    Inco Limited Upper Blind Slot Raise 8M (25') to 12M (40') Longhole Carbide Drilling (L.C.D.) Method

    By Steven Richardson, E A. Cameron, Reza "Ray" Jambakhsh

    This paper outlines the design and implementation of a method to use Long hole Carbide drilling to blast an "Upper Blind Slot Raise" in the range of 12m (40 ft).

    Jan 1, 1992

  • ISEE
    Explosives Casting Technology in Surface Mining

    By D E. Shaw, J B. Case, J Gusek

    Explosive casting of overburden is defined as the use of explosives in blasting to move overburden to a spoil pile without rehandling. Studies of the economic feasibility of the method, and the formul

    Jan 1, 1980

  • ISEE
    Blasting Next to an Unsupported Road using Electronic Detonators

    By Tony Rorke, Sydney Thabethe

    A large overburden blast was carried out at Douglas Colliery, Middelburg Mine Services, close to a national road in South Africa. The road is a busy route between Witbank and Bethal and damage to the

    Jan 1, 2004

  • ISEE
    Knocking Down Barriers to QRA Acceptance

    By Jorge Flores, Dean Nichols

    Some view quantitative risk assessment (QRA) as difficult to understand and complicated to use. They are comfortable with the proven reliability of quantity distance (QD) and question the benefits of

    Jan 1, 2015

  • ISEE
    Charleroi Locks and Dam - Old River Wall Explosive Demolition

    By David Harrison

    The Charleroi Locks and Dam (Figure 1) was completed in 1932 and is located on the Monongahela River, approximately 22 miles (35 km) south of Pittsburgh, in Charleroi, Pennsylvania. It is comprised of

    Jan 1, 2015

  • ISEE
    How to Achieve 100% of Advance in Tunnel

    By Alan Diaz Butron, Eng. Thierry Bernard

    "In tunnel blasting the most challenging objective is definitively obtaining the maximum advanceassociated to a minimum overbreak. Achieving 100% of advance with no overbreak is the targetchallenge by

    Jan 1, 2017

  • ISEE
    Using An Anfo/coal Blended Blasting Mixture For Commercial Blasting Applications

    By Dennis Wilzbacher, John Wiegand

    In an effort to reduce the cost of bulk explosives, Vigo Coal Company found that the addition of coal mined at their Friendsville Mine, not only reduced explosive costs, but also appeared to actually

    Jan 1, 2007

  • ISEE
    The Investigation of Ground Vibrations Induced by Bench Blasting at Different Quarries at Catalca District in Turkey

    By Ali Kahriman, Abdulkadir Karadogan, Umit Ozer, Mehmet Aksoy, Deniz Adiguzel

    The environmental problems arising from ground vibration has been faced and discussed frequently in various industries such as quarry, mining, civil works, shaft, tunneling, pipe line and dam construc

    Jan 1, 2007

  • ISEE
    Demolition Blast of Heavily Reinforced Concrete Slab on Impermeable Layer

    By Ye Yuan, Jaak Daemen, Shaguo Yuan

    ABSTRACT: A 400m2 (480 yd2) heavily reinforced high-strength concrete slab 800mm (31 inch) thick had to be demolished. Underneath it was a 300mm (12 inch) thick underlying structure consisting of thre

    Jan 1, 2010

  • ISEE
    Case Study: Blasting with Air Decks to Maintain Performance While Saving Costs

    By Brian Lewis, Reinhold Daykin Schnell

    Blasting is the primary and most effective method for breaking and moving material at most mine sites. The blast design is often adjusted in efforts to optimize the effectiveness of the blasts’ explos

    Feb 6, 2023

  • ISEE
    Reducing Coal Damage And Loss With A New Blasting Technology

    By Tapan Goswami, Lloyd Hain, Geoff Brent

    For many years Ramp 24 at Ensham mine in Queensland, Australia has suffered substantial coal loss and damage due to the fragile nature of the coal and problematic geological conditions, which have pro

    Jan 1, 2008

  • ISEE
    Occidental's Resorts 7 and 8 Blasting Design and Results

    By Thomas E. Ricketts

    Occidental Oil Shale, Inc. constructed two commercial-sized modified in situ (MIS) retorts, Retorts 7 and 8, at its Logan Wash Oil Shale Mine in February and April 1981, respectively. One of the prima

    Jan 1, 1984

  • ISEE
    Community Response To Airblast And Vibration From Surface Charges

    By L. Wilson, M. Kotzel, T. Pienaar

    An empirical equation is presented for the maximum airblast from unconfined charges. This has been tested at a number of sites and with charges ranging from 0.1kg to 311kg. The equation is developed t

    Jan 1, 2011

  • ISEE
    A New Method for the Prediction of Blast Vibrations and Suggestions with Respect to Uniform Reference Values for Short-Time Vibrations

    By Robert Boehnke, Bernd Mueller

    This contribution presents an innovative, statistically supported method to predict blast vibrations in rock mass. For modelling the processes during and after detonation, a theory is employed which i

    Jan 1, 2004

  • ISEE
    Difficult Sinking Cut in Severe Winter Conditions Improves Productivity at Lac Des Iles Mines

    By Cary Moffat, John Kita, Rick Walker

    The Lac des Iles Mine, in an isolated area of NorthwesternOntario is a relatively new open pit platinum and palladium mine. They were encountering problems with the equipment and production scheduling

    Jan 1, 1996

  • ISEE
    Transforming Underground Blasting Operations into Primary Crushing Operations

    By Christopher Jon Preston, Troy Williams, Daniel Roy

    There has been significant progress made with narrow vein gold mines in which a second option for crushing has begun to attract attention. To ensure the profitability of a mine that has based its econ

    Jan 1, 2019

  • ISEE
    Effect of Geology and Mechanical Properties of Rock on Blast Results

    By Ph. D. Favreau, Favreau Patrice B. Eng, R. F.

    Geology is important in mining by helping to identify the rocks which contain sufficient valuable ore to justify their excavation. Geologists give a geological name to each rock type, so geology is a

    Jan 1, 2019

  • ISEE
    Rebuild of a Flash Smelting Furnace Using Explosives

    By Scott G. Giltner, Terry Millar, Ben Bringhurst

    "Kennecott Utah Copper (KUC) Smelter scheduled a rebuild of their flash smelting furnace forSeptember, 2014. KUC’s goal in this project was to reduce the rebuild time from 65 to 55 days by using explo

    Jan 1, 2016

  • ISEE
    Numerical Study on Controlled Blasting by Pre-cracked Notch

    By Kwang-Yeom Kim, Dong-Gyou Kim, Hyo-Kwan Yoon

    This study was intended to simulate the blasting model using notched-hole with numerical approach. Numerical analysis approach was applied to compare and evaluate the blasting model using notched-hole

    Jan 1, 2010

  • ISEE
    Profile, Profile, Profile

    By John Platt, Mark Stephens

    "When blasting is required in critical areas and anticipated shot movement and quick cleanup areessential to the success of the project it is extremely important to use the best technology available t

    Jan 1, 2016