Pre-sink shaft safety analysis using wireline geophysics
By N. Andersen
During the preliminary design phases and feasibility study of a proposed vertical shaft, a vertical diamond drill-hole is normally drilled on the site. This paper outlines how rock mass characteristic
Jan 1, 2015
-
Classification of Roof Strata and Calculation of Powered Support Loads in Shallow Coal Seams of China
By G. Song
"SynopsisAccording to the overlying rock strength and thickness of 10 shallow coal seams in China, the strata are classified into four types: weak and laminated strata (hereinafter referred to as WL),
Jan 1, 2015
-
Sonic injection into a PGM Peirce-Smith converter: CFD modelling and industrial trials
By G. A. Bezuidenhout, J. P. T. Kapusta, D. K. Chibwe
"Peirce-Smith converters (PSCs) are extensively used in the copper, nickel, and platinum group metals industries. The typical converting operation involves lateral purging of air into molten matte thr
Jan 1, 2015
-
DC Arc Smelting Of Silicon: Is It Technically Feasible?
By M. Abdellatif
Keywords: Pyrometallurgy, furnace, DC arc furnace, smelting, silicon The technical feasibility of silicon smelting in a DC arc furnace was investigated. A graphite-lined furnace was operated at p
Jan 1, 2011
-
Beneficiation of Marble From Griekwastad, Northern Cape Province
By N. P. Mahumapelo
This paper is based on a study to determine the potential beneficiation opportunities for marble from Griekwastad in the Northern Cape Province. The marble was characterized mineralogically by X-ray
Jan 1, 2014
-
Assessing risk in grade-tonnage curves in a complex copper deposit, northern Brazil, based on an efficient joint
By M. B. Fonseca
Risk quantification in grade-tonnage curves is critical for capital investment in mining projects and can be obtained through geostatistical simulations of orebodies. A practical difficulty may arise
Jan 1, 2003
-
A Study Of Metal Dusting Corrosion On Fe- And Ni-Based Alloys - Synopsis
By F. M. L. Mulaudzi
Behaviour studies of metal dusting processes and associated filamentous carbon formation were undertaken on Alloys 600, 601, and 800 using a simulated metal dusting environment of 25C0-70H2-5H20 (vol.
Jan 1, 2013
-
-
Introduction To Nuasahi Chromite Mine ? An Under Ground Chromite Mine
By Vinay Kumar Agrawal, Rama Nath Praharaj
IMFA Group is the largest producer of Charge chrome not only in India but also in Asia. This Group has plants situated at Therubali and at Choudwar. They also have a Thermal power plant at Choudwar wh
Jan 1, 2007
-
Processing low-grade coal to produce high-grade products
By G. J. de Korte
South Africa’s best-quality coal, located in the central Highveld basin, is becoming depleted and alternative sources of coal, such as the Waterberg coalfield, will have to be developed to supply the
Jan 1, 2015
-
Development Of High Resolution 3D Vertical Seismic Profiles - Synopsis
By C. C. Pretorius
3D seismic surveys have become a well-accepted method of imaging sub-surface geology in the Bushveld Basin. Because both the seismic sources and receivers are placed at surface, most surveys are limit
Jan 1, 2011
-
The Influence Of Mn On The Tensile Properties Of SSM-HPDC Al-Cu-Mg-Ag Alloy A201 - Synopsis
A201 aluminium alloy is a high strength casting alloy with a nominal composition of Al-4.6Cu-0.3Mg-0.6Ag. It is strengthened by the O(Al2Cu) phase and the ??(Al2Cu) phase during heat treatment. Furthe
Jan 1, 2011
-
Trends in Productivity in the South African Gold Mining Industry
By T. Tholana, P. N. Neingo
"Mining companies globally are currently facing severe economic and financial challenges. In addition to global challenges, the South African mining industry has to face other operational challenges t
Jan 1, 2016
-
Nederburg Miner
Research into the mechanisation of ore winning from the very narrow reefs characteristic of South African gold mines has been conducted from as early as 1964 through the Chamber of Mines Research Orga
Jan 1, 2008
-
The Road To NPV+
By R. Hummel
When the slope angles of the southern side of the Venetia open pit were required to be flattened by some 20 degrees after an analysis completed by De Beers geotechnical engineering in conjunction with
Jan 1, 2001
-
Outsourcing in the Mining Industry: Decision-Making Framework and Critical Success Factors
By C. J. H. Steenkamp
Theoretically, the main driver behind a mining operations? sourcing decision should differ from company to company, and within a company from project to project, but in reality it often relates to cos
Jan 1, 2014
-
The Youga Gold Project - A West African Project Financing Case Study (98dba44f-d023-4a1b-aa5b-2a4dc1105351)
By J. Forwood
The Youga gold mine in Burkina Faso, West Africa, is scheduled to produce first gold in the third quarter of calendar 2007. The project is expected to produce 540 000 oz of gold over 6.5 years, from
Jan 1, 2007
-
TEM Study Of Solid Titanium Oxides Inclusions In Steel Melt At 1600°C
By C. -T. Mutale, A. S. Tuling
Titanium can exist in three different oxidation states. Its oxides are numerous and in presence of iron and oxygen, iron-titanium oxide compounds can also form. Some of the oxides are non-stoichiometr
Jan 1, 2004
-
Strategic and tactical requirements of a mining long-term plan
By B. J. Kloppers, J. V. Z. Visser, C. J. Horn
"The long-term plan (LTP) in a mineral resource company is defined by the quality of the mineral resource and represents the result of a series of trade-offs to fulfil internal organizational as well
Jan 1, 2015
-
Limitations in Accepting Localized Conditioning Recoverable Resource Estimates for Mediumterm, Long-Term, and Feasibility-Stage Mining Projects, Particularly for Sections of an Ore Deposit
A localized nonlinear recoverable resource estimate technique has been applied using typical feasibility or new mining drilling data configurations drawn from a massive database from a mined-out area
Jan 1, 2014