Search Documents

  • AUSIMM
    Gold Ore Treatment at Macraes Flat

    Macraes Mining Company Limited operates a 2.1 million tonnes per annum gold processing plant at Macraes Flat, Otago. This uses a conventional CIL route to treat oxide ore, and a flotation, grind, CIL

    Jan 1, 1992

  • AUSIMM
    Some New Ideas on the Age and Origin of the Etheridge Goldfield, Queensland, and their Exploration Implications

    Close spatial relationships between the deposits of the Etheridge Goldfield (23 000 kg of bullion) and various regional geological and geophysical features suggest that genesis of the ore deposits was

    Jan 1, 1980

  • SAIMM
    Catalyst management ? Synopsis

    By L. Hansen

    Sulphuric acid plants now and then see unexpected increases in SO2 emissions. Our experience is that it is not always easy for the acid plants to pinpoint the exact reason for the SO2 increase. Some

    Jan 1, 2009

  • CIM
    Highland Valley Copper: a strategy for increased productivity

    By Poul Hansen

    "In mid-I986, a world-class mining enterprise was created in British Columbia, bringing together the copper mining operations of Lornex Mining Corporation and Cominco into a new entity, Highland Valle

    Jan 1, 1987

  • NIOSH
    RI 6049 Heats And Free Energies Of Formation Of Calcium And Magnesium Vanadates ? Introduction And Summary

    By E. G. King

    The literature contains little thermodynamic information regarding inter-oxidic compounds of the ferroalloy elements and, as a result, thermodynamic considerations of extractive and utilization proces

    Jan 1, 1962

  • AUSIMM
    Significance of the Iron Oxide Outcrop at Mount Oxide, Queensland

    Significance of the body of iron oxide, which in part overlies as its hanging-wall the rich chalcocite ore-body at Mount Oxide, Queensland, has been variously interpreted by engineers and geologists w

    Jan 1, 1939

  • DFI
    Developing Effective Specifications For Tremie-Concrete Placement In Drilled Shafts

    By Giuliana A. Zelada-Tumialan

    Reduced workability and flowability of the concrete through the tremie tubes and drilled shaft reinforcement have been identified as the main causes of tremie-concrete drilled shaft concrete defects.

    Jan 1, 2009

  • NIOSH
    RI 7566 Recovery Of Cadmium And Nickel From Scrap Batteries

    By D. A. Wilson

    A cyclic leaching process was developed for selectively leaching and recovering cadmium from nickel-cadmium scrap battery waste. The six major steps in the process are the following: (1) washing the p

    Jan 1, 1971

  • SME-ICGCM
    The Effects of Reduced Annulus in Roof Bolting Performance

    By Stephen Tadolini

    The annulus thickness, for bolts anchored with resin, effects the systems final performance. Recent developments in the manufacturing process of these support systems, coupled with improved resin char

    Jan 1, 1998

  • DFI
    Design-Build of Watertight Underground Structures for Tunneling in Miami, Florida - The Norris Cut Utility Relocation Project

    By Eugene Mirsky, Eloy Ramos, May ElKhattab, John Wise, Terrence Carroll, Jose Torres

    In 2017, Nicholson Construction Company completed a $72.1 million design-build contract for Miami Dade Water and Sewer Department to replace an existing 54-inch diameter pre-stressed concrete force ma

    Jan 1, 2018

  • SAIMM
    Fluidized-bed technology for the production of iron products for steelmaking - Synopsis

    By F. J. Plaul

    The dominating technologies for steelmaking are the basic oxygen furnace (BOF or LD process, Linz-Donawitz) and the electric-arc furnace (EAF). The main iron input materials for both are liquid iron a

    Jan 1, 2009

  • NIOSH
    IC 8830 A Statistical Analysis Of Coal Mine Fire Incidents In The United States From 1950 To 1977

    By L. Bruce McDonald

    This Federal Bureau of Mines publication is a statistical analysis of all surface and underground coal mine fires reported in the United States from 1950 to 1977. Accounts of selected nonreportable fi

    Jan 1, 1980

  • AUSIMM
    The Purification of Zinc Sulphate Solutions Intended for the Electrolytic Recovery of Zinc

    The commercial application of electrolysis to zinc sulphate solutions for the production of metallic zinc is a development ·of the past twenty years. Earlier attempts failed to give satisfactory

    Jan 1, 1934

  • CIM
    Application of expert systems for peak power management

    By Y. L. Su, S. Vongpaisal, H. A. Smith

    "It is extremely difficult for a mine's central control room operator to control peakpower demands and to maintain normal materials handling operations at the same time. An investigation of the F

    Jan 1, 1993

  • SME-ICGCM
    Potential Of A Void Diffusion Model To Predict Longwall Subsidence In The Illinois Coal Basin

    In this paper, the authors attempt to apply a simplified non-homogeneous void diffusion model (NHVDM) to predict surface subsidence for longwall mining in Illinois. A generalized error function subsid

    Jan 1, 1990

  • AIME
    Reservoir Engineering - General - A Mathematical Model of Repeated Steam Soaks of Thick Gravity Drainage Reservoirs

    By G. E. Perry, R. D. Seba

    The steam soak process is the most widely applied and most successful thermal supplemental recovery process in use today. This process, which consists of injection of steam in various quantities into

    Jan 1, 1970

  • SAIMM
    Using Machine Carousel To Reduce Cladding Support Cycle At Pk2 Ventilation Shaft (311f8feb-63e6-4d23-980e-900e4671e984)

    By Braam Blom

    PK2 Ventilation shaft is part of Paardekraal No 2 twin shaft system that is being developed to replace depleting Merensky reef production at Paardekraal shaft complex. The sinking team at this shaft f

    Jan 1, 2009

  • NIOSH
    RI 8541 An Investment Mold for Titanium Casting

    By E. D. Calvert

    The Bureau of Mines, in its effort to promote greater utilization of domestically abundant materials, conducted reasearch on an alternate mold material that has commercial potential for titanium inves

    Jan 1, 1981

  • SAIMM
    Mineralogical, Petrographic And Geological Controls On Coal Ash Fusion Temperature From New Clydesdale Colliery, Witbank Coalfield, South Africa

    By S-L. Weeber

    Ash fusion temperature is the temperature at which the mineral matter in coal begins to soften, flow and fuse. It is an important parameter relating to coal utilization. Optimum ash fusion temperature

    Jan 1, 2000

  • AUSIMM
    Analysis of jig behaviour in coal preparation plants in China

    A wide-ranging base of jig data was collected from various types of commercial jigs in 9 coal preparation plants in China, and a complete data analysis was made. It was found that the sharpness ofsepa

    Jan 1, 1986