Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SAIMM
    Pre-sink shaft safety analysis using wireline geophysics

    By N. Andersen

    During the preliminary design phases and feasibility study of a proposed vertical shaft, a vertical diamond drill-hole is normally drilled on the site. This paper outlines how rock mass characteristic

    Jan 1, 2015

  • SAIMM
    Classification of Roof Strata and Calculation of Powered Support Loads in Shallow Coal Seams of China

    By G. Song

    "SynopsisAccording to the overlying rock strength and thickness of 10 shallow coal seams in China, the strata are classified into four types: weak and laminated strata (hereinafter referred to as WL),

    Jan 1, 2015

  • SAIMM
    Sonic injection into a PGM Peirce-Smith converter: CFD modelling and industrial trials

    By G. A. Bezuidenhout, J. P. T. Kapusta, D. K. Chibwe

    "Peirce-Smith converters (PSCs) are extensively used in the copper, nickel, and platinum group metals industries. The typical converting operation involves lateral purging of air into molten matte thr

    Jan 1, 2015

  • SAIMM
    DC Arc Smelting Of Silicon: Is It Technically Feasible?

    By M. Abdellatif

    Keywords: Pyrometallurgy, furnace, DC arc furnace, smelting, silicon The technical feasibility of silicon smelting in a DC arc furnace was investigated. A graphite-lined furnace was operated at p

    Jan 1, 2011

  • SAIMM
    Beneficiation of Marble From Griekwastad, Northern Cape Province

    By N. P. Mahumapelo

    This paper is based on a study to determine the potential beneficiation opportunities for marble from Griekwastad in the Northern Cape Province. The marble was characterized mineralogically by X-ray

    Jan 1, 2014

  • SAIMM
    Assessing risk in grade-tonnage curves in a complex copper deposit, northern Brazil, based on an efficient joint

    By M. B. Fonseca

    Risk quantification in grade-tonnage curves is critical for capital investment in mining projects and can be obtained through geostatistical simulations of orebodies. A practical difficulty may arise

    Jan 1, 2003

  • SAIMM
    A Study Of Metal Dusting Corrosion On Fe- And Ni-Based Alloys - Synopsis

    By F. M. L. Mulaudzi

    Behaviour studies of metal dusting processes and associated filamentous carbon formation were undertaken on Alloys 600, 601, and 800 using a simulated metal dusting environment of 25C0-70H2-5H20 (vol.

    Jan 1, 2013

  • SAIMM
    Dp3 Tunnels Section

    Power Point Presentation

    Jan 1, 2007

  • SAIMM
    Introduction To Nuasahi Chromite Mine ? An Under Ground Chromite Mine

    By Vinay Kumar Agrawal, Rama Nath Praharaj

    IMFA Group is the largest producer of Charge chrome not only in India but also in Asia. This Group has plants situated at Therubali and at Choudwar. They also have a Thermal power plant at Choudwar wh

    Jan 1, 2007

  • SAIMM
    Processing low-grade coal to produce high-grade products

    By G. J. de Korte

    South Africa’s best-quality coal, located in the central Highveld basin, is becoming depleted and alternative sources of coal, such as the Waterberg coalfield, will have to be developed to supply the

    Jan 1, 2015

  • SAIMM
    Development Of High Resolution 3D Vertical Seismic Profiles - Synopsis

    By C. C. Pretorius

    3D seismic surveys have become a well-accepted method of imaging sub-surface geology in the Bushveld Basin. Because both the seismic sources and receivers are placed at surface, most surveys are limit

    Jan 1, 2011

  • SAIMM
    The Influence Of Mn On The Tensile Properties Of SSM-HPDC Al-Cu-Mg-Ag Alloy A201 - Synopsis

    A201 aluminium alloy is a high strength casting alloy with a nominal composition of Al-4.6Cu-0.3Mg-0.6Ag. It is strengthened by the O(Al2Cu) phase and the ??(Al2Cu) phase during heat treatment. Furthe

    Jan 1, 2011

  • SAIMM
    Trends in Productivity in the South African Gold Mining Industry

    By T. Tholana, P. N. Neingo

    "Mining companies globally are currently facing severe economic and financial challenges. In addition to global challenges, the South African mining industry has to face other operational challenges t

    Jan 1, 2016

  • SAIMM
    Nederburg Miner

    Research into the mechanisation of ore winning from the very narrow reefs characteristic of South African gold mines has been conducted from as early as 1964 through the Chamber of Mines Research Orga

    Jan 1, 2008

  • SAIMM
    The Road To NPV+

    By R. Hummel

    When the slope angles of the southern side of the Venetia open pit were required to be flattened by some 20 degrees after an analysis completed by De Beers geotechnical engineering in conjunction with

    Jan 1, 2001

  • SAIMM
    Outsourcing in the Mining Industry: Decision-Making Framework and Critical Success Factors

    By C. J. H. Steenkamp

    Theoretically, the main driver behind a mining operations? sourcing decision should differ from company to company, and within a company from project to project, but in reality it often relates to cos

    Jan 1, 2014

  • SAIMM
    The Youga Gold Project - A West African Project Financing Case Study (98dba44f-d023-4a1b-aa5b-2a4dc1105351)

    By J. Forwood

    The Youga gold mine in Burkina Faso, West Africa, is scheduled to produce first gold in the third quarter of calendar 2007. The project is expected to produce 540 000 oz of gold over 6.5 years, from

    Jan 1, 2007

  • SAIMM
    TEM Study Of Solid Titanium Oxides Inclusions In Steel Melt At 1600°C

    By C. -T. Mutale, A. S. Tuling

    Titanium can exist in three different oxidation states. Its oxides are numerous and in presence of iron and oxygen, iron-titanium oxide compounds can also form. Some of the oxides are non-stoichiometr

    Jan 1, 2004

  • SAIMM
    Strategic and tactical requirements of a mining long-term plan

    By B. J. Kloppers, J. V. Z. Visser, C. J. Horn

    "The long-term plan (LTP) in a mineral resource company is defined by the quality of the mineral resource and represents the result of a series of trade-offs to fulfil internal organizational as well

    Jan 1, 2015

  • SAIMM
    Limitations in Accepting Localized Conditioning Recoverable Resource Estimates for Mediumterm, Long-Term, and Feasibility-Stage Mining Projects, Particularly for Sections of an Ore Deposit

    A localized nonlinear recoverable resource estimate technique has been applied using typical feasibility or new mining drilling data configurations drawn from a massive database from a mined-out area

    Jan 1, 2014