Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Static And High Strain Dynamic Test Co-Relation Studies On Cast-In-Situ Concrete Bored Piles - Synopsis
By N. V. Nayak
Maharashtra State Road Development Corporation Ltd., has initiated a scheme for construction of 55 flyovers in Mumbai in India. To ensure speedier completion of projects several new technologies were
Jan 1, 2000
-
Izmit Bay Bridge Crossing: Integrated Multidisciplinary Approach Reduces Risk And Lowers Overall Project Cost For Bot Bridge Consortium
By Jacob Chacko
The Izmit Bay bridge, a 3-km-long suspension bridge crossing of Izmit Bay, Turkey is planned to be constructed in one of the most seismically active places in the world. The site, which has the poten
Jan 1, 2011
-
Common Sense Changed Conditions
By Bert R. Oastler
BERT R. OASTLER: Born Atlanta, Georgia, October 19, 1933; B.S. Civil Engineering, Duke University, 1956; Doctor of Laws, Emory University, 1966; Bryan Honor Society; Associate Editor, Journal of Publi
Jan 1, 1988
-
Driven Piles For New Pacific Northwest Baseball Park - Introduction
By Thomas M. Gurtowski
The New Pacific Northwest Baseball Park, now known as Safeco Field, is located directly south of the Kingdome in Seattle, Washington, and will be the new home of the Seattle Mariners baseball team. Th
Jan 1, 1998
-
Reconstruction Of Hudson River Pier 86 - Home Of The USS Intrepid Aircraft Carrier
By Michael Quadagno
Hudson River Pier 86, home of the historic USS Intrepid Aircraft Carrier and the Intrepid Sea-Air-Space Museum, is currently undergoing a $30M reconstruction. This project involves the demolition of t
Jan 1, 2008
-
A New Method of Quality Control for Construction Joints in Diaphragm Walls
By Nikolaus Schneider
"Abstract: The combination of failure in joints of diaphragm walls and their exposure to water pressure may have far reaching effects ranging from water leakage to the risk of catastrophic loss of sta
Jan 1, 2014
-
Geojet®-Turbojet® - A Deep Mixing Method For The Solution Of Geotechnical Problems
By Maurizio Siepi
The realisation of most of the civil engineering works is subordinate to the execution of consolidation works, in order to improve the soil physical-mechanics characteristics. The works classifiable w
Jan 1, 2002
-
Inaccurate Interpretation Of Offshore Geotechnical Site Investigation Results And Risk Associated - A Case Study Of Conductors Collapse In Driving
By Hodjat] [Shiri
A 4-legged jacket structure was installed by an Offshore Installation Contractor (OIC) in the Persian Gulf. In addition to four open-end pipe piles, six conductors were installed by OIC. During the in
Jan 1, 2006
-
Load Testing Of Steel Sheet Piling Driven With A Vibratory Hammer
By Drew Floyd
Five full-scale pile load tests were performed on pairs of PZ-22 sheet piles installed with a vibratory pile driving hammer. The sheet piling was installed in several locations in soil generally consi
Jan 1, 1989
-
Construction Considerations For Ground Modification Projects ? Synopsis
By J. P. Welsh
Ground Modification construction is rapidly evolving in the United States. An assessment of the construction status of Ground Modification methods with their dates of introduction and general acceptan
Jan 1, 2010
-
Skirt Suction Foundation - Application To Strait Crossings -
By Takashi Saito
Since early 1970?s skirt suction foundations (skirted foundation / bucket foundation) have been used as support for large fixed substructures or anchors for floating structures in offshore hydrocarbon
Jan 1, 2013
-
Piling Projects Constructed With Vinyl Polymer Support Fluid In Glasgow, Scotland
By Derek J. Lennon
Ground conditions in central Glasgow generally comprise loose granular deposits overlying stiffer soils. CFA piling would normally be preferred for urban sites in these ground conditions, but flightin
Jan 1, 2006
-
Newfoundland Transshipment Project: Design-Build Construction Of Oil Tanker Wharf Using Permanent Steel Jackets. - Summary:
By Alun J. Davies
This paper describes a design-build project for the construction of a tanker wharf for 150,000 dwt vessels. The tankers deliver oil from offshore oil fields to a Transshipment terminal on the south co
Jan 1, 2000
-
Kentucky Route 9 - Licking Pike Widening Design Build Slope Stabilization
By Frederick W. Slack
This paper will discuss the inherent value engineering associated with the design and construction of approximately 184,000 SF of anchored tieback wall, installed as part of the widening and drainage
Jan 1, 2003
-
Untangling The Octopus" Bored-In Pile Construction - On Nysdot Project D256424 Ithaca, New York - Executive Summary - Bored-In Pile Construction
By Andrew L. Peterson
CATOH Inc. of Weedsport, New York recently completed a very challenging Bored-In Pile project which features unique construction techniques in the installation and load testing of 45 and 100 ton capac
Jan 1, 1997
-
Interstate 70 Construction Through Glenwood Canyon, Colorado - Glenwood Canyon Construction
By Ray Schmahl
The Glenwood Canyon is a 13 mile long river gorge formed by the Colorado River approximately 2 miles East of Glenwood Springs, Colorado and approximately 150 miles West of Denver Colorado, (See Drawin
Jan 1, 1990
-
History Of Timber Piles And Preservation Techniques - A Presentation At The Deep Foundations Institute Annual Meeting Williamsburg, Virginia, December 1982
By Bruce Haldeman
Timber has been used as pile support for structures for 6,000 years. Some means of preservation of wood go back almost that far. Timber piles support all types of structures ? some are buried below th
Jan 1, 1984
-
"Value Engineering" In United States Of America
By Maral Papazian Bedian
Construction contracts in the USA contain the clause "Value Engineering" ? an interesting and curious clause allowing contractor initiated design changes. Misleading is the interpretation of value eng
Jan 1, 2002
-
Risk Mitigation Strategies For Cut And Cover Tunnels At The Mitchell Interchange
By Mark Maday
As part of the I-94 North-South Corridor reconstruction program, the Wisconsin Department of Transportation (department) is reconstructing the Mitchell Interchange in Milwaukee, Wisconsin. Located o
Jan 1, 2011
-
The Channel Tunnel Project - Historical Background
By C. J. Kirkland
For two thousand years and more, we insular Britons have been grateful for the existence of the narrow strip of water that separates us from mainland Europe. It has given us a sense of security agains
Jan 1, 1991