AMIRA P420 gold processing technology project series has been studying the recovery of gold using gravity devices, with particular emphasis on the centrifugal units, Knelson and Falcon

    Sep 26, 2013

  • AUSIMM
    Rock Mass Classification as an Aid to Estimating the Strength of Coal Pillars

    By Tyler DB, Thin LGT

    Coal mass strength properties must be estimated to obtain realistic estimates of coal pillar strength. The limitations of existing techniques for approximating these properties are discussed. The c

    Jan 1, 1992

  • AUSIMM
    Common Infrastructure Project ù Development for the Future of PT Freeport Indonesia

    By B Mennie, R Poedjono, G Coad

    PT Freeport Indonesia operates a large copper and gold mining operation near Tembagapura, Papua (formerly, Irian Jaya), Indonesia. This is a remote location with its own set of unique operational char

    Jan 1, 2005

  • AUSIMM
    Development of a new beneficiation plant for recovery of iron and apatite concentrates through wet tailing dams

    By M Saghaeian, A H. Baladastian, A Dehghani Ahmadabadi, V Sheikhzadeh, R Hejazi

    With the declining of high-quality hematite and magnetite iron ore reserves and the increasing accumulation of material resulting from mining and beneficiation operations that appear as lowquality dep

    Aug 24, 2022

  • AUSIMM
    Gold Room Procedure at Lake View and Star, Ltd.

    Recovery of gold by smelting zinc dust concentrate has been carried on at Lake View and Star, Ltd., since July, 1930, when the Merrill-Crowe precipitation plant was first put into operation.Part I des

    Jan 1, 1948

  • AUSIMM
    Tropicana - Unravelling the complexity of a +6 Million Ounce Gold Deposit Hosted in Granulite Facies Metamorphic Rocks

    By J Savage, A Crawford, M Doyle, N McNaughton, T G. Blenkinsop

    Area selection criteria for gold exploration have historically highlighted the low prospectivity of high-metamorphic grade terranes relative to regions with lower metamorphic grades. The Tropicana gol

    Sep 26, 2013