Breakthrough Outage at the Second Manapouri Tailrace Tunnel Project, New ZealandBy Charlie Watts, Ken Smales, Ron Fleming
The Manapouri Power Station is an underground hydro-electric station located in the South Island of New Zealand, and was constructed in the 1960s. Between 1997and 2002, a second 10m diameter tailrace
Jan 1, 2007
-
Development of a tool for assessing the environmental sustainability of mining facilitiesBy G. Gaidajis, K. Angelakoglou
The development of a tool for assessing the environmental sustainability of mining facilities is described in this study. The tool is based on the analysis of basic components of the examined system,
Jan 1, 2011
-
Evaluating Underground Mining Hazards By Fuzzy FMEABy S. K. Oraee
Managers always look for systems with minimum hazards. The hazards create problems for performance of projects. The largest and most important hazards of working underground mine can be related to he
Jan 1, 2011
-
Designing Wetland Treatments Systems For Long Term Treatment Of Mine Drainage - An Impossible Dream?By Paul Eger
The use of wetlands to treat mine drainage has become increasingly common, particularly as more information is available on their operation and construction. However, the lifetime of each system is s
Jan 1, 2005
-
The Construction of the Manhattan Water Tunnel, New York City ? IntroductionBy Edward (Ted) Dowey
City Water Tunnel No. 3 is being built in order to provide a redundant system for delivering 4,542,500 m3 (1.2 billion gallons) of water per day throughout the five boroughs of New York City. The pres
Jan 1, 2008
-
CFD Modeling Of Air Flow In An Open Pit MineBy W. Collingwood
As open pit mines continue to grow deeper and productivity continues to increase, the management of respirable dust and noxious gases can become a challenge. The natural wind flow in open pit mines i
Jan 1, 2011
-
Barrick Goldstrike Roaster Facility Roasting And Gas HandlingBy A. Cole, A. Bolland
The roasting and gas handling circuits at Goldstrikes' new Roasting Facility incorporate proven technologies in a unique combination. During the design of the plant, every effort was made to uti
Jan 1, 2001
-
Ventilation planning at Energy West?s Deer Creek MineBy L. Tonc
In 2004, the engineers at the Deer Creek Mine located near Huntington, Utah initiated the ventilation planning to exploit a remote area of the mine?s reserves. This area was located under a mountain w
Jan 1, 2009
-
Mechanized Rock Excavation In MiningBy George H. K. Schenck
In this decade of the 1.970's it is forecast that eight billion cubic yards of rock will be excavated from 400, 000 miles of new tunnels, drifts and other underground workings in the western worl
Jan 1, 1974
-
Mechanisms Involved In Reactive Flotation Of DolomiteBy A. El-Midany
Dolomite impurities are increasing in the currently mined phosphate deposits in Florida. Several research efforts have been conducted in various laboratories around the globe to find methods to econom
Jan 1, 2009
-
60 Years Of Rockbursting In The Coeur D’alene District Of Northern Idaho, USA: Lessons Learned And Remaining Issues (2002 SME Annual Meeting)By W. Blake, J. Whyatt
Sixty years of rockbursting in the Coeur d’Alene district has taught painful lessons and led to a number of practical advances in controlling rockburst hazards. This paper summarizes those lessons, co
Jan 1, 2002
-
Elm Road Generating Station Water Intake TunnelBy Brendan Reilly, Jon Isaacson, Paul McDermott
Kenny/Shea JV is constructing the water intake tunnel for the new Elm Road Generating Station, a supercritical coal-fired power plant in Oak Creek, Wisconsin, being built by Bechtel Power Corporation.
Jan 1, 2007
-
Impact Of Groundwater Chemistry On Wall Rock Chemical Leaching And Pit Lake CharacterBy D. Richers
When modeling predictive pit lake chemistry, groundwater chemistry is integrated with the affected portions of the wall rock and chemistry of the lake in a complex series of mixing. Fractions of the s
Jan 1, 2012
-
Research on the Roof Advanced Breaking Position of Large Mining Height Working Face in Shallow Coal SeamFully mechanized longwall mining with large mining heights (LMHs) in shallow-depth thick coal seams has been widely applied in Shenfu coalfield, China. Dynamic loading and rib spalling is serious when
Jul 28, 2020
-
Implementing a tracking and ventilation control system at Barrick Goldstrike?s underground divisionBy M. A. Meyer
Underground mining accidents in the USA in recent times have prompted the Mine Safety and Health Administration (MSHA) to review emergency and tracking systems for underground mines. Several communica
Jan 1, 2009
-
Development Of An On-Line Coal Washability Analysis System Using X-Ray Computed TomographyBy G. T. Adel, J. D. Miller, C. L. Lin
Washability analysis determines the maximum separation efficiency that can be achieved in the operation of coal preparation plants. Unfortunately, there are no on-line techniques for determining this
Jan 1, 2000
-
Determination Of Volumetric Changes From Laser Scanning At An Underground Limestone MineBy B. Slaker
The ability to detect and quantify ground movements in underground mine workings is of the utmost importance to the safety of miners and continuity of operations. Rib sloughage is one of the most comm
Feb 27, 2013
-
Disc Cutter Performance in Boulder-Laden Ground ? IntroductionBy D. S. Kieffer
Ground characterized by hard boulders embedded in soft matrix represents one of the most challenging conditions for TBMs, as the cutterhead must cope with the non-optimal conditions of cutting hard bl
Jan 1, 2008
-
Assessing Ground Ahead Of TBm Tunnel Using Low-Interruption Wireless Seismic Reflector Tracing SystemBy Takuji Yamamoto
High-speed TBM excavation requires rapid ground assessment ahead of excavation, particularly in complex grounds. The Tunnel Reflector Tracing technology (TRT) developed by authors, uses seismic reflec
-
Recovery Of Bitumen By Implementation Of Column Flotation In The Athabasca Oil SandsColumn flotation has been successfully implemented on a production scale in the Athabasca oil sands. In this application, bitumen is recovered and mineral matter is simultaneously rejected from a midd
Jan 1, 2012