Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Hydraulic Hoisting Technology For Platinum Mines
By G. van den Berg
Anglo Platinum has initiated a project to investigate hydraulic hoisting technology for platinum mines. Hydraulic hoisting systems are categorized as pumping, fluidizing feeder or displacement feede
Jan 1, 2004
-
The Effects Of Inert Matters And Low Volatile Coal Addition On The Plasticity Of High Volatile Zonguldak Coals
By V. Arslan
In this study, effects of the inert constituents, such as ash, and the effect of blending coals with differing rank and composition on the plasticity of coal blends were investigated. The reference co
Jan 1, 2006
-
Development Of Alternative Techniques For Matte Level Measurements In Sulphide Smelting Furnaces
By B. van Beek, J. Ndlovu, K. T. Hara, J. M. A. Geldenhuis
This paper describes the development of an alternative technique for measuring the matte level height in sulphide smelting furnaces. The initial studies involved applying electrochemical oxygen probes
Jan 1, 2004
-
The Strategic And Tactical Value Of A 3D Geotechnical Model For Mining Optimization, Anglo Platinum, Sandsloot Open Pit
Sandsloot open pit is situated on the northern limb of the Bushveld Complex, 250 km north east of Johannesburg, South Africa. Sandsloot is currently the largest open pit platinum mine in the world and
Jan 1, 2006
-
The Corrosion Behaviour Of Steel In Seawater
By H Möller
The purpose of this paper is to give an overview of the corrosion behaviour of steel in seawater. It is shown that the corrosion products (oxy-hydroxides and calcareous deposits) that are formed durin
Jan 1, 2006
-
Rock cut slope stability analysis in Sinpal-Ildong region using distinct element method
By J. H. Rhee, H. B. Ku, J. S. Lee, H. J. Park, B. S. Jang
A large wedge failure had occurred in the study area which was under construction. Therefore, in order to analyze the potential instability for this rock slope, the authors conducted numerical analys
Jan 1, 2003
-
A Lining Management System For Submerged Arc Furnaces
By Wayne Burmeister, Danie Benade, Louis Meyer, Hugo Joubert
What is not measured cannot be managed. This is true of most things, including a furnace lining. This paper describes a Lining Management System used for this purpose. It provides the operations st
Jan 1, 2007
-
Keynote: Address: A tribute to Prof. D.G. Krige for his contributions over a period of more than half a century
By R. C. M. Minnitt, W. Dr. Assibey-Bonsu, F. A. Camisani-Calzolari
Born in Bothaville (OFS) on the 26th August 1919, Daniel G. Krige grew up in Krugersdorp on the West Rand. Hematriculated from Monument High School in Krugersdorpin 1934 at the age of 15 and graduated
Jan 1, 2003
-
Net Present Value Maximization Model For Optimum Cut-Off Grade Policy Of Open Pit Mining Operations ? Synopsis
The optimum cut-off grade policy maximizes the net present value (NPV) of an open pit mining operation subject to the mining, processing, and refining capacity constraints. The traditional approaches
Jan 1, 2011
-
Ilmenite Smelting At Ticor SA (c5ed7b50-45b1-4be9-8346-a5752e8bd56e)
By H. Kotzé
Ticor SA began with a detailed feasibility study in 1995. The Hillendale mine (situated between Richards Bay and Empangeni) and mineral separation plant were approved in 2000. The smelter, just outsid
Jan 1, 2006
-
The Estimation Of Platinum Flotation Grade From Froth Image Features By Using Artificial Neural Networks - Synopsis
By C. Marais
The use of machine vision in the monitoring and control of metallurgical plants has become a very attractive option in the last decade, especially since computing power has increased drastically in th
Jan 1, 2011
-
Common-Sense Improvements To Electric Smelting At Impala Platinum (J o u r n a l P a p e r)
By V. Coetzee
In 1992, a paper was compiled highlighting a common-sense approach to electric smelting at Impala Platinum. Since then, the smelter complex has undergone considerable changes. Mineral economics, UG2 e
Jan 1, 2006
-
Large-scale infrastructure projects. Application of rock mechanics in geotechnical engineering to avoid delays in constrution time and increases of costs—case studies
By W. Wittke
SUMMARY: Geotechnical problems often lead to an increase of construction time and costs for large highway and railway projects. Some reasons, which have led to failures and thus to a delay of construc
Jan 1, 2003
-
Characterization Of Clay Mineral Fractions In Tuffisitic Kimberlite Breccias By X-Ray Diffraction
By J. Morkel
During research on mainly the weathering of kimberlite, it became evident that its mineralogical composition is an important factor in the complex process of physical and chemical disintegration. The
Jan 1, 2006
-
Underground Haulage Selection: Shaft Or Ramp For A Small-Scale Underground Mine
By B. Elevli
This paper deals with the selection of alternative accesses to a podiform chromite orebody in Turkey. The most important alternatives studied in a related project have been stated as a new vertical sh
Jan 1, 2002
-
Intelligent Gearing System - Solution To Understand And Correct Operational Conditions That Reduce he Fatigue Life Of A Girth Gear
By David Brown, Dirk van Dyk
Horizontal rotating mills are being used all over the world associated with different mineral and power generation industries. David Brown South Africa, with over 140 years of experience in gear manuf
Jan 1, 2007
-
The Performance Of Brunswick Mine?s Rockburst Support System During A Severe Seismic Episode
By B. Simser
At Brunswick Mine, an increase in the number of seismically-related falls of ground and in particular rockbursts occurred during 1999. This was due to the ever-increasing stress levels in the remaini
Jan 1, 2002
-
Formation, Characteristics And Utilisation Of Cogas Formed In Ferrochromium Smelting
By H. Krogerus, P. Niemelä, P. Oikarinen
High carbon ferrochromium is produced by carbon reduction. No replacement for carbon as reductant has yet been developed. The reduction creates a considerable amount of CO-gas. In open and semi-clos
Jan 1, 2004
-
Investigations into the residual strength of a 2.5 m wide Bushveld Merensky Reef crush pillar - Synopsis
By B. P. Watson
The first crush pillars on the Bushveld platinum mines were introduced at Union Section in 1978. Before the introduction of crush pillars, serious problems were experienced when stoping advanced to a
Jan 1, 2008
-
South African Coal Pillar Database
By J. N. Van der Merwe
The research described in the paper was aimed at providing standardized information of cases of failed and intact coal pillars in the form of databases to researchers. It also offered the opportunity
Jan 1, 2006